What are the requirements for the civil foundation of buried integrated sewage pump stations
Due to the fact that the civil engineering part of the equipment is completed by the customer themselves, it must be fully completed before shipment. So many customers are a bit confused about the foundation of this buried integrated prefabricated pump station, not knowing where to start and how to do it specifically. First of all, our manufacturer can tell everyone: don't worry about these. The basic part can be completely based on the drawings, and some sewage pump station designs are very mature, with complete drawings already available when quoting; Some even require manufacturers to design, but they will confirm all the drawings and hand them over to customers before production, so there is no need to worry about basic issues. On site, only the drawings need to be handed over to the specialized civil engineering department. If there are still any uncertainties, you can directly inquire with the manufacturer to ensure compliance with the requirements.