Zhoushan 400m Obstacle Equipment Standard 400m 400m Obstacle
Category:
Sports and leisure/Sports supporting products/Other sports supporting products
Model:
DC651
Brand:
none
Retail Price
2,800.00USD
重量
kg
- Product Description
-
Description :
(1) 400 meter obstacle equipment welding: China's advanced imported two protection welding machine is used for carbon dioxide protection welding, with higher welding strength than ordinary welding, ensuring the firmness and aesthetics of the welding part; The 400m Obstacle Equipment Standard for Zhoushan 400m Obstacle Crossing the Sea and Landing on the Island 400m Obstacle Field is designed to simulate the actual combat environment of sea crossing and landing operations, with a focus on improving the adaptability of individual soldiers to sea combat. Following the laws of physical training and the principle of system combination, it simulates the special states of loading, crossing, transferring, and beach landing to varying degrees, integrating collective ability, skills, and psychological training to meet the training needs of sea crossing and landing operations. The venue adopts 4 turns, with a total of 10 projects, including the runway and obstacles set at intervals on the runway.
Now let's step into the university and get to know the 400 meter barrier for crossing the sea and landing on the island, helping everyone establish a clear impression.
Obstacle 1: Soft Bridge
Obstacle introduction: The soft bridge suspension is suspended in mid air, with a steep sloping bridge deck, simulating a floating bridge in real combat environments, and exercising the balance of the trainer's body.
Completion method: Run on the bridge and quickly pass through.
Tip: Lower your center of gravity and look straight ahead with both eyes; Step accurately and find the center line; Fast speed and steady body.
Obstacle 2: Spiral Ladder
Obstacle introduction: The spiral ladder consists of a rotating elevator, a circular platform, and a vertical pole, simulating a bumpy boat on the sea surface to exercise the stability of the trainer's movement.
Completion method: Quickly climb up the spiral ladder, travel around the platform once, and slide down from the middle vertical pole.
Tip guide: Hold both hands firmly, step steadily with both feet, and slide down with arms and feet against the vertical pole.
Obstacle 3: High and low horizontal beams
Obstacle introduction: The high and low crossbars are composed of four intersecting horizontal bars, simulating high and low obstacles on a ship and exercising the flexibility of the trainer.
Completion method: Bend down and pass through the low wood, and cross over and pass through the high wood.
Tip guide: Coordinate hands and feet, pay attention to connection.
Obstacle 4: Rope Net
Obstacle introduction: The rope net is an iron chain net suspended from the ground, with a horizontal bar at the top, which exercises the trainer's mental quality and overcomes the fear of heights.
Completion method: Climb from the bottom to the top, climb over the crossbar, grab the net and step on the node from the other side to land.
Tip guide: Hold onto the iron chain tightly with your hands and step firmly on the nodes with your feet.
Obstacle 5: Tire Climbing Platform
Obstacle introduction: The tire climbing platform consists of a suspension board, hanging tires, hemp rope, and soft ladder, etc., which exercises the trainer's ability to overcome obstacles in the air and improves body coordination.
Completion method: Quickly jump onto the tires one by one through the hanging board, climb to a high place, and use hemp rope or soft ladder to land.
Tip guide: Hands are faster than feet, grip firmly and step firmly; When sliding down, step on the rope with your feet first and alternate your hands downwards.
Obstacle 6: Swinging Platform
Obstacle introduction: The swinging platform consists of a platform and 9 staggered columns. During the movement, the platform swings left and right, simulating the shaking of a ship deck, and exercising the balance and stability of the trainer.
Completion method: Coordinate hands and feet, rotate the body back and forth, and pass through the platform.
Tip guide: Keep your body and legs close to the inside of the pillar, reach forward and grasp the pillar, and step forward with your legs.
Obstacle 7: Shaking the horizontal ladder
Obstacle introduction: The shaking horizontal ladder is composed of vertical poles, iron chains, and horizontal ladders. The height of the ladder poles is distributed, and the horizontal ladder shakes during the movement, which exercises the balance and coordination of the trainer and overcomes the fear of heights.
Completion method:
1. Grasp the crossbar, swing your body, cross the ladder, move your hands and feet alternately, and grab the crossbar to land.
