Haichen supplies GB type butyl rubber putty waterstop, rubber butyl putty waterstop, butyl putty waterstop installation
Haichen supplies GB type butyl rubber putty waterstop, rubber butyl putty waterstop, butyl putty waterstop installation

Haichen supplies GB type butyl rubber putty waterstop, rubber butyl putty waterstop, butyl putty waterstop installation

Category:

Rubber and plastic/Rubber tape/rubber waterstop

Model:

01

Brand:

Hengshui Haichen New Material Technology Co., Ltd

model:

01

material:

Nitrile rubber

Is it imported:

No

Processing & Customization:

yes

width:

Customizable according to needs

Specifications:

300*8

product grade:

Level 1

thickness:

eight

shape:

flaky

Place of Origin:

Hengshui, Hebei

unit:

rice

grade:

01

Product Name:

Butyl putty waterstop

Item Number:

01

cross-sectional shape:

flaky

Is it a cross-border exclusive commodity:

No

manufacturer:

Hengshui Haichen

Retail Price

35.00USD


重量

kg

  • Product Description
  • model

    01

    material

    Nitrile rubber

    Is it imported

    No

    Processing & Customization

    yes

    width

    Customizable according to needs

    Specifications

    300*8

    product grade

    Level 1

    thickness

    eight

    shape

    flaky

    Place of Origin

    Hengshui, Hebei

    unit

    rice

    grade

    01

    Product Name

    Butyl putty waterstop

    Item Number

    01

    cross-sectional shape

    flaky

    Is it a cross-border exclusive commodity

    No

    manufacturer

    Hengshui Haichen

    Description :

      Installation of steel plate putty waterstop:

      Overlap the steel plate putty connection by 100mm, press it tightly by hand to eliminate air and firmly bond it by itself, and reinforce the rolled wire before reapplying the protective film. The steel plate putty waterstop is placed in the middle of the wall and fixed to the steel bars with wire. The waterstop is slightly higher than the concrete interface. Before the first pouring, remove the protective film at the lower end of the steel plate putty waterstop, pour the concrete to 1/21/3 of the width of the steel plate putty, remove the upper protective film before the second pouring, and then pour again.

      Construction and installation precautions for steel plate putty waterstop:

      Use steel bars or templates to apply steel plate putty waterstop. The water stop strip between construction joints is generally poured into the concrete first, and the other half is buried in the concrete during the second phase of construction. Therefore, the fixing method of steel plate putty waterstop must be reliable to avoid displacement. Before the second phase construction, the other half of the waterstop should be protected. Pour concrete. During the pouring process, attention should be paid to the pouring pressure and method to avoid sharp stones and steel bars from puncturing the steel plate putty waterstop in the concrete.

    AfterSalesService :

    Key words:
    • GB type butyl rubber putty waterstop