Jiaao Vegetable Greenhouse Radiant Tube Heater Radiant Tube Radiator Hanging Method D133-2000-5
Category:
hardware/plumbing hardware /Radiator
Model:
D133-2000-5
Brand:
Jiaao
brand:
Jiaao
model:
D133-2000-5
structural type:
Pipe type
Principle Type:
Convective heat dissipation
material:
steel
Processing & Customization:
yes
Installation type:
wall-mounted
surface treatment:
Rust proof paint, silver powder
Specifications and Dimensions:
two thousand
Place of Origin:
Hengshui, Hebei
manufacturer:
Jiaao Heating
Retail Price
200.00USD
重量
kg
- Product Description
-
brand Jiaao
model D133-2000-5
structural type Pipe type
Principle Type Convective heat dissipation
material steel
Processing & Customization yes
Installation type wall-mounted
surface treatment Rust proof paint, silver powder
Specifications and Dimensions two thousand
Place of Origin Hengshui, Hebei
manufacturer Jiaao Heating
Description :
Jiaao Vegetable Greenhouse Radiant Tube Heater Radiant Tube Radiator Hanging Method D133-2000-5






The heat dissipation method of the light pipe radiator is mainly convection. The appearance and interior are clean, the heat dissipation performance is good, the pressure bearing capacity is high, the structure is simple, and the installation and maintenance are extremely easy. However, users should be aware that the light pipe heat sink should not be placed in a humid environment before installation to avoid moisture and rust. Climate forecasts should also be taken seriously before installation.





Installation instructions for light pipe radiator: The radiator should be handled gently during transportation to avoid damage, and special attention should be paid to protecting the face mask from scratches. Radiators should be stored in a ventilated and dry warehouse, classified and arranged according to model and size, with a height not exceeding 1.7 meters, and stored with a 20cm cushion at the bottom.



Two side inlet and outlet radiators are divided into three types: same side connection, opposite side connection, and horizontal series connection. Before installing the radiator, install the outlet protection material, place the hanging parts according to the position of the fixing holes, then hang the radiator, adjust and tighten it, and keep the mask 15cm above the ground.






AfterSalesService :
Key words:- Vegetable greenhouse light pipe radiator
More Products