Heilongjiang HDPE anti-seepage film industrial landfill, smooth 1.5HDPE film
Category:
building materials/Geosynthetic materials/Geomembrane
Model:
1.5mm
Brand:
Zhengyu
Retail Price
12.00USD
重量
kg
- Product Description
-
Description :







The company manufactures and sells woven geotextiles (also known as horticultural ground cloth, grass proof cloth), composite films, waterproof blankets, carpets, waterproof boards, woven fabrics, woven bags, ecological bags, geogrids, geogrids, geogrids, geonets, waterstops, waterstops, HDPE pipes, HDPE film materials, blind ditches, waterproof and drainage combinations, expansion joints, drainage board products, Chongqing HDPE geomembrane digesters, sales and construction of 1.5 smooth HDPE films, and engages in import and export business. The woven geotextile produced by the company, also known as grass proof cloth, is divided into 90 grams of grass proof cloth (garden cloth) and 100 grams of garden cloth (grass proof cloth), which are sold both domestically and internationally and widely used in agricultural planting and green agriculture promotion. Annual production of 26 million square meters of woven geotextile (grass proof fabric), with advanced production equipment. There are 6 sets of 4-meter-wide horticultural geotextile (grass proof fabric) production equipment (circular weaving machine), 1 set of 6.2-meter-wide geotextile production equipment (circular weaving machine), 5 sets of 6-meter-wide grass proof fabric (circular weaving machine) equipment, 3 sets of 4-meter-wide flat weaving machines, and 1 set of 8-meter-wide horticultural geotextile equipment (circular weaving machine). The Heilongjiang HDPE anti-seepage film industrial landfill has a smooth 1.5HDPE film platform. This 8-meter-wide production equipment is currently the largest woven geotextile (grass proof fabric) production equipment in China. Beijing single rough surface HDPE membrane sewage treatment tank, 1.5HDPE geomembrane company is the largest manufacturer of woven geotextile (grass proof fabric) in China. The company has precision testing instruments, Jiangxi HDPE anti-seepage membrane slurry pool, advanced quality control technology and strict quality management system for GH-2S 1.5HDPE geomembrane, and has passed IS9001-2000 quality system certification. The quality is stable and reliable, with an annual output of 10000 tons, ranking well in China. The product price is reasonable, the after-sales service is complete, and some products are exported both domestically and internationally. Our company's products are widely used in agricultural planting, orchards, greenhouses, seedling cultivation, flower cultivation, highway, railway, tunnel, underground pipeline construction, landfill engineering, reservoir and salt lake anti-seepage engineering, and dam construction. Heilongjiang HDPE anti-seepage film industrial landfill, smooth 1.5HDPE film
Heilongjiang HDPE anti-seepage film industrial landfill, smooth 1.5HDPE film
Construction and installation of HDPE geomembrane
Cutting and transportation of HDPE film
According to the measurement records of the laying base surface, record the number of the cut large bundles of geomembrane and transport them to the laying site according to the number. Attention, do not drag or forcefully pull the geomembrane during transportation to avoid sharp objects from puncturing it.
2. HDPE geomembrane laying construction and installation
1) It should extend from the bottom to the top, covering the Inner Mongolia high-density polyethylene film landfill site. Do not pull the HDPE film too tightly with 1.5 anti-seepage film, and leave a 1.50% margin for local sinking and stretching. Considering the actual situation of this project, the slope will be laid in a top-down sequence.
2) The longitudinal joints of adjacent HDPE anti-seepage membranes should not be on the same horizontal line and should be staggered by more than 1M from each other.
3) The longitudinal joint should be at least 1.50m away from the dam foot and bend foot, and should be set on a flat surface.
4) First, lay HDPE geomembrane on the slope and then lay HDPE anti-seepage membrane on the bottom of the field.
5) When laying anti-seepage film on slopes, the direction of the film should be basically parallel to the larger slope line.
Slope laying control: Before laying the anti-seepage geomembrane on the slope, the Heilongjiang HDPE anti-seepage film industrial landfill site will inspect and measure the laying area with a smooth 1.5HDPE film. Based on the measured size, the anti-seepage film that matches the size in the warehouse will be transported to the first phase anchoring ditch platform. During laying, a convenient method of "pushing and laying" from top to bottom will be adopted according to the actual conditions on site. In the fan-shaped area, it should be cut reasonably to ensure that both the upper and lower ends are firmly anchored.
Liaoning geomembrane industrial landfill site, 1.5HDPE anti-seepage membrane
AfterSalesService :
Key words:- Heilongjiang anti-seepage membrane
More Products