A shipment of double rainbow water-based rubber asphalt waterproof coating with strong adhesion
Category:
building materials/Wall and floor coatings/Waterproof coating
Model:
SH-134
Brand:
double rainbow
brand:
double rainbow
model:
SH-134
type:
Polymer waterproof coating
Liquid type:
Water emulsion type
Properties of film-forming material:
inorganic
construction method:
spray
solid content:
fifty-five
Brush area per kilogram (twice):
three
Washability and abrasion resistance:
strong
water resistance:
0.3mpa 120min
thinner:
lotion
tensile strength:
one
Elongation at break:
eight hundred
Surface drying time:
two
drying time:
five
Scope of Application:
Waterproofing of underground engineering and concrete roof engineering in industrial and civil buildings
Place of Origin:
Guangzhou
Place of Origin:
Zhejiang
Place of Origin:
Fujian
Place of Origin:
Sichuan
Place of Origin:
Shandong
Place of Origin:
Jiangxi
Place of Origin:
Shanxi
Place of Origin:
Tianjin
Packing Specification:
20kg /50kg
manufacturer:
Guangzhou
Retail Price
10.00USD
重量
kg
- Product Description
-
brand double rainbow
model SH-134
type Polymer waterproof coating
Liquid type Water emulsion type
Properties of film-forming material inorganic
construction method spray
solid content fifty-five
Brush area per kilogram (twice) three
Washability and abrasion resistance strong
water resistance 0.3mpa 120min
thinner lotion
tensile strength one
Elongation at break eight hundred
Surface drying time two
drying time five
Scope of Application Waterproofing of underground engineering and concrete roof engineering in industrial and civil buildings
Place of Origin Guangzhou
Place of Origin Zhejiang
Place of Origin Fujian
Place of Origin Sichuan
Place of Origin Shandong
Place of Origin Jiangxi
Place of Origin Shanxi
Place of Origin Tianjin
Packing Specification 20kg /50kg
manufacturer Guangzhou
Description :
double rainbow High viscosity anti water skid rubber asphalt waterproof coating
Product Manual
productintroduction
High viscosity anti water sliding rubber asphalt waterproof coating is a single component waterproof coating prepared using polymer modified asphalt technology. This product has the advantages of environmental friendliness and construction convenience of water-based coatings. At the same time, due to the addition of various special additives, it has the characteristics of strong bonding force and high elongation after curing. It is particularly suitable for the composite use of underground vertical walls and rolls, and is most suitable for mechanized spraying construction.

Product features
·Single group separate cover ready to use, easy to construct;
·Water based products are solvent-free, cold construction, safe and environmentally friendly;
·Facade construction is easy to apply thickness and dries quickly, and can also be carried out on damp substrates, saving construction time;
·The bonding strength between paint and base layer, paint and roll material is high, and the facade has strong anti slip risk ability;
·The product has a high elongation rate and can effectively resist cracking and deformation caused by grassroots stress.
Scope of Application
Suitable for waterproofing in underground engineering and concrete roof engineering of industrial and civil buildings, this product is used in combination with self-adhesive or hot-melt rolls to form a "coating+roll" composite waterproofing system.
construction technology
construction quantity :
The theoretical dosage for a 1.0mm thick coating is approximately 1.8 kg/m2.
Construction process flow:
Grassroots treatment → Coating+non-woven fabric node additional layer → Coating application → Second coating application → Third coating application (if necessary) → Inspection and acceptance → Laying of waterproofing membrane → Joint treatment → Inspection and acceptance → Finished product protection
Key construction processes:
·Grassroots treatment: The base should be solid, flat, free of dust and oil stains, and the unevenness and staggered joints should be polished or repaired;
·Construction of detailed additional layer: The internal and external corners, construction joints, and other additional layers are reinforced with a "coating+non-woven fabric" method (non-woven fabric should be used at 60-80g/m2). First, apply a layer of coating at the detailed nodes, and lay the non-woven fabric reinforcement additional layer before the coating surface dries. After compaction and adhesion, apply another layer of coating on the non-woven fabric surface.
·Large surface coating construction: Mechanized spraying is used (roller coating method can also be used), and the spraying should adopt the "cross cross" spraying method. The wet film thickness of each spray should not exceed 1.0mm, and the spraying should be uniform without any exposed substrate or accumulation.
·After the coating has dried, the second coat of coating can be sprayed. After the second coat of coating has dried, the third coat can be sprayed (the amount of the third coat can be controlled according to the design thickness and on-site measured thickness). After the coating has dried and passed the acceptance inspection, the roll can be laid.
Storage and transportation
·The product should be stored in a well ventilated and dry environment to prevent direct sunlight exposure. The storage temperature should be between 5 ℃ and 40 ℃.
·Under normal transportation and storage conditions, the shelf life is 6 months.
Precautions·
·It is strictly prohibited to dilute the paint with water.
·The construction temperature should be between 5 ℃ and 35 ℃. Construction should not be carried out when the temperature is below 0 ℃ or on rainy days (including expected rain within 6 hours after completion of construction).
·The interval between two coats of paint should not exceed 24 hours.








AfterSalesService :
Key words:- Water based rubber asphalt waterproof coating
More Products