Prefabricated pump station Yunnan fiberglass winding integrated prefabricated pump station
Prefabricated pump station Yunnan fiberglass winding integrated prefabricated pump station

Prefabricated pump station Yunnan fiberglass winding integrated prefabricated pump station

Category:

Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment

Model:

JZPPS-2-8-20/3

Brand:

Yancheng Jinze Water Supply Equipment Co., Ltd

model:

JZPPS-2-8-20/3

pump power:

twenty

Flow meter specifications:

one hundred and fifty

Diameter of water outlet pipe:

five hundred

Inlet pipe diameter:

seven hundred

Processing & Customization:

yes

voltage:

three hundred and eighty

power:

twenty thousand

water temperature:

0-60

Device Name:

Prefabricated pump station

Overall dimensions:

200X800

Wastewater treatment capacity:

one hundred and fifty

Specifications:

2X8m

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

26,000.00USD


重量

kg

  • Product Description
  • model

    JZPPS-2-8-20/3

    pump power

    twenty

    Flow meter specifications

    one hundred and fifty

    Diameter of water outlet pipe

    five hundred

    Inlet pipe diameter

    seven hundred

    Processing & Customization

    yes

    voltage

    three hundred and eighty

    power

    twenty thousand

    water temperature

    0-60

    Device Name

    Prefabricated pump station

    Overall dimensions

    200X800

    Wastewater treatment capacity

    one hundred and fifty

    Specifications

    2X8m

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

      Prefabricated pump stationThe fiberglass winding type is connected to the pipeline. When backfilling the foundation pit to the lower surface of the connecting pipe, the backfill surface is compacted before starting to connect the pipeline. It is not allowed to install pipelines and flexible joints without compacting the bottom of the pipe. Before installing the pipeline, it is necessary to check and ensure that all connections in the pump station have been tightened (which may loosen during transportation). The inlet and outlet pipes must be inspected according to the following items. The pipeline and sealing ring must be clean, and the inlet and outlet pipes must be aligned with the connection through a compensator. The sealing condition (to ensure tight sealing), the alignment pipe (no pressure), and symmetrically and evenly tightened. Other accessories of GPR fiberglass wrapped integrated prefabricated pump station, such as ventilation pipes, are provided and shipped in bulk and installed on site. The expensive maintenance costs caused by the failure of pump station installation are usually due to the following reasons: the underground backfill soil is not compacted, resulting in stress on the inlet and outlet pipelines. The external pipelines connected to the pump station were not properly supported, resulting in stress and damage to the inlet and outlet water pipelines of the pump station. When starting to backfill, the truck poured the material from one side, causing the tank to be subjected to unilateral force, resulting in deformation, leakage, and damage. If the cement base is uneven, the pump station will tilt, which will result in tank rupture or leakage. Larger stones falling into the backfill pit and rolling against the tank wall of the pump station will damage the tank body. If the excavation plan is not thorough or non-existent, it can easily lead to incorrect operation steps in the excavation work, which can cause the cement base to shift after installation and damage the pump station. If the backfilling is not well planned, groundwater will breed and eventually push the pumping station upwards due to its own water level.

      Maintenance of fiberglass wrapped integrated prefabricated pump station: Annual inspection of main equipment such as pumps, grilles, valves, control cabinets, and the overall appearance of the pump station. If the pump station is equipped with a basket grille, it needs to be regularly lifted and cleaned according to the actual situation of the incoming water quality, and the lubricating oil and worn grinding grille blades should be replaced regularly according to the requirements of the equipment manufacturer. Regularly check the phase to phase resistance balance and insulation resistance value according to the requirements of the equipment manufacturer. Regularly replace spare parts according to the requirements of the equipment manufacturer. Stop the pump station for major repairs every 5 years or upon special request.

    AfterSalesService :

    Key words:
    • Prefabricated pump station