Beijing asphalt cold patching material winter low-temperature construction factory source same city delivery
Beijing asphalt cold patching material winter low-temperature construction factory source same city delivery

Beijing asphalt cold patching material winter low-temperature construction factory source same city delivery

Category:

building materials/Waterproof and fireproof functional materials/Cold base oil

Model:

MR-100

Brand:

Haiyan Xingye

model:

MR-100

impermeability:

tall

solid content:

twenty

bonding performance:

good

viscosity:

tall

shelf life:

three hundred and sixty

Applicable Temperature:

-20 to 40

purpose:

Road pothole repair

Packing Specification:

25kg

manufacturer:

Beijing Shunyi Haiyan Xingye

Retail Price

1,200.00USD


重量

kg

  • Product Description
  • model

    MR-100

    impermeability

    tall

    solid content

    twenty

    bonding performance

    good

    viscosity

    tall

    shelf life

    three hundred and sixty

    Applicable Temperature

    -20 to 40

    purpose

    Road pothole repair

    Packing Specification

    25kg

    manufacturer

    Beijing Shunyi Haiyan Xingye

    Description :

      Beijing asphalt cold patching material (winter low-temperature construction) factory source same city delivery

      Winter temperature cold replenishment construction steps:

      Cleaning the road surface:

      Generally, the gravel and waste residue in and around the pit to be repaired should be cleaned up, and there should be no mud, ice or other debris in the pit. The repair of highways and road excavation projects should have neat edges on the repaired trenches, and the removal of waste residue should be done until a solid and sturdy surface is visible.

      Fill in cold asphalt:

      Fill enough cold fill material into the pit, with the filling material about 1.5cm above the ground. After filling, the pit should be higher than the surrounding road surface and curved. When the depth of road potholes is more than 5cm, the filling work should be done every 3-5cm as a layer, layer by layer filling and compacting layer by layer.

      Compacted road surface:

      After laying evenly, use manual tamping, vibrating flat tamping, flat bottomed aluminum pressing plates, truck tires, rollers or pavers to compact.

      Acceptance and opening to traffic:

      The repaired surface of the pit should be smooth, flat, and free of wheel marks. The edges and corners of the pit should be well compacted without looseness, and the compaction degree should usually reach 93% or more.

      5、 Cold replenishment material construction usage:

      1. Compaction density: 1 cubic meter ≈ 2.36 tons

      2. Approximately repairable area per ton of material:

      

       Repair depth--------Approximately repairable area

      3cm-------------17m2

      5cm-------------10m2

      8cm-------------6.25m2

      10cm------------5m2

    AfterSalesService :

    Key words:
    • Cold replenishment material in Xicheng District