Ningxia Yinchuan Highway Crack Prevention Patch Yingrun Production Crack Prevention Patch Manufacturer
Category:
building materials/Highway materials/Highway engineering materials
Model:
2.0mm
Brand:
Shandong Yingrun
brand:
Shandong Yingrun
Product Name:
Ningxia Yinchuan Highway Crack Prevention Patch
model:
2.0mm
material:
Modified asphalt polyester fiber
Specifications:
48cm wide
Scope of Application:
Old road renovation, municipal road maintenance
Processing & Customization:
yes
Whether it is imported:
No
Place of Origin:
Shandong
Retail Price
7.50USD
重量
kg
- Product Description
-
brand Shandong Yingrun
Product Name Ningxia Yinchuan Highway Crack Prevention Patch
model 2.0mm
material Modified asphalt polyester fiber
Specifications 48cm wide
Scope of Application Old road renovation, municipal road maintenance
Processing & Customization yes
Whether it is imported No
Place of Origin Shandong
Description :




Anti cracking stickers effectively solve the problem of road cracking, achieving the effects of road safety, durability, aesthetics, and comfort. The irregular and complex shape of surface cracks seriously affects the appearance and waterproof performance of the road surface. Anti cracking stickers used on highways can be directly applied to the road surface, eliminating the drawbacks of slotting and grouting in the past and avoiding secondary damage to the road surface. They are suitable for maintenance and construction of different grades of highways. This product has the advantages of easy construction, strong adhesion, wide working temperature range, long service life, and thorough crack sealing.
Crack resistant tape (also known as crack resistant tape) is a composite of asphalt based polymer, high-strength tensile tire base, high temperature resistant and asphalt compatible high-strength fabric. This product has self-adhesive properties, is easy to apply, and can be directly attached to cracks. This structure is an organic and comprehensive application of several measures to prevent cracks on highways.
Firstly, surface treatment
1. It is necessary to remove dust, water, and other debris from the adhered surface and keep the road surface dry and clean.
2. Cracks (joints) with a width between 5-19mm must be cleaned and filled with sealant.
3. Cracks (joints) and sunken areas with a width between 19-50mm must be cleaned, filled with adhesive sand, sealant or asphalt mixture, and compacted to the existing height.
4. Cracks or pits with a width exceeding 50mm must be cleaned first, and then filled with adhesive sand or hot asphalt mixture and compacted to the existing height.
5. For cracks (joints) and sunken areas with different heights, leveling treatment must be carried out.
6. For the protrusions on the bridge deck and road surface, they must be cleaned or leveled until they are smooth.
AfterSalesService :
Key words:- Ningxia Yinchuan Highway Crack Prevention Patch
More Products