2. Grasp the crossbar with both hands and move forward alternately.
Tip guide: Considering the physical exertion in the first 200 meters, it is recommended to use Method 1. Strong rhythm and steady movements.
Obstacle 8: Cross network
Obstacle introduction: The cross net is composed of elastic ropes, short poles, and floating bridges, simulating a flooded bridge deck to exercise the flexibility of the trainer.
Completion method: Lift your leg and quickly pass through.
Tip guide: Find the midline, turn your calves outward, lightly tap your toes, and maintain a steady pace.
Obstacle 9: Isolation Barrier Wall
Obstacle introduction: The isolation barrier wall is composed of a wall, hemp rope, and sliding rod. The wall has protrusions and grooves, which exercise the trainer's climbing ability.
Completion method: Grasp the hemp rope, climb up the wall with the help of protrusions or grooves, and scrape the wall from the other side to the ground.
Tip guide: "Point" should be firmly pressed, the center of gravity should be stable, and fear of heights should be overcome.
Obstacle 10: Simulating a Beach
Obstacle introduction: Simulating a beach paved with sand, simulating a beach landing, and exercising the trainer's beach sprinting ability.
Completion method: Take big strides and run through.
Tip guide: Try to swing your arms and sprint vigorously.
After watching these obstacle projects, I believe your heart is beating faster and you can't resist your motor nerves. You want to try it yourself. But be careful not to cross obstacles without protecting personnel, and always prioritize safety.

(2) Shot blasting rust removal: Physical and mechanical rust removal is used on the surface, which not only removes rust but also increases the surface area of the equipment, laying the foundation for strengthening the plastic powder adsorption ability in subsequent processes. This is an unparalleled advantage of acid pickling rust removal;
(3) Electrostatic spraying: Advanced electrostatic spraying equipment and advanced environmentally friendly electrostatic powder spraying technology are used to spray the surface of the equipment, greatly improving its weather resistance and impact resistance. The color remains unchanged for eight years, and surface shot blasting hardening and purification green environmental protection technology are adopted in the front sequence, making the surface quality of the product reach the international advanced level and more environmentally friendly than traditional phosphating treatment process.
(4) Connection parts of 400 meter obstacle equipment: All connection parts are fastened with specially designed anti loosening and anti-theft screws, ensuring that the equipment is protected from human damage and normal use, and also preventing scratches from water chestnuts during use. The surface meets the requirements of commonality, safety, and image. Zhoushan 400m Obstacle Equipment Standard 400m 400m Obstacle

(5) Our products are designed and produced strictly in accordance with the national standard - "General Requirements for Fitness Equipment Safety". During the production process, we strictly control the quality to ensure that each product leaves the factory with a qualified rate, pursue zero defects in products, and achieve industry standards. The 400 meter obstacle refers to a runway consisting of eight sets of obstacles, including a cross pile, trench, low wall, high board jumping platform, cloud ladder, single wooden bridge, high wall, and low pile net. Because we have to pass through obstacles once in both directions, it should be said that Cheng has to pass through obstacles 16 times. The sequence of passing is: 100 meters run → turn around the flag → cross the three-step pile → cross the trench → jump over the low wall → pass through the high board jumping platform → pass through the cloud ladder → pass through the single wooden bridge → climb over the high wall → drill and climb the low pile net → turn around the flag and return → cross the low pile net → climb over the high wall → turn around the column under the single wooden bridge → pass through the cloud ladder → pass through the high board jumping platform → drill through the hole → jump down and climb up the trench → cross the five step pile → turn around the flag → run 100 meters to the finish line. There are a total of 14 obstacles, mainly including training facilities such as cross piles, trenches, low walls, high board jumping platforms, single plank bridges, and high walls The flagpole is 1.5 meters high and has a diameter of about 5 centimeters. It consists of 5 cross stakes with a diameter of 0.3 meters and a height of 0.1 meters above the ground. The midpoints of the three cross piles on the right are 2.3 meters apart, 0.3 meters away from the centerline of the runway, and 5 meters away from