Diesel engine steel wheel common rail locomotive CCG3.0/600 safety explosion-proof
Category:
mechanical equipment/Fishery machinery and equipment/Mining vehicles and auxiliary equipment
Model:
CCG3.0/600
Brand:
Tai'an Yucheng
Retail Price
5,000.00USD
重量
kg
- Product Description
-
Description :
Diesel engine steel wheel conventional rail locomotiveCCG3.0/600Explosion-proof safety
Diesel engine steel wheel common rail locomotive, diesel engine steel wheel common rail locomotiveCCG3.0/600,CCG3.0/600Diesel tractor
1、 The CCG3.0/600 model of diesel engine steel wheel conventional rail locomotive represents:
2、 Diesel engine steel wheel common rail locomotive CCG3.0/600 parameters:
Model: CCG3.0/600
Wheelbase: 735mm
Track gauge: 600/762/900mm
Turning radius: 5m
Diesel engine power: 12kw
Starting method: manual/electric start
Traction force: 4.5KN
Traction tonnage: 18T (slope<5)
Traction speed: Forward 3.0 7.0 10 km/h
Backward 2.2 5.2 7.4km/h
Dimensions: 2400 * 950 * 1520mm (front wheel drive)
2500 * 950 * 1550mm (side drive)
3、 Preparation before starting the CCG3.0/600 diesel engine steel wheel conventional rail locomotive
1. Add cooling water
Add clean water to the diesel engine cooling water tank and exhaust treatment tank (do not use mud or hard water with high salt and alkali content), and add it to the float until it reaches the point.
2. Add diesel fuel
Use 0-grade light diesel oil in summer and -10 or -20 grade light diesel oil in winter. Diesel oil must be allowed to settle for 48 hours and all oil storage tools must be clean.
3. Add engine oil
Use HC-11 high-speed diesel engine oil in summer and HC-8 high-speed diesel engine oil in winter. The engine oil must be clean and added between the upper and lower marks on the dipstick. During normal operation, it should not be lower than the lower mark or exceed the upper mark.
4. A small amount of lubricating oil should be added to each shift in the following areas:
A: Separate the oil injection area of the claw. B: Oil injection point for brake control system.
5. Add a small amount of lubricating grease to the chain.
6. Fill the exhaust treatment box with purified liquid.
7. Check the lubricating oil in the gearbox once a day, and replenish the lubricating oil when the oil level is below the lower limit.
Tai'an Yucheng has exquisite technology and excellent equipment inspection. We always adhere to the principles of quality first, integrity-based, technology, and cooperative development, never forgetting our original intention and constantly developing.




AfterSalesService :
Key words:- Diesel engine steel wheel conventional rail locomotive