Integrated sewage pump station, buried sewage lifting pump station, integrated sewage lifting pump station manufacturer
Integrated sewage pump station, buried sewage lifting pump station, integrated sewage lifting pump station manufacturer

Integrated sewage pump station, buried sewage lifting pump station, integrated sewage lifting pump station manufacturer

Category:

Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment

Model:

JZPPS-2-8-20/3

Brand:

Yancheng Jinze Water Supply Equipment Co., Ltd

model:

JZPPS-2-8-20/3

pump power:

twenty

Flow meter specifications:

one hundred and fifty

Diameter of water outlet pipe:

four hundred

Inlet pipe diameter:

seven hundred

Processing & Customization:

yes

voltage:

three hundred and eighty

power:

twenty thousand

water temperature:

0-60

Device Name:

Integrated sewage pumping station

Overall dimensions:

200X800

Wastewater treatment capacity:

one hundred and twenty

Specifications:

2X8m

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

26,000.00USD


重量

kg

  • Product Description
  • model

    JZPPS-2-8-20/3

    pump power

    twenty

    Flow meter specifications

    one hundred and fifty

    Diameter of water outlet pipe

    four hundred

    Inlet pipe diameter

    seven hundred

    Processing & Customization

    yes

    voltage

    three hundred and eighty

    power

    twenty thousand

    water temperature

    0-60

    Device Name

    Integrated sewage pumping station

    Overall dimensions

    200X800

    Wastewater treatment capacity

    one hundred and twenty

    Specifications

    2X8m

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

    Integrated sewage pumping stationIt is an integrated buried prefabricated pump station that is fully prefabricated in the factory according to specific customer requirements and installed before leaving the factory. The wellbore of this integrated product is produced using advanced materials, including water pumps, grilles, pipelines, valves, instruments, control equipment, and maintenance facilities, to ensure the cost-effectiveness and operational reliability of the system. Whether in the fields of urban waterlogging prevention and control or rainwater and sewage collection and treatment, Jinze Water Supply has numerous successful operational cases. Application areas of sewage lift pump stations: They can perfectly replace traditional concrete pump stations in many fields and have been widely used in: 1. Municipal water supply and drainage; 2. Emergency drainage for rain and flood; 3. Improvement of urban sewage and rainwater; 4. Drainage of underpass; 5. Railway and highway drainage; 6. Raw water intake; 7. Building water supply and drainage;

      Advantages of integrated sewage lifting pump station: Integrated prefabricated pump station is an ideal substitute for traditional sewage pump station. Usually, traditional pump stations have very strict requirements for planning and construction, requiring every detail to be planned, and the installation of pump stations also requires a lot of manpower, material resources, and time. It is necessary to arrange the construction site and pour concrete, which requires a lot of time to wait for the concrete to harden. Then it is necessary to determine the water inlet point, drill holes, and install the necessary components. It will take at least 2 months to complete these processes. In the construction process of the pump station, it is also necessary to cooperate with contractors of various processes. These unnecessary processes will consume a lot of energy from planners, and the engineering quality of each contractor will also vary. With JZWS, you can complete all the processes including excavation, backfilling, compaction, connection, leak testing, control system installation, trial operation, final debugging, and document recording within one or two weeks. This will save 7 weeks of pump station installation time, with a time-saving rate of 80%. More importantly, it can solve a series of problems such as leakage and corrosion in traditional pump stations, pump failures, sediment deposition, environmental pollution, frequent maintenance, and high costs.

      The operating principle of integrated sewage lifting pump station: The liquid level information of the pump station is fed back to the control system by pressure sensors or floating balls, and then the water pump switch is adjusted by the operating parameters set by the control system. When the liquid level reaches the system set opening water pump level, the control system will control the water pump to start, so that sewage is pumped from the pump station to the outlet of the municipal sewage pipeline; When the sewage pumping is below the set liquid level of the system, the system will control the water pump to stop. This cycle repeats to ensure the smooth operation of the integrated prefabricated pump station.

    AfterSalesService :

    Key words:
    • Integrated sewage pumping station