Customized steam steel sleeve, steel drainage joint, steel sleeve, steel outlet elbow, insulation steel pipe, steel sleeve, steel large and small head fixing joint
Customized steam steel sleeve, steel drainage joint, steel sleeve, steel outlet elbow, insulation steel pipe, steel sleeve, steel large and small head fixing joint

Customized steam steel sleeve, steel drainage joint, steel sleeve, steel outlet elbow, insulation steel pipe, steel sleeve, steel large and small head fixing joint

Category:

building materials/Pipe fittings/seamless steel tube

Model:

three hundred and seventy-seven

Brand:

Baosteel

brand:

Baosteel

model:

three hundred and seventy-seven

production process:

Cold drawn tube

cross-sectional shape:

round tube

connection method:

welded type

purpose:

high-pressure boiler tube

wall thickness:

five

outer diameter:

five hundred and thirty

nominal diameter:

three hundred and seventy-seven

grade:

Xingsong

Is it imported:

No

Processing Service:

customized sample

quality grade:

genuine product

delivery service:

Can be delivered to the factory

Type of goods sales:

spot

weighing method:

theoretical weight

Specifications:

168*8

Product surface description:

Steel sleeve steel outlet elbow with hydrophobic internal structure 1. Anti corrosion layer: protects the outer elbow from corrosive substances that corrode the steel pipe, extending the service life of the elbow. 2. External protection elbow: protects the insulation layer from groundwater erosion, supports the working pipe and can withstand certain external loads, ensuring the normal operation of the working elbow. 3. Polyurethane foam layer: ensure the medium temperature, and ensure that the surface of the external protection pipe is kept at normal temperature. 4. Barrier and reflective layer: ensure that the organic foam material does not enter the inorganic

manufacturer:

Xingsong

Retail Price

1,680.00USD


重量

kg

  • Product Description
  • brand

    Baosteel

    model

    three hundred and seventy-seven

    production process

    Cold drawn tube

    cross-sectional shape

    round tube

    connection method

    welded type

    purpose

    high-pressure boiler tube

    wall thickness

    five

    outer diameter

    five hundred and thirty

    nominal diameter

    three hundred and seventy-seven

    grade

    Xingsong

    Is it imported

    No

    Processing Service

    customized sample

    quality grade

    genuine product

    delivery service

    Can be delivered to the factory

    Type of goods sales

    spot

    weighing method

    theoretical weight

    Specifications

    168*8

    Product surface description

    Steel sleeve steel outlet elbow with hydrophobic internal structure 1. Anti corrosion layer: protects the outer elbow from corrosive substances that corrode the steel pipe, extending the service life of the elbow. 2. External protection elbow: protects the insulation layer from groundwater erosion, supports the working pipe and can withstand certain external loads, ensuring the normal operation of the working elbow. 3. Polyurethane foam layer: ensure the medium temperature, and ensure that the surface of the external protection pipe is kept at normal temperature. 4. Barrier and reflective layer: ensure that the organic foam material does not enter the inorganic

    manufacturer

    Xingsong

    Description :

      Hebei Xingsong Industrial Pipeline Anti corrosion and Insulation Engineering Company is a modern and civilized industrial enterprise that integrates scientific research, production, sales, construction, and service. Located in the central areas of Beijing, Tianjin, and Shijiazhuang, the company covers an area of 28500 square meters and has strong technical strength, excellent technical equipment, and talents. Our company mainly produces polyurethane products, rock wool products, fiberglass wrapped pipes, polyethylene, etc. Our company can customize various shaped products according to customer requirements, achieve scientific design, reasonable construction, and ensure that the quality of the products meets customer needs. Over the past few years, the company has established its own brand, Xinda, through excellent products, thoughtful services, and honest behavior, and has become a major player in the construction of many projects in China. At that time, we welcome calls and visits from manufacturers from all over the world to discuss business. Enterprise goals: Quality, the foundation of business, management, and the path to strong business; Efficiency is the source of prosperity. Driven by technology and striving for survival through quality. Seek efficiency from quality. Benefit comes from the return of serving society. Enterprise tenet: Quality comes before production, customer first, providing customers with excellent products and thoughtful services. Our commitment: The market is changing, but our commitment remains unchanged. The company adheres to the principle of "excellent quality, reputation first" to serve society and benefit humanity. Our company mainly produces polyurethane composites, foam insulation boards, foam insulation pipes, rock wool products, FRP winding pipes, and high-density polyethylene black and yellow jacket pipes (i.e., thermal insulation outer protective layer); Prefabricated polyurethane direct buried insulation pipe (i.e. pipe foam insulation); Prefabricated insulation elbow; Prefabricated insulation pipe fittings; Waiting for insulation materials. Our company can customize various shaped products according to customer requirements. And undertake polyurethane foam insulation projects for various large, medium, and small pipelines such as steam pipes, plumbing pipes, air conditioning pipes, power pipes, HVAC pipes, etc.

