Jiangxi 2.0mmHg HDPE geomembrane material price, construction price, installation fee
Jiangxi 2.0mmHg HDPE geomembrane material price, construction price, installation fee

Jiangxi 2.0mmHg HDPE geomembrane material price, construction price, installation fee

Category:

building materials/Geosynthetic materials/Geomembrane

Model:

Brand:

Zhengyu Geotechnical Materials

Retail Price

15.00USD


重量

kg

  • Product Description
  • Description :

      The situation of the 2mm thick geomembrane produced by Jiangxi 2.0mmHg HDPE Geomembrane Co., Ltd. is described as follows:

      1. Product thickness: 2mm thick

      2. Product Material: High Density Polyethylene (HDPE)

      3. Product density: 0.940

      4. Product Quality Execution Standards: GB/T17643-2011, CJ/T234-2006

      5. Product dimensions: regular width of 6 meters, 7 meters, 8 meters; Each roll is 30 meters long and 50 meters long.

      1、 Jiangxi geomembrane specifications and models [2.0HDPE geomembrane, 1.5HDPE geomembrane, 1.0HDPE geomembrane, 0.5HDPE geomembrane]; (Jiangxi) Geotextile Model Specifications [Permeable Geotextile, Filter Geotextile, Isolation Geotextile]; Jiangxi composite geotextile model specifications [one fabric, one membrane, two fabrics, one membrane, waterproof geotextile, anti-seepage geotextile]; (Jiangxi) Grass proof cloth【Cover grass clothTheweed control fabricGrass covering cloth, orchard grass proof cloth, ground cloth, horticultural ground cloth, polyethylene PE grass proof cloth, polypropylene PP grass proof cloth; Jiangxi bentonite waterproof blanket model specifications [GCL sodium based bentonite mat, 4500g sodium based bentonite waterproof mat, 4800g GCL sodium based bentonite mat, 5000g GCL sodium based bentonite mat, 5500g natural sodium based bentonite waterproof blanket]; Jiangxi Geotechnical Composite Drainage Network [5mm Height Geotechnical Composite Drainage Network, 6mm Height Geotechnical Composite Drainage Network, 7mm Height Geotechnical Composite Drainage Network, 6.3mm Height Geotechnical Composite Drainage Network, 7.5mm Height Geotechnical Composite Drainage Network]; Jiangxi EVA Waterproof Board [Tunnel EVA Waterproof Board Manufacturer, 1.0EVA Waterproof Board, 1.2EVA Waterproof Board, 1.5EVA Waterproof Board, 2.0EVA Waterproof Board].

      2、 Our company is a multi type geotechnical material production base enterprise in Jiangxi, producing high-density polyethylene 2.0mm geomembrane with a nominal thickness of 2mm, an average thickness deviation of -5%, a tensile yield strength of 29N/mm, and a tensile fracture strength of 53N/mm. The product has a width of 6 meters or 8 meters, and each roll is 50 meters or 100 meters long. This 2.0mmHg HDPE geomembrane is widely used for anti-seepage of oil tank foundations, petrochemical pipelines, oil storage tanks, oil fields, and accident slurry tanks; Landfills for household waste, solid waste logistics, industrial waste, hazardous materials, landfill coverage, sanitary waste landfill coverage, and sanitary waste landfill treatment stations; Gold mine anti-seepage, iron mine anti-seepage, copper mine anti-seepage, lithium mine anti-seepage, coal mine anti-seepage, tailings landfill, dissolution pool, ash yard anti-seepage; Black film biogas digester, biogas slurry pool, oxidation pond, sewage storage tank; Sewage treatment tank, leachate regulating tank, rainwater collection tank, anti-seepage reservoir, agricultural irrigation water tank, chemical wastewater tank; Golf course landscape lake anti-seepage, landscape river channel, garden water system, landscape lake, artificial lake, landscape water pool; Fish pond anti-seepage, shrimp pond, turtle pond, loach breeding pond, eel breeding pond, leech pond breeding.

