Integrated rainwater pump station manufacturer for highway rainwater lifting pump station
Integrated rainwater pump station manufacturer for highway rainwater lifting pump station

Integrated rainwater pump station manufacturer for highway rainwater lifting pump station

Category:

Environmental Protection/Sewage treatment equipment/Sewage lift

Model:

JZPPS-4.2-6.8-7.5/2

Brand:

Yancheng Jinze

model:

JZPPS-4.2-6.8-7.5/2

Discharge caliber:

six hundred

Inhalation caliber:

five hundred

head:

forty

Overall dimensions:

420*680

Processing & Customization:

yes

Specifications:

4.2*6.8m

Is it a cross-border source of goods:

yes

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

34,500.00USD


重量

kg

  • Product Description
  • model

    JZPPS-4.2-6.8-7.5/2

    Discharge caliber

    six hundred

    Inhalation caliber

    five hundred

    head

    forty

    Overall dimensions

    420*680

    Processing & Customization

    yes

    Specifications

    4.2*6.8m

    Is it a cross-border source of goods

    yes

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

    Integrated rainwater pump station The integrated rainwater pump station is an ideal substitute for traditional sewage pump stations. Usually, traditional pump stations have very strict requirements for planning and construction, requiring every detail to be planned, and the installation of pump stations also requires a lot of manpower, material resources, and time. It is necessary to arrange the construction site and pour concrete, which requires a lot of time to wait for the concrete to harden. Then it is necessary to determine the water inlet point, drill holes, and install the necessary components. It will take at least 2 months to complete these processes. In the construction process of the pump station, it is also necessary to cooperate with contractors of various processes. These unnecessary processes will consume a lot of energy from planners, and the engineering quality of each contractor will also vary. With JZWS, you can complete all the processes including excavation, backfilling, compaction, connection, leak testing, control system installation, trial operation, final debugging, and document recording within one or two weeks. This will save 7 weeks of pump station installation time, with a time-saving rate of 80%. More importantly, it can solve a series of problems such as leakage and corrosion in traditional pump stations, pump failures, sediment deposition, environmental pollution, frequent maintenance, and high costs. The operating principle of integrated rainwater pump station: The liquid level information of the pump station is fed back to the control system by pressure sensors or floating balls, and then the pump switch is adjusted by the operating parameters set by the control system. When the liquid level reaches the system set opening water pump level, the control system will control the water pump to start, so that sewage is pumped from the pump station to the outlet of the municipal sewage pipeline; When the sewage pumping is below the set liquid level of the system, the system will control the water pump to stop. This loop repeats to ensure the smooth operation of JZWS.

    AfterSalesService :

    Key words:
    • Integrated rainwater pump station