Haichen supplies two-component polysulfide sealant paste for building elastic sealant and high-performance building sealant construction method
Category:
building materials/Building adhesives/Other building adhesives
Model:
01
Brand:
Hengshui Haichen New Material Technology Co., Ltd
model:
01
appearance:
Paste paste
solidification conditions:
high-temperature curing
viscosity:
eighty
solid content:
sixty
shear strength:
fifty
relative density:
one point six
Initial dry time:
less than 2
curing time:
Less than 12
Minimum film-forming temperature:
≤3mm
Scope of application:
-40-50
density:
one point six
Film formation time:
two
Tensile adhesion:
a) 0.6-8
elongation:
0.6-8
manufacturer:
Hengshui, Hebei
Retail Price
230.00USD
重量
kg
- Product Description
-
model 01
appearance Paste paste
solidification conditions high-temperature curing
viscosity eighty
solid content sixty
shear strength fifty
relative density one point six
Initial dry time less than 2
curing time Less than 12
Minimum film-forming temperature ≤3mm
Scope of application -40-50
density one point six
Film formation time two
Tensile adhesion a) 0.6-8
elongation 0.6-8
manufacturer Hengshui, Hebei
Description :
Two component flowing polysulfide sealant self leveling two-component polysulfide sealant
Polyurethane building sealant belongs to the Bai two-component reaction curing type, consisting of two components A and B. Component A is a milky white or light yellow viscous polyurethane prepolymer, while component B is a black paste or liquid formed by dehydrating a mixture of curing agents and additives. After curing, it has a certain degree of elasticity and adhesion (component A: component B=10:0.8-1.2).
Grassroots treatment: The adhesive surface must be neatly treated (using handheld cutting machines, grinding wheels, brushes, etc.) to expose a solid structural layer on the adhesive surface.
This product is used for connecting building materials such as civil engineering and construction, transportation, and precast concrete components, as well as filling and sealing construction joints. Sealing of connections at advanced roads, bridges, runways, underground pipelines, joints, as well as expansion and deformation joints in tunnels and buildings.
Precautions
Buildings must be kept dry, clean, and free of oil stains.
Before construction, the primer should be applied to the surface first. After the surface is dry, a 50mm wide protective tape should be applied to both sides of the gap 10mm to prevent excess polysulfide adhesive from dirtying the surface of the structure during construction.
Mix one bucket of white polysulfide adhesive (component A) and one bag of black curing agent (component B) thoroughly inside the box until there is no color difference.
(Note: Due to different climates, component B should be more abundant in winter and less in summer) A: B=10:0.8-1.2, and a small test should be conducted before use
AfterSalesService :
Key words:- Two component polysulfide sealant paste
More Products