Steam boiler prices in the building materials industry, Zhongjie equipment supply, industrial boilers
Steam boiler prices in the building materials industry, Zhongjie equipment supply, industrial boilers

Steam boiler prices in the building materials industry, Zhongjie equipment supply, industrial boilers

Category:

mechanical equipment/Industrial boilers and accessories/Gas boiler

Model:

WNS6-1.25-Q

Brand:

Zhongjie Special Equipment

model:

WNS6-1.25-Q

fuel:

natural gas

output power:

four thousand and two hundred

intake flow:

four hundred and thirty

exhaust gas temperature:

one hundred and ninety-three

pressure ratio:

zero point eight

thermal efficiency:

ninety-eight point five

Processing & Customization:

yes

Overall dimensions:

4883×2349×2845

Equipment weight:

twelve thousand and eight hundred

combustion mode:

Indoor combustion furnace

outlet pressure:

low pressure

Boiler usage:

industrial boiler

Installation method:

Quick installation boiler

fuel consumption:

319Nm3/h

structural form:

horizontal

cycle mode:

Natural circulation boiler

Place of Origin:

Shandong Zhongjie

Retail Price

286,000.00USD


重量

kg

  • Product Description
  • model

    WNS6-1.25-Q

    fuel

    natural gas

    output power

    four thousand and two hundred

    intake flow

    four hundred and thirty

    exhaust gas temperature

    one hundred and ninety-three

    pressure ratio

    zero point eight

    thermal efficiency

    ninety-eight point five

    Processing & Customization

    yes

    Overall dimensions

    4883×2349×2845

    Equipment weight

    twelve thousand and eight hundred

    combustion mode

    Indoor combustion furnace

    outlet pressure

    low pressure

    Boiler usage

    industrial boiler

    Installation method

    Quick installation boiler

    fuel consumption

    319Nm3/h

    structural form

    horizontal

    cycle mode

    Natural circulation boiler

    Place of Origin

    Shandong Zhongjie

    Description :

    ingas boilerHow can we achieve scientific and effective daily maintenance?

    01

    Combustion engine maintenance. Specific method: Thoroughly clean the rotating cup plate, ignition device, filter, oil pump, motor, and impeller system of the gas boiler burner, and apply lubricant to the damper connecting rod device.

    02

    Maintenance of gas boiler controller. Specific methods: Inspect and test the electrical components, control circuits, and control points of the controller, clean the dust collection in the control box, seal the controller to prevent moisture from affecting the controller components.

    03

    Maintenance of gas boiler feedwater system. Specific methods: Inspect the water treatment device, check if the water quality meets the standard, thoroughly clean the water treatment system, check the operation and head of the feed pump, and check if all pipeline valves can be used flexibly.

    燃气锅炉的保养和检修

    04

    Furnace maintenance. In order to ensure the long-term, safe, and economical operation of gas boilers, it is necessary to perform proper furnace maintenance on a daily basis. In practice, common methods for furnace maintenance include wet maintenance and dry maintenance (wet maintenance is generally suitable for gas boilers with a shutdown period of no more than one month, while dry maintenance is suitable for gas boilers with a longer shutdown period), as follows:

    (1) Wet maintenance. Specific method: After shutting down the furnace, drain the furnace water, thoroughly remove the internal dirt, rinse it clean, refill with treated water until fully filled, heat the furnace water to 100 ℃, allow the gas in the water to be discharged from the furnace, and then close all valves. However, it should be noted that moisturizing methods should not be used in cold climates to prevent the boiler water from freezing and damaging the gas boiler.

    (2) Dry maintenance. Specific method: After shutting down the boiler, drain the boiler water, thoroughly remove the internal dirt, rinse it clean, and dry it in the furnace with low heat (be careful not to use high heat). Then, install the block shaped quicklime with a diameter of 10-30 millimeters in separate trays and place it in the gas boiler drum, avoiding contact between quicklime and metal. The weight of quicklime is calculated as 8 kilograms per cubic meter of drum volume. Then, close all hand hole pipeline valves and check them every three months. If the quicklime is broken, replace it immediately. When the boiler is restarted, remove the quicklime and tray.

    Specific method: Thoroughly clean the burner rotor, ignition device, filter, oil pump, motor, and impeller system, and apply lubricant to the damper connecting rod device.

    AfterSalesService :

    Key words:
    • Steam boilers in the building materials industry