the end line. The midpoints of the two span piles on the left are 2.3 meters apart and 0.6 meters away from the centerline of the runway. The midpoint of the first span pile is 6.15 meters away from the end line. Specifications for a single wooden bridge, dimensions of 5 * 0.25 * 0.23 meters, parameters for a single wooden bridge, price for a single wooden bridge, manufacturer of a single wooden bridge, length of 5 meters, height of 1.3 meters, diameter of 20-25 centimeters, width of the bridge plane of 10 centimeters, length of the inclined plate of 2 meters, and width of 20 centimeters. The columns under the bridge are spaced 1-1.30 meters apart and should be painted with red and white colors, mainly composed of steel pipes. High wall, low wall, high board jumping platform, single plank bridge, ground pile net
Detailed specifications of 400 meter obstacle equipment; Zhoushan 400m Obstacle Equipment Standard 400m 400m Obstacle
Plum Blossom Pile; Composed of 5 cross piles with a diameter of 0.3 meters and a height of 0.1 meters above the ground. The midpoints of the three cross piles on the right are 2.3 meters apart, 0.3 meters away from the centerline of the runway, and 5 meters away from the end line. The midpoints of the two cross piles on the left are 2.3 meters apart, 0.6 meters away from the centerline of the runway, and 6.15 meters away from the end line. Zhoushan 400m Obstacle Equipment Standard 400m 400m Obstacle
A low wall; Width of 2 meters, height of 1.1 meters, and thickness of 0.2 meters. The hole is 0.5 meters wide, 0.4 meters high, and its lower edge is 0.6 meters above the ground. It is located on the left side of the low wall.
High board; 1.8 meters high, 2 meters long, 0.5 meters wide, and 0.05-0.08 meters thick. The development of the Zhoushan 400m Obstacle Equipment Standard 400m Obstacle Basketball Stand has a long history. From the original basketball stand being just a simple basket, to fixing the basket at the two ends of the indoor sports room three meters above the ground and replacing the original backboard with wire mesh, with the continuous improvement of basketball game rules and court facilities, people removed the basket bottom from the prototype of the basketball stand, and replaced the peach basket with wire rings, and replaced the original wire fence with wooden boards to make backboards, making the basketball stand more efficient.
A typical set of parallel bars includes transitions between support position, inverted position, and hanging arm position; Athletes need to perform exercises such as swinging, bending, arching, looping, somersaulting, and stationary in these positions. The bottom line of the entire work requires standing on one side of the bar. Parallel bars were listed as a competitive event in 1896
Hengshui Training 2-meter high wall barrier board manufacturer
In short, teacher-student interaction is the main way to carry out primary school physical education teaching. When designing sports activities and teaching, emphasis should be placed on interaction with students, using various methods to stimulate their physical activity and truly realize the awareness of sunshine sports and students' ultimate development, making sports teaching real and effective.
Our company produces standard training equipment, including parallel bars, horizontal bar manufacturers, how much is a set of 400 meter obstacle equipment, cross stakes, trenches, low walls, high board jumping platforms, single plank bridges, high walls, low stakes nets, climbing ropes, climbing poles, climbing frames, marker posts, goats, obstacle boards, and other equipment
3. Please practice 2 after becoming proficient in 1. 4. The user weighs no more than 100 kilograms. 5. The angle of the frame shall not exceed 45 degrees from the column. 6. Limited to 2 people, 1 person standing. Hebei Dachuang Sports Equipment Co., Ltd. is a manufacturer of various sports equipment, outdoor fitness equipment, and related products. It integrates research and development, design, production, and sales, and is a large-scale enterprise that integrates production, supply, and sales.
Detailed specifications for 400 meter obstacles;
Plum Blossom Pile; Composed of 5 cross piles with a diameter of 0.3 meters and a height of 0.1 meters above the ground. The midpoints of the three cross piles on the right are 2.3 meters apart, 0.3 meters away from the centerline of the runway, and 5 meters away from the end line. The midpoints of the two cross piles on the left are 2.3 meters apart, 0.6 meters away from the centerline of the runway, and 6.15 meters away from the end line.
A low wall; Width of 2 meters, height of 1.1 meters, and thickness of 0.2 meters. The hole is 0.5 meters wide, 0.4 meters high, and its lower edge is 0.6 meters above the ground. It is located on the left side of the low wall.
