Conductivity coefficient of Sichuan Liangshan special oil resistant conductive primer and conductive paint
Conductivity coefficient of Sichuan Liangshan special oil resistant conductive primer and conductive paint

Conductivity coefficient of Sichuan Liangshan special oil resistant conductive primer and conductive paint

Category:

fine chemicals /Coatings, Paints/Industrial anti-corrosion coating

Model:

hh128

Brand:

Shandong Haiheng

Retail Price

23.00USD


重量

kg

  • Product Description
  • Description :

    Special resistant paint

      form:

      A two-component oil resistant coating composed of hydroxyl containing polyester, pigment fillers, additives, and isocyanate prepolymers.

      Features:

      1. Drying at room temperature can save a lot of energy.

      2. Has super strong adhesion and impact resistance.

      3. Has good oil resistance, corrosion resistance, and moisture resistance.

      Usage: Widely used for inner wall protection of large oil tanks, as well as for transmission gearboxes, ship oil tanks, oil storage tanks, and other work in contact with oil media.

      Curing agent: Paint resistant special curing agent dosage (weight ratio)

      primer

      Main paint: curing agent=6:1 Topcoat Main paint: curing agent=5:1 or according to specific requirements, use according to the specified ratio on the product certificate.

      Available time: 4 hours

      Storage stability;

      After 6 months, if the storage period is exceeded, it can be inspected according to the technical requirements of this standard. If it meets the requirements, it can continue to be used.

      Painting methods: brush coating, air spraying, high-pressure airless spraying, roller coating, and other construction methods.

      Notes:

      1. Before painting, the surface of the workpiece should be sandblasted and shot blasted, with a surface cleanliness requirement of Sa2.5 level and a surface roughness of about 60um. The surface of the workpiece must be free of oil stains, moisture, and other impurities.

      2. Before use, stir the main paint evenly, then mix the two components by weight, stir well, and let it stand for 20-30 minutes.

      3. The interval between each coat of paint is 12-24h. If the interval is too long due to special reasons, the surface of the sandpaper paint film should be polished slightly and cleaned before applying the next coat of paint. The painted workpiece should be dried for 7 days before oil can be added.

      4. Unused curing agents should be immediately sealed to prevent gel deterioration.

      Construction temperature:

      It should be above 5 ℃. If construction is carried out on the surface of old paint, the old paint surface should be roughened.

      Storage: Store in a well ventilated and dry place, with a product storage period of 1 year.

      Packaging: 20kg topcoat per barrel, 24kg primer per barrel, 4kg curing agent per barrel

    AfterSalesService :

    Key words:
    • Special oil resistant and static conductive primer