      3、 Laying of geomembrane:

      Before laying HDPE geomembrane, the corresponding qualified acceptance certificate of civil engineering should be obtained.

      Before cutting HDPE film, its relevant dimensions should be accurately measured and then cut according to the actual size. Generally, it is not advisable to cut according to the dimensions shown in the diagram. Each piece should be numbered and recorded in detail on a dedicated form.

      When laying HDPE geomembrane, efforts should be made to minimize welding seams and save raw materials as much as possible while ensuring quality. It is also easy to ensure quality.

      4. The overlap width between membranes is generally not less than 10cm, and the welding seam is usually arranged parallel to the slope, that is, along the slope direction.

      5. Usually, in corners and deformed areas, the joint length should be minimized as much as possible. Unless otherwise specified, welding seams should be avoided as much as possible within a range of 1.5 meters from the top slope or stress concentration area on slopes with a gradient greater than 1:6.

      During the laying of HDPE geomembrane, artificial wrinkles should be avoided. When the temperature is low, it should be tightened and leveled as much as possible.

      After the installation of HDPE geomembrane, walking and moving tools on the membrane surface should be minimized as much as possible. Any objects that can cause harm to the HDPE membrane should not be placed on or carried on the membrane to avoid accidental damage to the membrane.

      4、 Welding of geomembrane:

      1. The welding process of the hot wedge welding machine is divided into: adjusting the pressure, setting the temperature, setting the speed, inspecting the overlap of the weld seam, installing the film into the machine, starting the motor, and applying pressure for welding.

      2. There should be no oil stains or dust at the joints, and the overlapping section of HDPE geomembrane should not contain mud or other debris. If there are any debris, they must be cleaned before welding.

      3. At the beginning of each welding day, a 0.9mm × 0.3mm sample must be tested and welded on site, with a lap width of not less than 10cm, and a tensile machine must be used for peeling and shearing tests on site. After the sample is qualified, it can be welded with the adjusted speed, pressure, and temperature at that time. The date, time, and ambient temperature should be indicated on the sample. During the welding process of the hot wedge welding machine, it is necessary to pay attention to the operation of the welding machine at all times and adjust the speed and temperature according to the actual situation on site.

      4. The weld seam should be neat, beautiful, and free from any sliding or jumping phenomena.

      When encountering insufficient length of geomembrane, longitudinal splicing is required. The transverse welds should be welded first, and then the longitudinal welds should be welded. If the distance between the transverse welds is greater than 50cm, they should form a T shape and not cross each other.

      6. Adjacent HDPE geomembrane welds should be staggered and overlapped as much as possible. The nodes formed between the membrane blocks should be T-shaped, and cross shaped joints should be minimized as much as possible. Extrusion welding machines should be used to strengthen the intersection points of the longitudinal mold and weld seams.

      7. When welding the film, it is not allowed to press out dead folds. When laying HDPE geomembrane, the expansion deformation caused by temperature changes should be reserved according to the local temperature change amplitude and the performance requirements of HDPE geomembrane.

      When the temperature control of the handheld welding machine indicates that the welding machine temperature is below 200 ℃, it should be wiped off with a clean cloth or cotton yarn before welding, and if necessary, re polished. Do not wipe it with your hands.

      When there is condensation, moisture, mud, or other factors affecting the joint, welding should be carried out after treatment.

      10. Welding cannot be carried out during rainy periods or when there is moisture, dew, or large sand in the joints, except for taking protective measures.

      When the temperature is below 5 ℃, construction should not be carried out according to the specifications. If construction is necessary, the welding machine should be preheated before welding.

      During the welding process of the extrusion welding machine, the slider of the gun head should be checked regularly. If the wear is severe, the slider should be replaced in a timely manner to avoid damaging the film surface.

      13. HDPE anti-seepage film should be powered by a generator with good voltage stabilization performance during welding. In special cases where local electricity is used, a voltage stabilizer must be used.

    AfterSalesService :

    Key words:
    • Jiangxi 2.0mmHg HDPE geomembrane