Integrated buried box pump, supplied by Jiangsu Suzhou buried box pump integrated manufacturer
Integrated buried box pump, supplied by Jiangsu Suzhou buried box pump integrated manufacturer

Integrated buried box pump, supplied by Jiangsu Suzhou buried box pump integrated manufacturer

Category:

Security/Firefighting equipment/Fire water supply equipment

Model:

JZ-95/30-58/30-XBF

Brand:

Kanazawa

brand:

Kanazawa

model:

JZ-95/30-58/30-XBF

type:

Integrated buried box pump

material:

Prefabricated composite panel

Specifications:

12*3*3

Scope of Application:

Fire water supply

Processing & Customization:

yes

Is it imported:

No

Retail Price

15,000.00USD


重量

kg

  • Product Description
  • brand

    Kanazawa

    model

    JZ-95/30-58/30-XBF

    type

    Integrated buried box pump

    material

    Prefabricated composite panel

    Specifications

    12*3*3

    Scope of Application

    Fire water supply

    Processing & Customization

    yes

    Is it imported

    No

    Description :

      Integrated buried box pump The integration of buried box pumps should be carried out in a well ventilated, dust-free, and non humid environment with a humidity range of -10 ℃ to 40 ℃. Rainproof and lightning protection facilities should be installed outdoors. For the convenience of equipment installation and maintenance, a 70cm space should be left around the equipment, a 1.5m space should be reserved at the manhole, and drainage ditches should be set up on the surrounding ground. After selecting the site, the foundation should be prepared and the tank support seat should be poured with concrete or built with bricks and stones. After the base is completely cured, lift the tank and stabilize it, then install the accessories and turn on the power. Before testing the integrated buried box pump, the water supply valve should be closed first, and the condition of each sealing valve should be checked. There should be no leakage. After driving, attention should be paid to the direction of the pump. When the pressure gauge pointer reaches the upper limit, the pump automatically stops. Open the water supply valve to supply water normally. If timed water supply is required, turn the selection switch to the manual position.

      Integrated buried box pump The integrated equipment pump unit of buried box pump should be regularly inspected, maintained and lubricated. If leakage is found in centrifugal pumps and check valves, the flange screws should be tightened or asbestos roots replaced in a timely manner. The pump foot bolts should be checked to prevent damage to the machine. The electrical automatic control system should be waterproof and dustproof, and the insulation of the circuit should be checked regularly to ensure that the connecting bolts are loose and the wires are intact. Wrap the pressure gauge with transparent material to prevent damage. If the paint peeling off is found on the tank, it should be painted and maintained in a timely manner to extend its service life

    AfterSalesService :

    Key words:
    • Integrated buried box pump