Prefabricated pump station replaces traditional concrete caisson pump station
Prefabricated pump station replaces traditional concrete caisson pump station

Prefabricated pump station replaces traditional concrete caisson pump station

Category:

Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment

Model:

JZPPS-3-9.5-22/3

Brand:

Yancheng Jinze Water Supply Equipment Co., Ltd

model:

JZPPS-3-9.5-22/3

pump power:

twenty-two

Flow meter specifications:

one hundred and eighty

Diameter of water outlet pipe:

six hundred

Inlet pipe diameter:

eight hundred

Processing & Customization:

yes

voltage:

three hundred and eighty

power:

twenty-two thousand

water temperature:

0-60

Device Name:

Prefabricated pump station

Overall dimensions:

300X950

Wastewater treatment capacity:

one hundred and fifty

Specifications:

3*9.5m

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

30,000.00USD


重量

kg

  • Product Description
  • model

    JZPPS-3-9.5-22/3

    pump power

    twenty-two

    Flow meter specifications

    one hundred and eighty

    Diameter of water outlet pipe

    six hundred

    Inlet pipe diameter

    eight hundred

    Processing & Customization

    yes

    voltage

    three hundred and eighty

    power

    twenty-two thousand

    water temperature

    0-60

    Device Name

    Prefabricated pump station

    Overall dimensions

    300X950

    Wastewater treatment capacity

    one hundred and fifty

    Specifications

    3*9.5m

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

    Prefabricated pump stationThe application of integrated prefabricated pump stations in China has achieved significant results in terms of structural characteristics and precautions before installation. For example, municipal industrial basement drainage, subway drainage, living areas, factories, and so on will all use integrated prefabricated pump stations. With the increasing maturity of technology, its role will become more and more significant.

      The non clogging self-cleaning function of the integrated prefabricated pump station can be customized according to the usage environment and customer needs, and efficiently matched with other equipment in the pump station to ensure that the pump station system can operate efficiently without failure. The internal structure includes spiral centrifugal water pump, pre swirl pot, pipeline, valve, maintenance platform, etc. It has the characteristics of small volume, small footprint, high integration, easy installation, short construction period, low noise, no odor, easy coordination with the surrounding environment, and convenient implementation and maintenance management.

      The integrated prefabricated pump station is an ideal substitute for traditional sewage pump stations. Usually, traditional pump stations have very strict requirements for planning and construction, requiring every detail to be planned, and the installation of pump stations also requires a lot of manpower, material resources, and time. It is necessary to arrange the construction site and pour concrete, which requires a lot of time to wait for the concrete to harden. Then it is necessary to determine the water inlet point, drill holes, and install the necessary components. It will take at least 2 months to complete these processes. In the construction process of the pump station, it is also necessary to cooperate with contractors of various processes. These unnecessary processes will consume a lot of energy from planners, and the engineering quality of each contractor will also vary. With JZWS, you can complete all the processes including excavation, backfilling, compaction, connection, leak testing, control system installation, trial operation, final debugging, and document recording within one or two weeks. This will save 7 weeks of pump station installation time, with a time-saving rate of 80%. More importantly, it can solve a series of problems such as leakage and corrosion in traditional pump stations, pump failures, sediment deposition, environmental pollution, frequent maintenance, and high costs.

    AfterSalesService :

    Key words:
    • Prefabricated pump station