Integrated rainwater pump station for collecting, improving and discharging rainwater along municipal roads
Integrated rainwater pump station for collecting, improving and discharging rainwater along municipal roads

Integrated rainwater pump station for collecting, improving and discharging rainwater along municipal roads

Category:

Environmental Protection/Sewage treatment equipment/Sewage lift

Model:

JZPPS-4.2-8.5-7.5/2

Brand:

Yancheng Jinze

model:

JZPPS-4.2-8.5-7.5/2

Discharge caliber:

three hundred and fifty

Inhalation caliber:

five hundred

head:

fifty

Overall dimensions:

420*850

Processing & Customization:

yes

Specifications:

4.2*8.5m

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

37,800.00USD


重量

kg

  • Product Description
  • model

    JZPPS-4.2-8.5-7.5/2

    Discharge caliber

    three hundred and fifty

    Inhalation caliber

    five hundred

    head

    fifty

    Overall dimensions

    420*850

    Processing & Customization

    yes

    Specifications

    4.2*8.5m

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

    Integrated rainwater pump stationIt is an ideal substitute for traditional pumping stations. Usually, traditional pump stations have very strict requirements for planning and construction, requiring every detail to be planned, and the installation of pump stations also requires a lot of manpower, material resources, and time. It is necessary to arrange the construction site and pour concrete, which requires a lot of time to wait for the concrete to harden. Then it is necessary to determine the water inlet point, drill holes, and install the necessary components. It will take at least 2 months to complete these processes. In the construction process of the pump station, it is also necessary to cooperate with contractors of various processes. These unnecessary processes will consume a lot of energy from planners, and the engineering quality of each contractor will also vary. After having a prefabricated pump station, you can complete all the processes including excavation, backfilling, compaction, connection, leak testing, control system installation, trial operation, final debugging, and document recording within one or two weeks. This will save 7 weeks of pump station installation time, with a time-saving rate of 80%. More importantly, it can solve a series of problems such as leakage and corrosion in traditional pump stations, pump failures, sediment deposition, environmental pollution, frequent maintenance, and high costs.

    AfterSalesService :

    Key words:
    • Integrated rainwater pump station