Prefabricated pump station, Chongzuo integrated pump station, Guangxi
Category:
Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment
Model:
JZPPS-2-8-20/3
Brand:
Yancheng Jinze Water Supply Equipment Co., Ltd
model:
JZPPS-2-8-20/3
pump power:
twenty
Flow meter specifications:
one hundred and eighty
Diameter of water outlet pipe:
four hundred
Inlet pipe diameter:
seven hundred
Processing & Customization:
yes
voltage:
three hundred and eighty
power:
twenty thousand
water temperature:
0-60
Device Name:
Prefabricated pump station
Overall dimensions:
200X800
Wastewater treatment capacity:
one hundred and twenty
Specifications:
2X8m
Is it a cross-border source of goods:
No
manufacturer:
Yancheng Jinze Water Supply Equipment Co., Ltd
Retail Price
26,000.00USD
重量
kg
- Product Description
-
model JZPPS-2-8-20/3
pump power twenty
Flow meter specifications one hundred and eighty
Diameter of water outlet pipe four hundred
Inlet pipe diameter seven hundred
Processing & Customization yes
voltage three hundred and eighty
power twenty thousand
water temperature 0-60
Device Name Prefabricated pump station
Overall dimensions 200X800
Wastewater treatment capacity one hundred and twenty
Specifications 2X8m
Is it a cross-border source of goods No
manufacturer Yancheng Jinze Water Supply Equipment Co., Ltd
Description :
Prefabricated pump stationBy using the lifting device of the booster pump station, the source water can be quickly and stably transported to the water plant and supplied to residents for use. This avoids the problems of high cost, land occupation, and unstable water supply caused by traditional water supply equipment and reservoirs. The sewage generated by residents' daily life is discharged directly, which can easily cause blockages and pollution of surrounding water sources. Adopting the prefabricated integrated pump station in Chongzuo, Guangxi, the sewage flows into the pump station and rises to the liquid level sensing point. The pump station will automatically operate to intercept and lift the sewage. Mix the solid and fibrous substances in the sewage evenly, allowing only 75mm diameter particles to pass through, and use a lifting device to pressurize and discharge the sewage. Thus achieving smooth and unobstructed discharge of pipeline sewage, and quickly transporting it to the sewage treatment plant. Many factories discharge a large amount of industrial wastewater during refining and production. Although these wastewater have been treated, they still contain a lot of solid substances, which can easily cause blockages in pipelines, form odors, and pollute surrounding water bodies when discharged directly. The prefabricated integrated pumping station in Chongzuo, Guangxi can also further mix and treat sewage to ensure its smooth flow.



AfterSalesService :
Key words:- Prefabricated pump station
More Products