Hunan Zhuzhou anti floating pump box buried integrated pump station
Hunan Zhuzhou anti floating pump box buried integrated pump station

Hunan Zhuzhou anti floating pump box buried integrated pump station

Category:

Security/Firefighting equipment/Fire water supply equipment

Model:

JZ-003

Brand:

Kanazawa

brand:

Kanazawa

model:

JZ-003

type:

Integrated pump station with buried box pump

material:

SUS304-2B

Specifications:

packaging

Scope of Application:

Fire Protection Engineering

Processing & Customization:

yes

Is it imported:

No

Place of Origin:

Jiangsu

Retail Price

16,800.00USD


重量

kg

  • Product Description
  • brand

    Kanazawa

    model

    JZ-003

    type

    Integrated pump station with buried box pump

    material

    SUS304-2B

    Specifications

    packaging

    Scope of Application

    Fire Protection Engineering

    Processing & Customization

    yes

    Is it imported

    No

    Place of Origin

    Jiangsu

    Description :

      1. The buried stainless steel water tank company uses hot-dip galvanized steel plates and stainless steel plates to be pressed and composite formed by equipment, so as to achieve the strength of the steel plate material, the corrosion resistance of stainless steel, and other requirements.

      2. After compression molding, punching molding is carried out through equipment to meet the assembly requirements of standard modules.Hunan Zhuzhou anti floating pump box buried integrated pump station

      3. The on-site assembly of the high-level fire water tank and the use of national standard hot-dip treatment for the foundation channel steel are combined with a spacing of 1 meter between each beam, and so on.

      4. Assemble according to the atlas and technical requirements, and assemble with hot-dip galvanized screws and environmental water resistant and anti-aging adhesive strips. After the water tank is assembled and formed, install the tie bars and top columns. Hot dipped zinc is used for tensioning, without 1

      Installation of meters vertically and horizontally crossing. The top pillar is sealed with 4 hot-dip galvanized pipes evenly distributed per square meter.

      5. Install the pump room according to the pump station, use screws on the outside of the pump room, and reinforce the inside of the pump with No. 12 I-beam to achieve good pressure bearing effect. After installation, inspect and accept to ensure that all fasteners are tightened without omission.

      6. Clean up all remaining accessories and garbage in the water tank.

      7. Cover the soil and prepare the site properly. Before covering the integrated buried box pump, the water in the pit must be pumped out to ensure that there is no accumulated water in the pit;

      The soil used for covering must be fine soil, free of debris and stones;

      When covering the soil, the excavator must be 2 meters away from the water tank and cannot walk on top of the water tank;

      When covering the buried water tank with soil, it is necessary to start adding soil from all sides, adding soil in a circle of 50cm upwards until it is parallel to the ground.

    AfterSalesService :

    Key words:
    • Anti floating pump box buried integrated pump station