High board; 1.8 meters high, 2 meters long, 0.5 meters wide, and 0.05-0.08 meters thick.
High platform; Height of 1.5 meters, length and width of 1 meter each.
Low platform; Height, length, and width are each 1 meter. High board, high platform, and low platform are spaced 1 meter apart.
Horizontal ladder; Length of 5 meters, width of 0.6 meters, height of 2.4 meters, horizontal bars of 0.03-0.04 meters, with a span of 0.5 meters between horizontal bars, and a distance of 0.3 meters from the high board jumping platform.
Since its establishment, Hengshui Training 2-meter high wall obstacle board manufacturer has continuously developed and produced 9 categories of equipment, including Changtai basketball hoops, gymnastics and athletics, dance poles, goal posts, indoor and outdoor fitness paths, plastic nets, teaching equipment, leisure chairs, and sanitation facilities. The sports equipment series products have long been renowned for their "good quality, beautiful appearance, and moderate price". We always adhere to the corporate purpose of "survival through quality, development through reputation" and the corporate spirit of "practicality, innovation, unity, and dedication", which has been unanimously praised by consumers.
Our company has been accredited to participate in bidding projects through the three system certification. We welcome users from all over the world to visit our company for on-site inspections and order sports equipment. We will be dedicated to serving you. It is a modern enterprise engaged in large-scale production of sports equipment in North China. With the flourishing of the sports industry, it has rapidly grown into a competitive sports equipment company in the market test. Located in the famous martial arts hometown of Cangzhou, it is adjacent to the Bohai Bay to the east, the Shuohuang Railway running through the east and west, the Beijing Shanghai Expressway running through the north and south, and the 205 National Highway running through the urban area. Its geographical location is superior and transportation is convenient.
The development of basketball hoops has a long history. From the original basketball hoop being just a simple basket, to fixing the basket at the two ends of the indoor sports room three meters above the ground and replacing the original backboard with wire mesh, later, with the continuous improvement of basketball game rules and court facilities, people removed the bottom of the basketball hoop, replaced the peach basket with wire rings, and replaced the original wire mesh with wooden boards to make backboards. This made basketball hoops more versatile.
A typical set of parallel bars includes transitions between support position, inverted position, and hanging arm position; Athletes need to perform exercises such as swinging, bending, arching, looping, somersaulting, and stationary in these positions. The bottom line of the entire work requires standing on one side of the bar. Parallel bars were listed as a competitive event in 1896
Hengshui Training 2-meter high wall barrier board manufacturer
In short, teacher-student interaction is the main way to carry out primary school physical education teaching. When designing sports activities and teaching, emphasis should be placed on interaction with students, using various methods to stimulate their physical activity and truly realize the awareness of sunshine sports and students' ultimate development, making sports teaching real and effective.
Our company produces standard training equipment, including parallel bars, horizontal bar manufacturers, how much is a set of 400 meter obstacle equipment, cross stakes, trenches, low walls, high board jumping platforms, single plank bridges, high walls, low stakes nets, climbing ropes, climbing poles, climbing frames, marker posts, goats, obstacle boards, and other equipment
3. Please practice 2 after becoming proficient in 1. 4. The user weighs no more than 100 kilograms. 5. The angle of the frame shall not exceed 45 degrees from the column. 6. Limited to 2 people, 1 person standing. Hebei Dachuang Sports Equipment Co., Ltd. is a manufacturer of various sports equipment, outdoor fitness equipment, and related products. It integrates research and development, design, production, and sales, and is a large-scale enterprise that integrates production, supply, and sales.
Detailed specifications for 400 meter obstacles;
Plum Blossom Pile; Composed of 5 cross piles with a diameter of 0.3 meters and a height of 0.1 meters above the ground. The midpoints of the three cross piles on the right are 2.3 meters apart, 0.3 meters away from the centerline of the runway, and 5 meters away from the end line. The midpoints of the two cross piles on the left are 2.3 meters apart, 0.6 meters away from the centerline of the runway, and 6.15 meters away from the end line.
