Insulation fixed section, steel sleeve, steel fixed bracket, insulation pipe, custody bracket, support, customized according to the drawing
Category:
building materials/Pipe fittings/seamless steel tube
Model:
three hundred and seventy-seven
Brand:
Baosteel
brand:
Baosteel
model:
three hundred and seventy-seven
production process:
Cold drawn tube
cross-sectional shape:
round tube
connection method:
welded type
purpose:
high-pressure boiler tube
wall thickness:
five
outer diameter:
five hundred and thirty
nominal diameter:
three hundred and seventy-seven
length:
twelve
grade:
Xingsong
Is it imported:
No
Processing Service:
customized sample
quality grade:
genuine product
delivery service:
Can be delivered to the factory
Type of goods sales:
spot
weighing method:
theoretical weight
Specifications:
219*6
Product surface description:
Steel sleeve fixed bracket support, also known as insulation fixed bracket, can be divided into water transmission polyurethane insulation fixed section and steam steel sleeve steel insulation fixed section. Today, we will talk about the steam steel sleeve steel insulation fixed section in the insulation pipe fittings factory. This type of steel sleeve steel insulation fixed section is used in the process of laying buried steam pipelines. Due to the high pressure generated by steam transmission, the steel sleeve steel fixed section can fix the pipeline and prevent pipeline damage
manufacturer:
Xingsong
Retail Price
168.00USD
重量
kg
- Product Description
-
brand Baosteel
model three hundred and seventy-seven
production process Cold drawn tube
cross-sectional shape round tube
connection method welded type
purpose high-pressure boiler tube
wall thickness five
outer diameter five hundred and thirty
nominal diameter three hundred and seventy-seven
length twelve
grade Xingsong
Is it imported No
Processing Service customized sample
quality grade genuine product
delivery service Can be delivered to the factory
Type of goods sales spot
weighing method theoretical weight
Specifications 219*6
Product surface description Steel sleeve fixed bracket support, also known as insulation fixed bracket, can be divided into water transmission polyurethane insulation fixed section and steam steel sleeve steel insulation fixed section. Today, we will talk about the steam steel sleeve steel insulation fixed section in the insulation pipe fittings factory. This type of steel sleeve steel insulation fixed section is used in the process of laying buried steam pipelines. Due to the high pressure generated by steam transmission, the steel sleeve steel fixed section can fix the pipeline and prevent pipeline damage
manufacturer Xingsong
Description :
Steel sleeve steel insulation fixed joint fixed bracket fixed pier compensator installation and pipeline cold tightening 1. Compensator installation 1) When installing horizontally, the vertical arm should be placed horizontally, and the parallel arm should have the same slope as the pipeline; 2) When installing vertically, it is not allowed to open holes on the bent pipe to install air ducts and drainage pipes; 3) The pre offset of the sliding bracket at the compensator should comply with the provisions of the design drawings; 4) The vertical arm length deviation and plane distortion deviation of the compensator should not exceed ± 10mm; 5) At both ends of the pipe section near the fixed support, a gap should be left according to the design requirements for stretching, and cold drawing should be carried out simultaneously, uniformly, and symmetrically at both ends. The allowable error of the cold drawing value is 10mm. 6. One end of the inner sleeve with a weld seam should be installed facing the flow direction of the medium on a horizontal pipeline, and the weld seam should be placed on the upper part on a vertical pipeline; 7) During installation, temporary support devices should be added at both ends of the compensator. After the pipeline is installed and fixed, the temporary facilities should be removed and checked for uneven settlement. 2. Cold tightening of steel sleeve steel insulation fixed joint fixed bracket fixed pier natural compensation pipe section 1) The cold tightening port position should be left in a favorable welding and operation location, and the cold tightening length should comply with the design requirements; The position of the cold tight joint should be left in a favorable welding and operation area, and the cold tight length should comply with the design specifications; 2) The fixed brackets at both ends of the cold tight section should be installed firmly, the concrete or filled mortar has reached the design strength, and the pipeline and fixed support have been fixedly connected; 3) The supports and hangers on the pipe section have been installed, and sufficient displacement allowance should be reserved for the hangers near the cold tight joint. The spring of the spring bracket should be pre compressed and temporarily fixed according to the design position, and the spring should not bear the load of the pipe; 4) All other welds on the pipe section have been welded and inspected as qualified; 5) The inclination direction and slope of the pipe section comply with the design specifications; 6) The bolts of flanges, instruments, and valves have all been tightened; 7) After the cold tight joint welding is completed and inspected as qualified, the cold tight clamp can be removed; 8) Records should be filled out for pipeline cold tightening.
AfterSalesService :
Key words:- Insulation fixed joint
More Products