Tianjin Shuanghong EPDM waterproof coating black film-forming
Tianjin Shuanghong EPDM waterproof coating black film-forming

Tianjin Shuanghong EPDM waterproof coating black film-forming

Category:

building materials/Wall and floor coatings/Waterproof coating

Model:

SH-109

Brand:

double rainbow

brand:

double rainbow

model:

SH-109

type:

Polymer waterproof coating

Liquid type:

Water emulsion type

Properties of film-forming material:

inorganic

construction method:

brush

solid content:

seventy-five

Brush area per kilogram (twice):

one

Washability and abrasion resistance:

Wipe no less than 500 times

water resistance:

0.3mpa 120min

tensile strength:

one

Elongation at break:

three hundred

Surface drying time:

two

drying time:

eight

Scope of Application:

roof waterproofing

Place of Origin:

Guangzhou

Place of Origin:

Zhejiang

Place of Origin:

Fujian

Place of Origin:

Sichuan

Place of Origin:

Shandong

Place of Origin:

Jiangxi

Place of Origin:

Shanxi

Place of Origin:

Tianjin

Packing Specification:

20kg /50kg

manufacturer:

Guangzhou

Retail Price

1.00USD


重量

kg

  • Product Description
  • brand

    double rainbow

    model

    SH-109

    type

    Polymer waterproof coating

    Liquid type

    Water emulsion type

    Properties of film-forming material

    inorganic

    construction method

    brush

    solid content

    seventy-five

    Brush area per kilogram (twice)

    one

    Washability and abrasion resistance

    Wipe no less than 500 times

    water resistance

    0.3mpa 120min

    tensile strength

    one

    Elongation at break

    three hundred

    Surface drying time

    two

    drying time

    eight

    Scope of Application

    roof waterproofing

    Place of Origin

    Guangzhou

    Place of Origin

    Zhejiang

    Place of Origin

    Fujian

    Place of Origin

    Sichuan

    Place of Origin

    Shandong

    Place of Origin

    Jiangxi

    Place of Origin

    Shanxi

    Place of Origin

    Tianjin

    Packing Specification

    20kg /50kg

    manufacturer

    Guangzhou

    Description :

    1productintroduction

      Triethylene waterproof coating is a viscous liquid made from EPDM rubber as the main material, with various additives added and processed. After coating, a complete waterproof system can be formed, which can be applied to various structural surfaces and achieve waterproof and leak proof effects

    IIproductDetails

      Product Name: EPDM Waterproof Coating

      Product Model SH-108

      Product Form: Liquid

      Execute standard JC/T864-2008

    IIproductFeatures:

      High performance water-based EPDM rubber waterproof coating, organized by experts from the Ministry of Chemical Industry, has domestic standards and characteristics, and has unique waterproof production processes and technologies in China.

      EPDM rubber waterproof coating has obtained a scientific and technological achievement certificate.

      ◆ Solvent free, patented for "replacing gasoline with water", pollution-free, and environmentally friendly product.

      ◆ It has rubber elasticity, excellent extensibility, waterproofness, crack resistance, and film-forming properties.

      ◆ Resistant to aging, high temperature (above 100 ° C), low temperature (below -20 ° C), and excellent weather resistance.

      Cold work, easy construction operation.

      EPDM rubber waterproof coating can be used as a standalone waterproof coating or in combination with fiberglass cloth or non-woven fabric to form a "one cloth, four coatings" or "two cloths, six coatings" waterproof layer, or combined with other materials to achieve composite waterproofing according to the needs of waterproof engineering.

    3、 Material properties:

      serial number

      

      Test Project

      

      indicator

      

      Class I

      

      Class II

      

      one

      

      Tensile strength MPa ≥

      

      one

      

      one point five

      

      two

      

      Fracture elongation rate% ≥

      

      three hundred

      

      three hundred

      

      three

      

      Low temperature flexible winding? 10mm rod

      

      -10 ℃, no cracks

      

      -20 ℃, no cracks

      

      four

      

      Impermeability 0.3MPa, 0.5h

      

      impermeable

      

      five

      

      Solid content% ≥

      

      sixty-five

      

      six

      

      drying time

      

      Dry time h ≤

      

      four

      

      Practical time h ≤

      

      eight

      

    4、 Scope of use:

      Roofs: concrete, sloping roofs, gutters, canopies and various irregular roofs, underground buildings, concrete interior walls, exterior walls, floors, elevator pits, underground tunnels, sunken wells, pipelines, etc.

      Seams: expansion joints, construction joints, through wall joints, through wall pipes, water outlets.

    5、 Construction method

      1. Construction requirements

      1) Requirement for waterproof layer: The base layer must be clean and relatively smooth, so that the coating is uniform and consistent.

      2) This material is water-based and will swell when mixed with benzene, so organic solvents are prohibited.

      3) Adjust the concentration by adding water according to the base surface and weather conditions, which is convenient and simple.

      2. Apply primer

      When applying the primer, you can add some water to the material and mix it evenly with an electric mixer for easy application. The recommended coating amount is generally 0.2-0.3 kg/㎡. After coating, it needs to be dried for 4-6 hours before proceeding to the next process.

      3. Construction of Coating Waterproof Layer

      When constructing the waterproof layer, the coating generally does not need to be diluted with water. It should be stirred evenly with an electric mixer and directly applied with a rubber scraper or a roller, but the direction should be perpendicular to the direction of the secondary coating. According to the design requirements, determine the number of coats and scraping amount until the design thickness is reached. No matter how many coats are applied, the second coat can only be laid after the road has dried, and at least two coats should be applied on the surface.

      4. Scattered flour residue

      If the wall panel facade needs to be plastered, a small amount of clean coating should be sprinkled on its surface after a coating is applied but has not yet cured? 2-3mm sand particles are used to increase the bonding strength between the coating and cement mortar.

      5. Acceptance of Coating Waterproof Layer

      Before applying the protective layer, it is necessary to carefully inspect the construction quality of the coating waterproof layer. It is required to apply continuously, with uniform thickness, tight sealing, and no defects such as white exposure, bulging, peeling, cracking, or lifting are allowed. If necessary, water storage inspection can be carried out until there is no leakage, which is considered qualified.

      6. Construction of protective layer

      After the coating inspection is qualified, a cement mortar protective layer can be made or traditional methods can be used to lay tiles, mosaics, etc.

    6、 Attention:

      1. Material storage: High temperature exposure is strictly prohibited. If the bucket lid is opened, it should be sealed immediately after use. Pay attention to antifreeze at 0 ℃.

      2. If there is precipitation, it does not affect the quality. Stir well and it can be used normally.

      3. When the coating is too thick, a film is formed on the surface to prevent internal water evaporation, so each coating should be applied thinly and multiple times.

      4. When the temperature is above 23 ℃ and the coating thickness is ≤ 0.6mm, the surface drying time is ≤ 4 hours, and the actual drying time is ≤ 8 hours. As the temperature decreases, the drying time is extended.

    AfterSalesService :

    Key words:
    • EPDM waterproof coating