Zhuhai Rapid Stacking Door Rapid Rolling Door Radar or Infrared Induction
Category:
building materials/door/Rolling shutter door
Model:
YXS-KSM01
Brand:
Yongxingsheng
Retail Price
180.00USD
重量
kg
- Product Description
-
Description :
The company has advanced production equipment and strong technical development capabilities. While consolidating the quality of existing products, it continuously launches new products and has multiple varieties with multiple appearance and practical patents. Due to the excellent quality and thoughtful service of the products designed, produced, and installed by our company, they have been widely used in markets, shopping malls, villas, residential areas, and factories, garages, warehouses, and other facilities of enterprises and institutions across the country. Haofa Door Industry always adheres to the business policy of "competing with quality and winning with service" and a good service system: pre-sales - free on-site design by personnel; By accumulating a large number of successful cases, the company is guided by customer needs and utilizes advanced international logistics planning and management concepts to provide customers with a complete set of logistics solutions to help improve efficiency and reduce costs.
Strap style quick stacking doorInstallation of tracks
1. Determine the installation position of the guide rail on both sides of the fast door, use a hammer line to set out the guide rail reference line, and set out the cross line of the fixing bolt of the guide rail connector. The guide rail should exceed the ceiling by no less than 75cm.
2. Use an impact drill to drill expansion bolt holes for fixing connectors on the wall column, with a spacing of no more than 600mm between connectors and a distance of 100mm from the guide rail mouth at both ends. First, fix several connectors up and down, attach the guide rail, correct its verticality, and spot weld it. After fixing the guide rail, recheck the verticality of the guide rail, which should not exceed 5mm per meter and 20mm for the entire length. The composite curtain surface should be embedded into the guide rail depth (see GBl4102-2005).
3. Install the remaining connecting components, and use spot welding between the connecting components and the guide rail. Each connecting component should have at least 5 spot welding points with a guide rail, and the width of the spot welding should not be less than 5mm. The welding point should never be penetrated. When using stainless steel guide rails, stainless steel welding rods are used.



AfterSalesService :
Key words:- Quick stacking door
More Products