      Undertaking the construction of large attic floors, steel platforms, steel structure factories, steel structure canopies, and steel structure multi story factory buildings with attic floor slabs and cement layers. With years of production experience, precise technical exploration, and high quality!

      1. Design and construction of partition steel structure platform, equipment and cargo platform for indoor workshop and warehouse

      2. Raise the facade of high-rise buildings and jump floors; Bottom commercial layer, steel structure layer

      3. Production of steel structure partitions and villa steel structure attic;

      4. Old house renovation civil engineering and steel structure addition design;

      5. Design and installation of steel structure stairs and steel frame stairs;

      6. And processing and manufacturing of special-shaped steel structures, planting of steel bars, chemical anchor bolts, steel bonding reinforcement, carbon fiber reinforcement, various steel structure staircases, various warehouse steel structure interlayers, various newly built steel structures, insufficient reinforcement of various beams, slabs, walls, columns, and various building steel structure renovation and reinforcement construction;

      Steel structure partitions and interlayers belong to the secondary structure production, construction, and installation. Steel structure mezzanine is commonly used in ground level commercial buildings, households, and warehouses. The quality of steel structure partitions and mezzanine buildings is equivalent to the quality of the building for a certain number of years!

      The steel platform is designed by the shelving factory based on the site conditions, and then the various components of the steel platform are processed in the shelving factory and transported to the customer's site for installation. Usually, a two-story or three-level fully assembled steel structure platform is built on the existing workshop (warehouse) site, and the shelving space is reduced from one floor to two or three floors, doubling or tripling the original site space and fully utilizing the original site space.

      The process of building the attic platform

      Construction process:

      Construction site investigation - raw material procurement, inspection, and entry into the construction site - rust removal - cutting - re inspection of embedded parts - steel column hoisting - inspection and correction - welding - steel beam hoisting - inspection and correction - welding - support system installation - inspection and correction - welding - spraying anti rust paint - preliminary inspection of the main body - acceptance of Suzhou attic steel structure steel platform and steel structure staircase construction

      Layout of platform structure

      1. Meet the requirements of process production operations and ensure clearance for passage and operation. The general clear height for passage should not be less than 1.8m, and protective railings should generally be installed around the platform, with a height of 1M. When the platform height is greater than 2M, a skirting board with a height of 100-150mm should also be installed under the protective railing. The platform should be equipped with a ladder for up and down passage, and the width of the ladder should not be less than 600mm.

      2. When determining the plan size, elevation, beam grid, and column grid layout of the platform structure, in addition to meeting the usage requirements, the layout of beams and columns should also consider the location of equipment loads and other large concentrated loads on the platform, as well as the hanging of large-diameter industrial pipelines;

      3. The layout of the platform structure should strive for economic rationality and clear transmission of power. The arrangement of the beam grid should be adapted to its span. When the span of the beam is large, its spacing should also be increased. Fully utilize the allowable span of the pavement and arrange the beam grid reasonably to achieve better economic results.