Guiyang anti floating combined buried water tank
Category:
Security/Firefighting equipment/Fire water supply equipment
Model:
JZ-003
Brand:
Kanazawa
brand:
Kanazawa
model:
JZ-003
type:
Integrated pump station with buried box pump
material:
SUS304-2B
Specifications:
packaging
Scope of Application:
Fire Protection Engineering
Processing & Customization:
yes
Is it imported:
No
Place of Origin:
Jiangsu
Retail Price
16,800.00USD
重量
kg
- Product Description
-
brand Kanazawa
model JZ-003
type Integrated pump station with buried box pump
material SUS304-2B
Specifications packaging
Scope of Application Fire Protection Engineering
Processing & Customization yes
Is it imported No
Place of Origin Jiangsu
Description :

1Guiyang anti floating combined buried water tank Space saving: The water pump and pump chamber are placed in the water tank and fixed on the module of the integrated pump station. Normally, it only occupies a water tank capacity of 0.5-1.5m.
2. Easy to move and disassemble, long service life: Due to the use of prefabricated stainless steel water tanks, the previous welding method has been changed, and screw assembly is adopted, which is highly applicable and easy to install.
3. Easy emptying: Due to the use of a new type of submersible fire pump, it can be directly submerged in water without the need for air discharge. As long as the water tank level is within the specified level, it can directly enter the fire water supply state.
4. Frost free cracking: The fire pump is hidden deep in the water tank and will not be burned out due to freezing in winter.
5. Low noise: Equipped with a water immersed motor and water pump, it greatly reduces the operating noise.
6. Usability: Water immersed motors will not burn out the motor or corrode the motor bearings due to rain or environmental temperature.
7. Convenient: with interfaces to support remote transmission, automatic cleaning, sterilization, and disinfection

1、 The buried water tank module is made of hot-dip galvanized steel plate and stainless steel plate, which are pressed and composite formed by equipment to achieve a tight fit, thus meeting the requirements of steel plate material strength and stainless steel corrosion resistance.
2、 After compression molding, punching molding is carried out through equipment to meet the assembly requirements of standard modules.
3、 On site assembly, the foundation channel steel is treated with national standard hot-dip treatment, and each beam is combined with a spacing of 1 meter, and so on.
4、 Assemble according to the requirements of the atlas, using hot-dip galvanized screws and water-resistant adhesive strips. After the water tank is assembled and formed, install the tie bars and top columns. Hot dipped zinc is used for tensioning, with a horizontal and vertical cross installation every 1 meter
Install. The top pillar is sealed with 4 hot-dip galvanized pipes evenly distributed per square meter.
5、 According to the installation of the pump room and the screws on the outside of the pump room, the pump room is stabilized with I-beams. After installation, it is checked and accepted to ensure that there are no omissions in the fastening.
6、 Clean the remaining accessories in the water tank.
7、 Cover the soil and prepare the site properly.


AfterSalesService :
Key words:- Buried water tank
More Products