FYT-2 polymer bridge deck waterproof coating double rainbow waterproof
Category:
building materials/Waterproof and fireproof functional materials/Waterproof material
Model:
SH-115
Brand:
double rainbow
Retail Price
Negotiable
重量
kg
- Product Description
-
Description :
Really hanging! The driver sneezed and the car lost control and crashed into the bridge guardrail
At around 10:45 on January 9th, a man named Zhang was driving a small ordinary passenger car with a license plate of Yu, traveling west to east along Zhongshan Road in Danyang City, Zhenjiang. When the car reached the west side of the People's Bridge on the road, Zhang suddenly sneezed, causing the direction to lose control and deviate to the right, crashing into the bridge guardrail. Fortunately, due to the slow speed, the car did not fall under the bridge and did not cause any casualties.
Since November 2017, villagers in Sanmei Village, Hongmei Town, Nan'an City have been hearing this sound every day, even on rainy days.
Originally, the Party Committee of Hongmei Town raised 18 million yuan from multiple sources to implement the bridge renovation project of Nan'an Hongmei Embankment section of Jinjiang Flood Control Project. This sound came from the construction site of Subacai Bridge in Sanmei Village.
On the 10th, the reporter arrived at the construction site of Suba Caiqiao in Sanmei Village and saw that the punching pile was in operation, and four workers were discussing the project nearby.
The on-site manager Wang Linxian told reporters that they started construction on November 4, 2017 and have completed the construction of 11 foundation piles so far. Now we are working on the last pile, and in order to make the new bridge more solid, each pile is driven about 20 meters underground
It has been raining continuously these days, and we haven't stopped working. Four workers are stationed on site, working from 6am to 12pm, "said Wang Linxian.
At this moment, Chen Yaxu, a villager from Sanmei Village, was planning to drive across the bridge. He told reporters that this bridge has been built for a long time and is a necessary route for the villagers of Sanmei Village to travel. Last year, due to the impact of a typhoon, the water volume of Meixi surged, and the stream directly overflowed the bridge, blocking the passage of villagers
Wang Linxian on the side said that such a situation will never happen again in the future. The old bridge is 6 meters wide and about 15 meters long. After reconstruction, the entire bridge will be about 85 meters long and 9 meters wide, and will be raised by about 1 meter
After that, I won't be afraid of floods anymore, and my driving space will be spacious, "Chen Yaxu said with a smile.
When can the new bridge be repaired? "Asked Grandma Yao Jinzhu, who was watching nearby.
We have made a plan and aim to complete it before the Spring Festival, "said Wang Linxian.
double rainbow FYT-2Bridge deck waterproof coating SH-115
Product Manual
1、 Product Introduction
This product is a water-based coating based on petroleum asphalt, emulsified and modified with various special polymer materials. It can effectively prevent water infiltration and has strong adhesion with concrete, masonry, mortar plastering, etc. It is integrated with the substrate to achieve good waterproof effect.
2、 Product Details
Product Name: Double Rainbow FYT-2 Bridge Deck Waterproof Coating
Product Model SH-115
Product form: single component, brown black liquid slurry
Execute standard JC/T975-2005
3、 Product advantages
1. The waterproof layer has fast film formation, good waterproof effect, and low price.
2. The construction process is simple, and it can be manually painted or mechanically sprayed. Both construction methods can achieve the same effect.
3. The waterproof layer has strong adhesion and shear resistance.
4. High temperature resistance, corrosion resistance, aging resistance, and long service life.
4、 Scope of application
The product is specifically designed for waterproofing engineering of roads and bridges, and is also suitable for waterproofing of building roofs, underground, and tunnel projects.
5、 Construction technology
1. Base preparation
(1) The substrate must be sturdy, flat, clean, and free of dust, grease, wax, release agents, and other debris;
(2) All small pores and sand holes can be sealed by adding a little water to the sealing king and mixing it into a wet ball shape, then smoothing it out;
(3) Before applying the slurry, the substrate can be pre wetted, but there should be no accumulated water.
2. Grassroots treatment: The newly constructed concrete shall reach the design strength, and the surface temperature cracks and natural shrinkage cracks shall be basically completed. The surface of the base shall be free of floating dust, dirt, grease, accumulated water, etc., and shall be clean and dry.
3. The construction must have complete equipment and good performance.
4. Mix the paint evenly before application, and maintain intermittent mixing during construction to prevent sedimentation.
5. Before applying a large area of paint, use a small brush to apply 2-3 coats on the treated substrate, and then apply a large area of paint. Generally, it takes 3-6 hours (but not more than 24 hours) depending on the temperature. After the paint is dry, apply the second and third coats until the desired thickness is achieved.
VI Precautions
1. This product is suitable for use in an environment between 5 ℃ and 35 ℃. During the construction process, it must be protected from rain, hot sunlight, and frost.
2. If there is precipitation, it does not affect the quality. Stir well and it can be used normally.
3. Material storage: High temperature exposure is strictly prohibited. If the bucket lid is opened, it should be sealed immediately after use; Pay attention to antifreeze at 0 ℃.
7、 Reference dosage
When the dry film thickness of waterproof membrane is 1mm, the dosage is 1.9kg/m2, and the coating thickness of bridge deck is generally around 0.5mm-0.7mm, with a dosage of 1.0-1.5kg/㎡. The actual dosage depends on the specific substrate conditions.
8、 Shelf life:
Under normal storage and transportation conditions, the shelf life is one year.
9、 Packaging specifications:
1. Product specifications
50L single component slurry
2. Packaging materials
The outer packaging is in plastic drums.

AfterSalesService :
Key words:- FYT bridge deck waterproof coating
More Products