A low wall; Width of 2 meters, height of 1.1 meters, and thickness of 0.2 meters. The hole is 0.5 meters wide, 0.4 meters high, and its lower edge is 0.6 meters above the ground. It is located on the left side of the low wall.
High board; 1.8 meters high, 2 meters long, 0.5 meters wide, and 0.05-0.08 meters thick.
High platform; Height of 1.5 meters, length and width of 1 meter each.
Low platform; Height, length, and width are each 1 meter. High board, high platform, and low platform are spaced 1 meter apart.
Horizontal ladder; Length of 5 meters, width of 0.6 meters, height of 2.4 meters, horizontal bars of 0.03-0.04 meters, with a span of 0.5 meters between horizontal bars, and a distance of 0.3 meters from the high board jumping platform.
Since its establishment, Hengshui Training 2-meter high wall obstacle board manufacturer has continuously developed and produced 9 categories of equipment, including Changtai basketball hoops, gymnastics and athletics, dance poles, goal posts, indoor and outdoor fitness paths, plastic nets, teaching equipment, leisure chairs, and sanitation facilities. The sports equipment series products have long been renowned for their "good quality, beautiful appearance, and moderate price". We always adhere to the corporate purpose of "survival through quality, development through reputation" and the corporate spirit of "practicality, innovation, unity, and dedication", which has been unanimously praised by consumers.
Our company has been accredited to participate in bidding projects through the three system certification. We welcome users from all over the world to visit our company for on-site inspections and order sports equipment. We will be dedicated to serving you.
High platform; Height of 1.5 meters, length and width of 1 meter each. Zhoushan 400m Obstacle Equipment Standard 400m 400m Obstacle
Low platform; Height, length, and width are each 1 meter. High board, high platform, and low platform are spaced 1 meter apart.
Horizontal ladder; Length of 5 meters, width of 0.6 meters, height of 2.4 meters, horizontal bars of 0.03-0.04 meters, with a span of 0.5 meters between horizontal bars, and a distance of 0.3 meters from the high board jumping platform.
single-plank bridge; Length of 5 meters, bridge deck width of 20 centimeters, thickness of 13 centimeters, height of 1.3 meters, inclined plate length of 2 meters and width of 0.2 meters
The columns under the bridge should be spaced 1-1.3 meters apart and painted with alternating red and white colors.
High walls; Width and height are 2 meters each, and thickness is 20 centimeters.
Low pile net; Twelve vertical stakes are arranged in two rows, with a spacing of 2 meters and a spacing of 1 meter. The stakes are raised 0.5 meters above the ground, and elastic materials are used to straighten the horizontal lines between each pair of stakes to form a pile network. The ground below the network should be covered with a soft sand layer. Zhoushan 400m Obstacle Equipment Standard 400m 400m Obstacle
400 meter obstacle equipment manufacturer tells you: the process of making 400 meter obstacle equipment
1. The main frame is welded with 12 # channel steel to form an I-shaped base, which is firmly welded and has a standard right angle. On the basis of the I-shaped base, weld channel steel and square tube as columns, and weld four triangular brackets near the column feet as supports to ensure stability and firmness. The middle is made of cedar wood, which has good thickness stability and can prevent a normal adult from tipping over. Zhoushan 400m Obstacle Equipment Standard 400m 400m Obstacle
2. Paint (spray coating), process: There are two colors: camouflage and military green. The wooden board and main frame are polished to ensure that there are no burrs on the main frame and wooden board, which is not easy to hurt hands. Surface spraying and spraying are carried out.
The surfaces of all steel parts of 400m barrier equipment are subject to primary treatment such as pickling, phosphating and sanding, and then the imported electrostatic epoxy based powder is applied for surface treatment. The product has the advantages of acid and alkali resistance, damp heat resistance, aging resistance, and beautiful appearance. It is suitable for wet and acid rain environments, and can be used indoors and outdoors. The product coating formula does not contain toxic elements, so as to avoid damaging the health of users.
Anqing Practice Competition Training Equipment Mobile 400m Obstacle Equipment Expansion Psychological Behavior Cloud Ladder Price
AfterSalesService :
Key words:- 400 meter obstacle equipment
More Products