Guangdong Guangzhou FYT-1 Road and Bridge Waterproof Material Manufacturer Modified Asphalt Polyurethane Waterproof Coating
Category:
building materials/Waterproof and fireproof functional materials/Waterproof material
Model:
SH-114
Brand:
double rainbow
Retail Price
Negotiable
重量
kg
- Product Description
-
Description :
double rainbow FTY-1Bridge deck waterproof coating SH-114
Product Manual
1、 Product Introduction
This product is a water-based coating based on petroleum asphalt, emulsified and modified with various special polymer materials. It can effectively prevent water infiltration and has strong adhesion with concrete, masonry, mortar plastering, etc. It is integrated with the substrate to achieve good waterproof effect.
2、 Product Details
Product Name: Shuanghong FTY-1 Bridge Deck Waterproof Coating
Product Model SH-114
Product form: single component, brown black liquid slurry
Execute standard JC/T975-2005
3、 Product advantages
1. The waterproof layer has fast film formation, good waterproof effect, and low price.
2. The construction process is simple, and it can be manually painted or mechanically sprayed. Both construction methods can achieve the same effect.
3. The waterproof layer has strong adhesion and shear resistance.
4. High temperature resistance, corrosion resistance, aging resistance, and long service life.
4、 Scope of application
The product is specifically designed for waterproofing engineering of roads and bridges, and is also suitable for waterproofing of building roofs, underground, and tunnel projects.
5、 Construction technology
1. Base preparation
(1) The substrate must be sturdy, flat, clean, and free of dust, grease, wax, release agents, and other debris;
(2) All small pores and sand holes can be sealed by adding a little water to the sealing king and mixing it into a wet ball shape, then smoothing it out;
(3) Before applying the slurry, the substrate can be pre wetted, but there should be no accumulated water.
2. Grassroots treatment: The newly constructed concrete shall reach the design strength, and the surface temperature cracks and natural shrinkage cracks shall be basically completed. The surface of the base shall be free of floating dust, dirt, grease, accumulated water, etc., and shall be clean and dry.
3. The construction must have complete equipment and good performance.
4. Mix the paint evenly before application, and maintain intermittent mixing during construction to prevent sedimentation.
5. Before applying a large area of paint, use a small brush to apply 2-3 coats on the treated substrate, and then apply a large area of paint. Generally, it takes 3-6 hours (but not more than 24 hours) depending on the temperature. After the paint is dry, apply the second and third coats until the desired thickness is achieved.
VI Precautions
1. This product is suitable for use in an environment between 5 ℃ and 35 ℃. During the construction process, it must be protected from rain, hot sunlight, and frost.
2. If there is precipitation, it does not affect the quality. Stir well and it can be used normally.
3. Material storage: High temperature exposure is strictly prohibited. If the bucket lid is opened, it should be sealed immediately after use; Pay attention to antifreeze at 0 ℃.
7、 Reference dosage
When the dry film thickness of waterproof membrane is 1mm, the dosage is 1.9kg/m2, and the coating thickness of bridge deck is generally around 0.5mm-0.7mm, with a dosage of 1.0-1.5kg/㎡. The actual dosage depends on the specific substrate conditions.
8、 Shelf life:
Under normal storage and transportation conditions, the shelf life is one year.
9、 Packaging specifications:
1. Product specifications
50L single component slurry
2. Packaging materials
The outer packaging is in plastic drums.
10、 After sales instructions
1. Logistics distribution: Guangzhou Shuanghong Building Materials Co., Ltd. is located in Baiyun District, Guangzhou City, with a developed logistics network system nationwide. It can reach South China, East China, Central China, and Southwest China within three days, and other regions can be delivered within 5 days.
2. Return and exchange policy: For returns and exchanges caused by quality issues with the company's products, the company is responsible for replacing the defective products, but not for any other losses resulting from this.
3. Disclaimer: The use of this product is beyond the manufacturer's control. Our company is only responsible for replacing the defective product and does not assume any responsibility for losses caused by improper use.
AfterSalesService :
Key words:- Bridge deck waterproof coating
More Products