      To solve the above problems, the present utility model provides a steam pipeline drainage device, which avoids the influence of impurities on the drainage valve and causes steam waste. To achieve the above objectives, the steam pipeline drainage device of the present utility model comprises a water tank connected to the steam pipeline through multiple drainage pipes. The lower part of the water tank is equipped with a drainage valve and a drain valve, and the upper part is equipped with a second drainage valve. The water tank is equipped with a pressure gauge. The water tank is composed of a box body and end caps located at both ends of the box body. The steam pipeline drainage device of this utility model overcomes the influence of impurities on the normal operation of the drainage valve, avoids steam waste, extends the service life of the drainage valve, and reduces the number of drainage valves used, saving costs.

      Figure I is a schematic diagram of the existing steam pipeline drainage method; Figure 2 is a schematic diagram of the steam pipeline drainage device of the present utility model.

      Specific implementation method

      Figure 2 is a schematic diagram of the steam pipeline drainage device of the present utility model. As shown in the figure, the steam pipeline drainage device of the present utility model includes a water tank 0 connected to the steam pipeline through a drainage pipe I. The lower part of the water tank 0 is equipped with a drainage valve and a discharge valve 3, and the upper part is equipped with a second drainage valve 2. The water tank 0 can be composed of a box body and end caps located at both ends of the box body. The drain valve, second drain valve 2, and drain valve 3 can all be installed on the end caps of the water tank 0. The water tank 0 is installed in the direction shown in the figure, with the drain valve and drain valve 3 located at the lower part of the water tank 0, and the second drain valve 2 located at the upper part of the water tank 0. The drain valve 3 is located at the bottom of the water tank 0, while the drain valve is kept at a distance from the bottom to prevent impurities from blocking the drain valve. The distance can be/4 from the bottom to the top of the water tank. The steam pipeline is connected to water tank 0 through multiple drain pipes I. When there is condensed water in the steam pipeline, it can flow into water tank 0 through drain pipe I. As the volume of water tank 0 is much larger than that of the original drain pipe I, any debris will settle at the bottom of water tank 0. When discharge is required, it can be discharged through discharge valve 3. During normal operation, drain water through the drain valve. If there is an abnormality or a large amount of debris causing the drain valve to be blocked, the condensed water in water tank 0 will rise and reach the upper second drain valve 2 to start draining. At this time, it is necessary to clean water tank 0. You can open the end caps at both ends and clean the debris in water tank 0 or clean the drain valve. In order to constantly monitor the pressure inside the water tank, a pressure gauge 4 is installed on the water tank 0 to observe the pressure changes inside the water tank 0. Multiple drainage pipes of the steam pipeline can be connected to the steam pipeline drainage device of the present utility model, and the drainage device of the present utility model only needs to install two drainage valves, which solves the problem of steam escape caused by a single drainage valve. Regularly opening the drain valve can ensure long-term effective use.

      Claims of Rights A steam pipeline drainage device, characterized in that it comprises a water tank connected to the steam pipeline through multiple drainage pipes. The lower part of the water tank is equipped with a drainage valve and a drain valve, and the upper part is equipped with a second drainage valve.

      2. The steam pipeline drainage device according to claim I, characterized in that a pressure gauge is installed on the water tank.

      3. The steam pipeline drainage device according to claim I, characterized in that the water tank is composed of a box body and end caps located at both ends of the box body.

      The utility model discloses a steam pipeline drainage device, which includes a water tank connected to the steam pipeline through multiple drainage pipes. The lower part of the water tank is equipped with a drainage valve and a discharge valve, and the upper part is equipped with a second drainage valve. The use of the steam pipeline drainage device of this utility model avoids steam waste, extends the service life of the drainage valve, reduces the number of drainage valves used, and saves costs.

    AfterSalesService :

    Key words:
    • Steam steel sleeve steel hydrophobic joint