A2 level pressure vessel qualification, propane storage tank production, high-quality liquefied gas station installation
A2 level pressure vessel qualification, propane storage tank production, high-quality liquefied gas station installation

A2 level pressure vessel qualification, propane storage tank production, high-quality liquefied gas station installation

Category:

mechanical equipment/Storage and transportation equipment/storage tank

Model:

WGG50-1.77

Brand:

Zhongjie Special Equipment

Retail Price

98,000.00USD


重量

kg

  • Product Description
  • Description :

      basis of preparation

      1. Code for Construction and Acceptance of Chemical Machinery Installation Engineering (General Provisions) HG20203-2000

      2. Petrochemical Standard SH-T3543-2007

      3. Code for Construction and Acceptance of Mechanical Equipment Installation Engineering GB50231-2009

      4. Code for Construction and Acceptance of Compressor, Fan, and Pump Installation Engineering GB50275-2010

      5. Code for Construction and Acceptance of Chemical Tower Equipment HGJ211-1985

      6. Code for Construction and Acceptance of Automation Instrumentation Engineering GB 50093-2013

      Ensure safety production measures

      Safety production should conscientiously implement the policy of "safety and prevention first" and fully implement the principle of "whoever is in charge is responsible". Strengthening construction safety management, with a focus on implementing the "Shandong Province Labor Safety Regulations" and the "Construction Law of the People's Republic of China".

      1、 According to the company's (2015) 75 good document "Interim Law on Strengthening Engineering Project Management", the implementation of the safety production project experience responsibility system is stipulated, and the safety production management of the project management department is strengthened, with the project experience department as the foothold for safety production. The project manager is the person in charge of safety production management and is responsible for the safety management of the entire process, all aspects, and all staff of the construction project.

      2、 Strengthen the safety production management procedures, and start construction projects must apply for a "Notice of Project Start" and a "Safety Review Form". It is necessary to prepare targeted safety technical disclosure based on engineering and specific situations, and ensure that everyone signs it.

      3、 Establish a safety leadership group for the project management department, with safety officers assigned to each team. The safety leadership team of the project management department should conduct regular inspections, promptly eliminate hidden dangers, and carry out safety education and self inspection work. At the same time, it is necessary to contact the safety departments of the construction unit and relevant units, accept supervision, and comply with their relevant production rules and regulations.

      4、 Serious attention should be paid to the utilization of the "Three Treasures" on site. Safety helmets with code names should be used when entering the construction site. Violators should be criticized and educated, and economic sanctions should be imposed. In serious cases, the construction site should be cleared. The temporary electrical equipment on site should be installed according to the formal engineering and regularly inspected. Electrical equipment should be managed and operated by dedicated personnel. Electric tools should have grounding protection wires and leakage protection measures, and live working is not allowed. At the same time, emphasis should be placed on lifting and transportation work, and lifting equipment should be regularly inspected and not operated with defects.

      5、 Fire prevention and firefighting equipment and tools should be installed on the construction site. There should be prominent safety slogans, slogans, bulletin boards, etc. on the construction site. Improve the safety awareness of construction personnel, enhance their consciousness and self-protection ability.

      6、 When moving construction tools, vehicles, etc., attention must be paid to the distance between ground and underground obstacles such as high-voltage lines, communication lines, and buildings.

      7、 When excavating soil on the road, color steel fences should be set up and red lights should be hung at night for warning. The distance for quality inspection of excavation workers is greater than 4m, and workers are not allowed to rest near the soil slope.

      8、 Construction personnel should wear safety belts when working on trench scaffolding to prevent falling into the trench.

      9、 Strengthen electricity management, and non personnel are strictly prohibited from repairing electrical equipment and power sources; Electrical equipment must strictly implement the principle of "one switch, one use", with electric shock protection devices installed. Wires, power supplies, and equipment should be regularly inspected to prevent accidents such as electric leakage that may cause injury. Use 36V point lighting for the top pipe operation pit.

      10、 Regularly inspect lifting equipment and rigging. Before lifting the pipeline, a trial lift should be conducted. When lifting heavy objects, the vehicle should be slowly driven to check if it is malfunctioning and if the lifting equipment is safe and reliable. A dedicated person should be assigned to command and coordinate the lifting process.

      11、 Earthwork transportation must strictly comply with traffic regulations and relevant municipal requirements to prevent traffic accidents. The mechanical equipment, vehicles, and storage entering the site are orderly, and the safe roads are unobstructed. In case of emergency, they can be promptly evacuated. No unlicensed personnel are allowed to drive vehicles or operate mechanical equipment.

      12、 Before construction, a careful investigation should be conducted on the installation of underground buried parts to prevent electric shock caused by cable breakage, terminal communication and power supply accidents, and to prevent gas pipeline leakage from causing poisoning and fire.

      13、 Protect public facilities within the road area, especially underground pipeline facilities, arrange dedicated personnel to supervise and implement protective measures on the heads of each construction worker, ensuring that everyone pays attention and protects.

      14、 Once a safety accident occurs during construction, the project construction shall be immediately stopped and the cause shall be reported in a timely manner. After implementing corrective measures and obtaining approval from relevant departments, construction can continue.

      15、 Strictly implement technical measures for rainy season construction.