Shanxi horizontal natural gas storage tank factory price, low-temperature container, LNG storage tank contracting, after-sales service
Category:
mechanical equipment/Storage and transportation equipment/storage tank
Model:
CFW60-0.8
Brand:
Zhongjie Special Equipment
Retail Price
295,000.00USD
重量
kg
- Product Description
-
Description :
Shandong Zhongjie Special Equipment Co., Ltd., in order to ensure the safe production and equipment operation of the enterprise,Pressure storage tankThe service life and labor production efficiency of pressure storage tanks must be regularly inspected and maintained to prevent problems that may affect production or cause casualties due to mechanical accidents. Based on actual production, safety operating procedures, and safety maintenance management systems, annual maintenance and repair of pressure storage tanks have been developed through research. And the precautions for safety maintenance are also very important.
1. Pressure storage tanks storing flammable gases and liquids should be equipped with necessary fire-fighting equipment. Smoking, open flame lighting, heating, and bringing their ignition sources into the tank area are strictly prohibited.
2. For pressure storage tanks storing flammable, explosive, toxic, corrosive and other media, relevant regulations on hazardous material management should be strictly implemented.

.
3. Before inspecting and repairing pressure storage tanks, the power supply of electrical equipment related to the pressure storage tanks must be cut off, and equipment handover procedures must be completed.
4. After the internal medium of the pressure storage tank is exhausted, the inlet and outlet valves should be closed or blind plates should be added to isolate the pipelines and equipment connected to it, and clear isolation signs should be set up.
5. For pressure storage tanks containing flammable, corrosive, toxic, or suffocating media, they must undergo replacement, neutralization, disinfection, cleaning, and other treatments, and be analyzed and inspected after treatment. The analysis results should meet the requirements of relevant specifications and standards. It is strictly prohibited to replace flammable media with air.
6. A permit for working inside a pressure storage tank must be obtained. Due to prolonged interruption of work, a new work permit for the tank should be issued.






AfterSalesService :
Key words:- Horizontal natural gas storage tank
More Products