Underground fire pump station anti floating box pump integrated equipment, buried booster pump station
Category:
Environmental Protection/Sewage treatment equipment/Buried sewage treatment equipment
Model:
JZFBZ-700-150-50-1
Brand:
Yancheng Jinze Water Supply Equipment Co., Ltd
model:
JZFBZ-700-150-50-1
purpose:
Fire water supply
Processing & Customization:
yes
Wastewater treatment capacity:
one hundred and sixty
category:
Underground fire pump station
Decontamination rate:
ninety-nine
pump power:
eighteen
Overall dimensions:
700x150x50
Flow meter specifications:
one hundred and sixty
Diameter of water outlet pipe:
four hundred
Inlet pipe diameter:
seven hundred
Specifications:
7X1.5X0.5m
Is it a cross-border source of goods:
No
manufacturer:
Yancheng Jinze
Retail Price
26,000.00USD
重量
kg
- Product Description
-
model JZFBZ-700-150-50-1
purpose Fire water supply
Processing & Customization yes
Wastewater treatment capacity one hundred and sixty
category Underground fire pump station
Decontamination rate ninety-nine
pump power eighteen
Overall dimensions 700x150x50
Flow meter specifications one hundred and sixty
Diameter of water outlet pipe four hundred
Inlet pipe diameter seven hundred
Specifications 7X1.5X0.5m
Is it a cross-border source of goods No
manufacturer Yancheng Jinze
Description :
Underground fire pump station Anti floating box pump integrated equipment Customers who have experience in integrating buried box pumps will not be unfamiliar with it. Its main principle is to increase its own weight and achieve anti floating effect based on Archimedes' principle. Simply speaking, the foundation without a bottom plate for anti floating is more complex than the foundation with buried strip beams, and its foundation cost is also higher than that of strip beams. Why is that? Because it requires the addition of steel bars to increase weight and resist the buoyancy of groundwater. This is also a manifestation of its own advantages. From the perspective of the integration of the tank pump itself, its price is advantageous because it is made with anti floating without a bottom plate, which means that the bottom plate is missing. It is connected to the anti floating foundation through the groove of the water tank side plate, so it has a price advantage. Because the non bottom plate anti floating buried box pump is a newly developed integrated product of box pumps in the past 2-3 years, some new customers are not very confident about its effectiveness. From the perspective of a legitimate manufacturer - Jinze Water Supply, you don't need to have doubts about it. Using the anti floating principle to integrate buried box pumps has a good effect. From the successful cases of our company's sales department, the practice of anti floating buried box pumps has become mature, and you don't need to have such concerns at all. You should trust the power!

Underground fire pump station anti floating box pump integrated equipment One of the main products of Yancheng Jinze brand, its equipment is customized according to customer needs for fire water tanks. Therefore, before ordering according to demand, it is necessary to understand the production cycle and installation cycle to avoid affecting the on-site construction period!
1. The integration of buried box pumps involves assembling and combining the molded plates, using bolts and sealing rings to seal and connect the plates. The bolts are tightened according to the dimensions of the water tank, length, width, and height;
2. After the integration of several large plate surfaces for the buried box pump, the bottom plate assembly is carried out. Firstly, the size of the water tank bottom plate is adjusted, and then the bottom plate is laid on the water tank foundation for sealing connection. After the bottom plate is connected, the sealing part is inspected by fire oil or visual inspection to reduce the phenomenon of weak sealing;
3. After connecting the integrated bottom plate of the buried box pump, the wall panel and bottom plate are connected. The bolt connection is to first code one side at a time on the bottom plate of the water tank. After the four walls are coded, adjust the connection by pressing the edges. The relative angle of the re measurement is generally not more than 2mm, and it is required to be in a straight line. The four corners should be perpendicular to the connection between the bottom and the wall surface;
4. After the bottom and wall of the integrated water tank with buried box pump are sealed and connected with bolts and sealing rings, the top and wall are then connected, and the edges are required to be basically on the same horizontal line. The manhole of the water tank is connected to the position according to customer requirements, usually located near the floating ball of the inlet hole;
5. After the connection and sealing of the integrated water tank body of the buried box pump are completed, then open the inlet, outlet, overflow, sewage, fire hole, and install the rear escalator near the manhole;
6. The internal reinforcement of the integrated box body of the buried box pump is made of stainless steel plate, which is bent into right angle angle steel and channel steel by a bending machine. The reinforcement connection is made in one layer 50cm above the bottom, with a vertical and horizontal spacing of 1m × 1m between the first layer, and 50cm between the second layer. The height and spacing are the same. Wall to wall, wall to bottom plate, wall to top plate are connected with angle steel; (The above is the greening plan. If it is necessary to add tension bars and station columns inside the vehicle to help the roof withstand pressure).
7. After the integrated work of the buried box pump is completed, if the site has water testing conditions, the water tank should be filled with water for pressure testing, and the sealing around the water tank should be checked for any leakage or seepage.


AfterSalesService :
Key words:- Underground fire pump station
More Products