Price of Urumqi pavement crack repair strip Karamay Turpan asphalt joint strip
Price of Urumqi pavement crack repair strip Karamay Turpan asphalt joint strip

Price of Urumqi pavement crack repair strip Karamay Turpan asphalt joint strip

Category:

building materials/Highway materials/Highway engineering materials

Model:

4cm wide

Brand:

moist and glossy

brand:

moist and glossy

Product Name:

Urumqi road crack repair patch

model:

4cm wide

material:

modified asphalt

Specifications:

15 meters long

Scope of Application:

Municipal engineering road maintenance

Processing & Customization:

yes

Whether it is imported:

No

Place of Origin:

Shandong

Retail Price

2.40USD


重量

kg

  • Product Description
  • brand

    moist and glossy

    Product Name

    Urumqi road crack repair patch

    model

    4cm wide

    material

    modified asphalt

    Specifications

    15 meters long

    Scope of Application

    Municipal engineering road maintenance

    Processing & Customization

    yes

    Whether it is imported

    No

    Place of Origin

    Shandong

    Description :

      Construction process of adhesive tape:

      Closed traffic ensures personnel safety - crack cleaning - adhesive tape bonding - manual compaction - traffic clearance

      1. Simple closure of traffic is mainly to ensure the safety of personnel, and the road can be opened directly after the joint tape is laid and compacted.

      2. Crack cleaning: Use a brush or hair dryer to clean the cracks on the road surface and 20cm around them. For severely damaged sections, use a grinder to polish the cracks to ensure bonding effect.

      3. Glue the seam tape, select the size of the pressure tape, remove the isolation paper, and stick it along the direction of the crack. When pasting, hold the sealing tape with one hand, and pinch the sealing tape with the thumb and index finger of the other hand along the direction of the crack with slight force to bond. At the same time, ensure that the excess width of the sealing tape on both sides of the crack is consistent. If the crack is longer, hold the sealing tape with one hand and use the other to hold the isolation paper, then press it onto the crack with your foot to ensure that the crack is firmly attached and prevent water leakage.

      4. Manual compaction, directly press with foot or repeatedly flatten with a roller.

      5. Traffic is allowed to pass, and once the sealing tape is applied and compacted, it is immediately opened to traffic. Through the rolling of passing cars, the sealing tape can be firmly attached to the road surface.

    AfterSalesService :

    Key words:
    • Urumqi road crack repair patch