Integrated rainwater pump station Mudanjiang GPRS remote integrated rainwater pump station
Integrated rainwater pump station Mudanjiang GPRS remote integrated rainwater pump station

Integrated rainwater pump station Mudanjiang GPRS remote integrated rainwater pump station

Category:

Environmental Protection/Sewage treatment equipment/Sewage lift

Model:

JZPPS-3.5-6.5-7.5/2

Brand:

Kanazawa

model:

JZPPS-3.5-6.5-7.5/2

Discharge caliber:

four hundred

Inhalation caliber:

two hundred

head:

twenty

Overall dimensions:

350*650

Processing & Customization:

yes

Specifications:

3.5*6.5m

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

18,000.00USD


重量

kg

  • Product Description
  • model

    JZPPS-3.5-6.5-7.5/2

    Discharge caliber

    four hundred

    Inhalation caliber

    two hundred

    head

    twenty

    Overall dimensions

    350*650

    Processing & Customization

    yes

    Specifications

    3.5*6.5m

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

      Integrated Rainwater Pump Station Process Characteristics and Advantages Scope of Application: This construction method is suitable for the construction of urban rainwater and sewage discharge or sewage lifting pump stations. Especially suitable for the construction of pumping stations in narrow areas of public buildings such as residential buildings, office buildings, hotels, restaurants, schools, hospitals, etc. Process principle: The integrated rainwater pump station cylinder is made of high-strength fiberglass reinforced plastic prefabricated cylinder, and various equipment components are integrated into this movable prefabricated cylinder. The prefabricated cylinder is vertically buried underground. Adopting an intelligent fully automatic remote control system, the water discharge is efficiently and automatically adjusted according to the storage capacity. Excavation of pump pit: It is necessary to excavate according to the design drawings and develop an excavation plan. During excavation, close attention should be paid to the safety of the foundation pit. The bottom of the pump pit must be dry and free of water. If there is any, appropriate precipitation measures must be taken. Adopt appropriate foundation pit maintenance methods to avoid pump pit collapse. The bottom of the pit should be excavated flat. If necessary, a layer of stone free gravel should be laid and compacted with a compactor to achieve a compaction degree of 90% according to the compaction test results. After the excavation of the pump pit is completed, it is necessary to confirm that the on-site conditions for the inlet and outlet water pipes, connecting pipes, and cables of the pump station are met before installing the pump station.

    AfterSalesService :

    Key words:
    • Integrated rainwater pump station