Integrated rainwater pump station with strong sewage discharge capacity and short construction period
Integrated rainwater pump station with strong sewage discharge capacity and short construction period

Integrated rainwater pump station with strong sewage discharge capacity and short construction period

Category:

Environmental Protection/Sewage treatment equipment/Sewage lift

Model:

JZPPS-2.8-7.9-7.5/2

Brand:

Yancheng Jinze

model:

JZPPS-2.8-7.9-7.5/2

Discharge caliber:

three hundred and fifty

Inhalation caliber:

five hundred

head:

thirty-five

Overall dimensions:

280*790

Processing & Customization:

yes

Specifications:

2.8*7.9m

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

26,000.00USD


重量

kg

  • Product Description
  • model

    JZPPS-2.8-7.9-7.5/2

    Discharge caliber

    three hundred and fifty

    Inhalation caliber

    five hundred

    head

    thirty-five

    Overall dimensions

    280*790

    Processing & Customization

    yes

    Specifications

    2.8*7.9m

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

    Integrated rainwater pump station The process characteristics and advantages of this method are applicable to the construction of urban rainwater and sewage discharge or sewage lifting pump stations. Especially suitable for the construction of pumping stations in narrow areas of public buildings such as residential buildings, office buildings, hotels, restaurants, schools, hospitals, etc.

      The process principle is that the integrated rainwater pump station cylinder is made of high-strength fiberglass reinforced plastic prefabricated cylinder, and various equipment components are integrated into this movable prefabricated cylinder. The prefabricated cylinder is vertically buried underground. Adopting an intelligent fully automatic remote control system, the water discharge is efficiently and automatically adjusted according to the storage capacity.

      The excavation of the pump pit must be carried out according to the design drawings, and an excavation plan must be formulated. During excavation, close attention should be paid to the safety of the foundation pit. The bottom of the pump pit must be dry and free of water. If there is any, appropriate precipitation measures must be taken. Adopt appropriate foundation pit maintenance methods to avoid pump pit collapse. The bottom of the pit should be excavated flat. If necessary, a layer of stone free gravel should be laid and compacted with a compactor to achieve a compaction degree of 90% according to the compaction test results. After the excavation of the pump pit is completed, it is necessary to confirm that the on-site conditions for the inlet and outlet water pipes, connecting pipes, and cables of the pump station are met before installing the pump station.

    AfterSalesService :

    Key words:
    • Integrated rainwater pump station