Spray rapid setting rubber asphalt waterproof coating manufacturer produces a large quantity for engineering use
Category:
building materials/Waterproof and fireproof functional materials/Waterproof material
Model:
SH
Brand:
double rainbow
Retail Price
Negotiable
重量
kg
- Product Description
-
Description :
Spray rapid setting rubber asphalt waterproof coatingProduct Description
Product Introduction
Double rainbow spray quick setting rubber waterproof coating, also known as spray quick setting polymer rubber asphalt waterproof coating, is a water-based spray coating composed of rubber modified asphalt lotion and accelerator, which is quickly formed by special spraying equipment or manual painting.
Product Features
1. Adopting spray coating technology, high efficiency, seamless connection, and no water leakage. It has unique features for objects with irregular structures or complex shapes, and the construction is very simple and convenient;
2. Strong adaptability to grassroots materials, suitable for use on reinforced concrete, profiled steel plates, plastics, and various masonry materials;
3. Spray coating surface treatment is simple, and there are no special requirements for a leveling layer. It can be directly applied when the humidity is above 80%;
4. During the construction process, it can operate continuously without volatile organic compounds, is non-toxic and odorless, has no exhaust emissions, does not pollute the environment, and can be used in enclosed spaces;
5. The coating has superior weather resistance, acid and alkali resistance, aging resistance, and does not require a surface protective layer, which can effectively reduce engineering costs;
6. The service life is over 50 years, and it can be used in an environment not lower than 5 ℃. It has superior and excellent anti peeling and anti puncture capabilities;
7. After spraying, it can be formed within 3-5 seconds, can be stepped on, and has over 15 times the ductility and 95% recovery, as well as effective sound insulation performance;
8. Multiple construction methods (spraying, painting, etc.) are flexible and simple, which can meet the requirements of various environments such as drainage outlets, parapets, internal and external corners, and cracked areas.
Execution standard: JC/T2215-2014
Construction technology:
Two component (spray type), with component A (liquid material) and component B (liquid material) being sprayed by specialized spray rapid setting equipment according to predetermined ratios, pressures, etc., and solidified into a film in 3-5 seconds. Suitable for underground tunnel arches and other areas that are not easy to apply during construction, as well as large-scale waterproofing construction.
Before large-scale spraying, it is necessary to wait until all the additional layers have formed a film. First, check the integrity of the spraying machine, whether the spray gun of the spraying machine is clean, and whether the raw material transfer pipe, filter screen, and valve are functioning properly. Spraying operations should be carried out in different zones and covered in advance. Adjust the distance and angle between the nozzle and the base surface, as well as the pressure of the spraying equipment, to achieve surface entrainment of the material after spraying, without exposing the bottom and with uniform thickness.
Notes:
1. Construction is divided into mechanical spraying method and manual scraping method. Large scale construction should be carried out using spraying method. For strengthening details such as pipe roots, water outlets, parapets, and corners, manual scraping method should be used. For repairing cracks and construction of areas that are difficult to spray, manual scraping method should be used.
2. The construction environment temperature for rapid setting liquid rubber waterproof material should be between 5 ℃ and 35 ℃. Construction is not allowed on rainy days, snowy days, or winds above level 5.
Product application restrictions:
1. Mechanical spraying construction shall not be used when the construction temperature is less than 5 ℃;
2. Before the product is formed, it cannot be frozen (except for uncured liquid rubber);
3. Cannot be applied on surfaces with visible water or frost;
4. Cannot be used on rainy days or within 12 hours of rain (except for uncured liquid rubber);
5. Efforts should be made to ensure that the construction surface is dry, flat, and firm, without dust, grease, resin, or other foreign pollutants (such as benzene, etc.);
6. The product should not be stored in direct sunlight for a long time. The storage period is one year under good sealing and temperature>5 degrees Celsius storage conditions.
AfterSalesService :
Key words:- Spray rapid setting rubber asphalt waterproof coating
More Products