Anqing SB-A-1T weighing sensor 1000kg paint mixing sensor
Category:
electron/Sensors, sensitive components/force sensor
Model:
SB-A-1T
Brand:
ALLEGRO
Retail Price
180.00USD
重量
kg
- Product Description
-
Description :
Harbin SQBL-2.5T weighing sensor 2500kg hopper weighing sensor Anqing SB-A-1T weighing sensor 1000kg coating mixing sensordetailed description:




Anqing SB-A-1T weighing sensor 1000kg paint mixing sensor:
1、 Product Overview:
Double shear measurement method, capable of withstanding tension and pressure. Good output symmetry, compact structure, easy installation, high precision, and good stability.
Can be used to manufacture scales such as hook scales, hopper scales, and electromechanical combination scales.
2、 Product features and advantages:
Applicable platform: Suitable for measuring equipment such as car scales, ground scales, monorail scales, hopper scales, etc
Rated load: 0.3t-25t
Comprehensive error: ± 0.02% F.S
Applicable platform: Used in hook scales, hopper scales, and electromechanical combination scales;
Alloy steel material, nickel plated on the surface, fully sealed welding, oil resistant, waterproof, and resistant to general corrosive gases and media, suitable for various environments.
high precision
Alloy steel material
Easy installation and reliable performance
SQB-A-1t,SQB-A-1.5t,SQB-A-2t,SQB-A-2.5t,SQB-A-3t,SQB-A-5t,SQB-A-7.5t,SQB-A-10t,
SQB-SS-0.25t,SQB-SS-0.5t,SQB-SS-0.75t,SQB-SS-1t,SQB-SS-1.5t,SQB-SS-2t,SQB-SS-2.5t,SQB-SS-3t,SQB-SS-5t,SQB-SS-7.5t,SQB-SS-10t。
LS-50kg,LS-100kg,LS-150kg,LS-200kg,LS-250kg,LS-500kg,LS-1.5t。 SBB-0.5t,SBB-1t,SBB-2t,SBB-A-0.5t,SBB-A-1t,SBB-A-2t,SQBL-A-1t,SQBL-A-1.5t,SQBL-A-2t,SQBL-A-2.5t,SQBL-SS-1t,SQBL-SS-1.5t,SQBL-SS-2t,SQBL-SS-2.5t
Key maintenance points for weighing sensors
1. Some "baffles" should be set up around the weighing sensor as much as possible, and even thin metal plates should be used to cover the sensor. This can prevent impurities from contaminating the sensor and certain movable parts, which often cause discomfort in the movement of the movable parts and affect the weighing accuracy. The presence or absence of motion discomfort in the system can be determined using the following methods. Add or subtract approximately one thousandth of the rated load on the weighing platform to check if the weighing display reflects. If it does, it indicates that the movable part is not "contaminated".
2. All wires leading to or from the display circuit should use shielded cables. The connection and grounding points of shielded wires should be reasonable. If it is not grounded through the mechanical frame, it will be grounded externally, but if the shielding wires are connected to each other and not grounded, it will be floating. Note: There are 3 sensors that are fully connected in parallel. The sensors themselves are 4-wire, but they have been replaced with a 6-wire connection in the junction box. The sensor output signal readout circuit should not be placed in the same box as devices that can generate strong interference, such as controllable silicon and contactors, or devices that can generate considerable heat. If this cannot be guaranteed, it is necessary to consider setting up barriers to isolate them and installing fans inside the box. Electronic circuits used to measure sensor output signals should be equipped with independent power transformers as much as possible, rather than sharing the same main power supply with equipment such as contactors.
3. Sensors should use hinged copper wires (with a cross-sectional area of approximately 50mm2) to form an electrical bypass to protect them from the hazards caused by welding currents or lightning strikes. During the use of sensors, it is necessary to avoid strong thermal radiation, especially on one side.
4. In terms of electrical connections (such as signal cables for sensors, they should not be arranged in parallel with high-voltage power lines or control lines (for example, do not place sensor signal lines, high-voltage power lines, and control lines in the same pipeline). If they must be placed in parallel, the distance between them should be kept at least 50cm, and the signal lines should be covered with metal tubes.
AfterSalesService :
Key words:- SB-A-1T