Customized static level, electric static level
Category:
Instrumentation/Special instruments and meters/Construction engineering instruments
Model:
Brand:
Hengrui
purpose:
Settlement deformation monitoring
Retail Price
99.00USD
重量
kg
- Product Description
-
purpose Settlement deformation monitoring
Description :
The layered settlement meter is composed of multiple single point settlement units connected in series with PVC pipes. Suitable for measuring displacement between multiple layers of soil and relative fixed points (bedrock), it can be used for long-term monitoring and automated measurement.

The static level is generally installed on the measuring pier or the wall contour line of the measured object at the same height. Usually, the data is automatically collected and stored in the field acquisition system through the stand-alone acquisition software built in the field acquisition box. Then, it is connected to the Internet through wired or wireless communication and then transmitted to the background network software to achieve automatic observation.

Installation and layout of layered settlement meter
① Before installation, connect multiple single point settlement meters in series based on the number of layers.
② Adopt drilling and drilling methods for burial, with a diameter of Φ 108 or Φ 127.
③ Drill vertically, the depth of the hole should be consistent with the total length of the settlement meter, and the hole opening should be flat.
④ Before installation, grout at the bottom of the hole to secure the bottom anchor plate 1.
⑤ During installation, the bottom anchor plate 1 is located below and the flange settlement plate 2 is located above.
⑥ At the same time, use a drawstring to protect the components from falling off on their own.
⑦ Use rod 3 to press the bottom anchor plate 1 of the settlement meter to the design depth.
⑧ Fill with fine sand or soil until the flange plate 2 is connected to the layer.
⑨ Grout at the connection flange plate 2 of the layer.

Main purpose of railway settlement monitoring
1. Obtain observation data on the load and natural settlement of the newly built 200-350km/h ballastless track subgrade.
2. By monitoring, obtain the true situation and deformation trend of settlement and deformation of different structures in the project.
3. By monitoring and understanding the dynamic changes in settlement during the compaction process of the roadbed, timely and reliable information can be provided for the later settlement, in order to evaluate the safety of the ballastless track foundation under load and natural settlement.
4. Provide forecasts for potential safety hazards in engineering, in order to take effective measures and prevent accidents from occurring.
AfterSalesService :
Key words:- Static level
More Products