Asphalt pavement repair cold asphalt/cold patching material/repair concrete/Shunyi factory delivery
Asphalt pavement repair cold asphalt/cold patching material/repair concrete/Shunyi factory delivery

Asphalt pavement repair cold asphalt/cold patching material/repair concrete/Shunyi factory delivery

Category:

fine chemicals /Fine Chemicals for Construction/Other building additives

Model:

MR-100

Brand:

Haiyan Xingye

model:

MR-100

Main ingredients:

asphalt

color:

black

odor:

none

density:

tall

water-soluble:

good

Minimum operating temperature:

-30

Maximum operating temperature:

forty

shelf life:

12 months

Packing Specification:

25kg

manufacturer:

Beijing Shunyi

Retail Price

1,200.00USD


重量

kg

  • Product Description
  • model

    MR-100

    Main ingredients

    asphalt

    color

    black

    odor

    none

    density

    tall

    water-soluble

    good

    Minimum operating temperature

    -30

    Maximum operating temperature

    forty

    shelf life

    12 months

    Packing Specification

    25kg

    manufacturer

    Beijing Shunyi

    Description :

      Discounted quotation for filling the cold oil asphalt production base around the manhole cover

      Road repair cold oil asphalt factory appointment for delivery

      Recommended Asphalt Cold Oil (Small Particle Asphalt) Factory for Thermal Pipeline Repair in Shunyi District

      Haidian District Heating Pipeline Filling Cold Oil Asphalt Same City Quotation

      Changping District Hot Repair Cold Supplement Factory offers discounts for large orders

      Cold oil asphalt - Hot oil asphalt - Grey black concrete - Repair mortar - Early strength concrete - Steel fiber concrete - Second ash reinforced pavement - Bottom oil - Asphalt oil

      Repair concrete, early strength black gray concrete, asphalt cold patching material, hot oil asphalt, gray black concrete, repair mortar, reinforcement mortar, customers choose products according to their needs.

      The construction process is as follows:

      1. Slotting: chiseling and cleaning the edge of the manhole cover, asphalt and concrete

      2. 2. Cleaning: Clean the pits and trenches, ensure there are no debris or accumulated water, and compact the ground base layer

      3. Filler: Remove the bag of asphalt cold patch and pour it in, spread it evenly, and the height of the filler should be slightly 1.2-1.5cm above the ground.

      (Five centimeters thick, compacted once, ten centimeters thick, compacted twice)

      4. Compaction: Use flat vibrating compaction tools or small rollers for thorough compaction.

      5. Clean up the site and open up traffic.

    AfterSalesService :

    Key words:
    • Daxing cold replenishment material