Zhaoqing reaction kettle PU kettle is easy to operate and maintain
Zhaoqing reaction kettle PU kettle is easy to operate and maintain

Zhaoqing reaction kettle PU kettle is easy to operate and maintain

Category:

chemical industry/Reaction equipment/Reaction kettle

Model:

Brand:

Jinzong Machinery

Retail Price

Negotiable


重量

kg

  • Product Description
  • Description :

      Installation and operation specifications for reaction kettle

      1. The high-pressure reactor should be placed indoors. When equipping multiple high-pressure reactors, they should be placed separately. Each operating room should have an exit directly leading to the outside or passage, and the equipment grounding point should be ensured to have good ventilation.

      2. When installing the kettle cover, it is necessary to prevent the sealing surfaces between the kettle body and the kettle cover from colliding with each other. Carefully place the kettle lid in a fixed position on the kettle body, and when tightening the main nut, it must be tightened diagonally and symmetrically in multiple steps. Apply even force and do not allow the kettle lid to tilt to one side to achieve a good sealing effect.

      3. At the joint of the positive and negative nuts, only the positive and negative nuts are allowed to be rotated, and the sealing surfaces of the two circular arcs must not be rotated relative to each other. When all nut pattern connections are assembled, lubricating oil should be applied.

      4. The needle valve system is sealed with a thread. Simply rotate the valve needle gently and press the cover tightly to achieve a good sealing effect.

      5. Rotate the rotating body on the kettle by hand to check if it operates flexibly.

      6. The controller should be placed flat on the operating platform, with a working environment temperature of 10-40 ℃ and a relative humidity of less than 85%. The surrounding medium should not contain conductive dust or corrosive gases.

      7. Check whether the movable parts and fixed contacts on the panel and back panel are normal, remove the cover, and check whether the connector contacts are loose, whether there is damage or rust caused by poor transportation and storage.

      8. The controller should be reliably grounded.

      9. Connect all wires, including power lines, electric furnace lines between the controller and the kettle, motor lines, temperature sensor and speedometer wires.

      10. Close the "power" air main switch on the panel, and the digital display should show.

      11. Set various parameters (such as upper limit alarm temperature, working temperature, etc.) on the digital display, then press the "heating" switch to turn on the electric furnace, and the indicator light on the "heating" switch will light up. Adjust the "pressure adjustment" knob to adjust the heating power of the electric furnace.

      12. Press the "Mixing" switch to power on the mixing motor, and the indicator light on the "Mixing" switch will light up. Slowly turn the "Speed Control" knob to make the motor rotate slowly, observe whether the motor is rotating in the forward direction, and when there is no error, stop the machine, hang the belt, and restart.

      13. After the operation is completed, it can be cooled naturally, cooled with water, or placed on a bracket for air cooling. After the temperature drops, release the pressurized gas inside the kettle to reduce the pressure to atmospheric pressure (the pressure gauge shows zero). Then, loosen the main nut symmetrically and evenly, remove the main nut, and carefully remove the kettle cover and place it on the bracket.

      Maintenance of reaction kettle

      (1) Installation location: The reaction vessel should be installed in a high-pressure operating room that meets explosion-proof requirements. When multiple reaction vessels are equipped, they should be placed separately, and a safe explosion-proof wall should be used to separate each two vessels. Each operating room should have a passage and outlet to the outside, and good ventilation should be ensured when explosive media is present.

      (2) After opening the packaging, check for any damage to the equipment. Install the equipment according to the structural diagram based on the equipment model, and verify the components provided according to the packing list. If the heating method is thermal oil electric heating, please purchase the corresponding model of thermal oil according to the operating temperature (note: thermal oil does not allow moisture) and add it. When adding, open the oil filling port on the upper part of the jacket and the oil level port on the upper part of the jacket. Add oil through the filling port until the oil level flows out; Twist the oil level port tightly afterwards, do not twist the oil filling port tightly to avoid pressure.

      (3) Installation and sealing of kettle body and kettle cover: The kettle body and kettle cover are in line contact with the circular arc surface using gaskets or conical surfaces, and are tightly pressed against each other by tightening the main nut to achieve a good sealing effect. When tightening the nut, it must be diagonally symmetrical and gradually tightened multiple times with even force. It is not allowed for the kettle cover to tilt to one side to achieve a good sealing effect. When tightening the main nut, do not exceed the specified tightening torque range of 40-120N. M to prevent the sealing surface from being crushed or overloaded for wear. Special care should be taken for the sealing surface. Before each installation, use a soft paper or cloth to wipe the upper and lower sealing surfaces clean, and be careful not to touch the sealing surfaces of the kettle body and lid. If operated reasonably, it can be used more than tens of thousands of times. After the sealing surface is damaged, it needs to be reprocessed and repaired to achieve good sealing performance. When disassembling the kettle cover, it should be slowly lifted up and down to prevent the sealing surfaces between the kettle body and the kettle cover from colliding with each other. If gaskets (PTFE, aluminum, copper, asbestos, etc.) are used for sealing, a good sealing effect can be achieved by tightening the main nut.

      (4) The installation of valves, pressure gauges, and safety valves achieves a sealing effect by tightening the positive and negative nuts. The circular sealing surfaces at both ends of the connection must not rotate relative to each other. When assembling all screw connections, lubricant or graphite mixed with oil must be applied to prevent them from biting. The use of valves: Needle valves are line sealed, and good sealing performance can be achieved by gently rotating the valve needle and compressing the sealing surface. Excessive force is prohibited to avoid damaging the sealing surface.

      (5) After the equipment is installed, introduce a certain amount of nitrogen and maintain pressure for 30 minutes to check for any leaks. If any leaks are found, use soap foam to locate the leakage points in the pipelines and pipe openings. After finding them, release the gas and tighten them. Then, conduct a nitrogen pressure test again to ensure that there are no leaks before starting normal operation.

      The reaction kettle is an indispensable anti-corrosion equipment in the chemical industry. Mechanical collisions, sudden temperature changes, and other factors often cause porcelain detachment, cracks, bubbles, pores, and other damage to the glaze during use. These defects are never allowed in enamel equipment, and once this phenomenon occurs, it must be repaired. The on-site repair agent of Fushilan polymer composite material is a two-component composite material composed of polymer, alloy steel powder or wear-resistant ceramic powder as the substrate, and a curing agent. Compared with ordinary resin based repair agents, polymer composite materials rely on their finer polymer structure, which gives the material stronger adhesion and excellent corrosion resistance. Polymers can even penetrate into metals, forming a tighter polymer composite protective layer. Repair process: surface cleaning → rust removal → anhydrous alcohol cleaning → Fushi Blue coating bottom repair agent → Fushi Blue coating surface repair agent → curing → use.