Remote meter reading system terminal, GPRS energy metering, vortex flowmeter management principle
Remote meter reading system terminal, GPRS energy metering, vortex flowmeter management principle

Remote meter reading system terminal, GPRS energy metering, vortex flowmeter management principle

Category:

Instrumentation/Flow meter/flowmeter

Model:

STR/WEB/V2.0

Brand:

Qingdao Zhiyuan Instrument

model:

STR/WEB/V2.0

principle:

ultrasonic flowmeter

purpose:

Corrosion resistant flowmeter

Nominal Diameter:

DN15-2000

work pressure:

1.6MPa

Applicable Medium:

Gas, liquid, steam

Operating Temperature:

three hundred

measurement range:

one hundred and sixty-seven

accuracy class:

one

measurement accuracy:

one

Installation type:

flange connection

flow range:

four thousand and fifty-five

Processing & Customization:

yes

weight:

ninety-six

Place of Origin:

Qingdao, China

manufacturer:

Qingdao Zhiyuan Instrument

Retail Price

3,270.00USD


重量

kg

  • Product Description
  • model

    STR/WEB/V2.0

    principle

    ultrasonic flowmeter

    purpose

    Corrosion resistant flowmeter

    Nominal Diameter

    DN15-2000

    work pressure

    1.6MPa

    Applicable Medium

    Gas, liquid, steam

    Operating Temperature

    three hundred

    measurement range

    one hundred and sixty-seven

    accuracy class

    one

    measurement accuracy

    one

    Installation type

    flange connection

    flow range

    four thousand and fifty-five

    Processing & Customization

    yes

    weight

    ninety-six

    Place of Origin

    Qingdao, China

    manufacturer

    Qingdao Zhiyuan Instrument

    Description :

    Qingdao Zhiyuan InstrumentRemote meter reading system terminal, GPRS energy metering, vortex flowmeter management principleFeatures: 1. Based on GPRS or CDMA wireless networks, large-scale pipeline operation status monitoring is achieved, saving users expensive network construction and maintenance costs, high real-time performance, and low networking costs; 2. Rich and authentic monitoring information, fast system response speed; 3. Large capacity database, no worries about storing historical data; 4. Multiple sub centers support GPRS access for convenient user management; 5. Highly reliable industrial grade design, easy to maintain; 6. Significant economic and social benefits, with low operating costs; 7. System Scalability: The system should have powerful expansion capabilities, allowing for the addition of users at any time, including hard copy functionality, report printing functionality, and computing tool functionality.

      Qingdao Hesheng Zhiyuan Automation System Co., LtdRemote meter reading system terminal, GPRS energy metering, vortex flowmeter management principleMeaning: In the context of vigorously building a smart city and promoting the development of "Internet plus" smart energy, the concept of smart heating came into being as an important branch of the energy industry. existingSmart heating network for thermal power plantsThere are still some issues during operation, such as insufficient remote points, relatively outdated control technology, high energy consumption, and low energy metering. Urban heating belongs to the main content of energy conservation and emission reduction. The development of contemporary heating systems must effectively combine traditional engineering with modern data science and technology, and improve the effectiveness of energy efficiency management by predicting the operation status of the heating network. The design of heating systems is often driven by demand, and predicting the demand for heat load on the consumer side plays a crucial role in improving the overall efficiency of the heating network operation.

    Qingdao Hesheng Zhiyuan Automation System Co., Ltd. Remote Meter Reading System TerminalMeasurement software follows standards:

      Specification for Computer Software Quality Assurance Plan GB/T12505

      General Technical Specifications for Microcontrollers GB/T9813-2000

      GB 4728.1-85 "Symbols for Electrical Diagrams"

      Standard for Intelligent Flow Display Instrument JJG1003-2016

      Vortex Flow Meter JB/T9249-2015

      Verification Regulations for Vortex Flowmeters JJG1029-2007

      Verification Regulations for Differential Pressure Flowmeters JJG640-2016

      Differential Pressure Flow Meter GB/T2624-2006

    Remote meter reading system terminal, GPRS energy metering, vortex flowmeter management principlePrepaid function

      Prepaid function, divided into automatic mode and manual mode. Automatic mode: The valve with a remaining capacity is open, and the valve with a remaining capacity of 0 is closed; Manual mode: The valve opening can be adjusted with or without a margin, but when there is no margin, the valve can be manually opened, and the negative value of the margin will be automatically deducted after resetting.

      Recharge requires 2 people to complete. After the personnel submit the recharge request and confirm its accuracy, they will review and approve it on their own. If there are any errors, the recharge will be rejected; If the personnel confirm that their recharge is correct and approved, then the recharge is successful; If the confirmation is incorrect, the recharge will be rejected. After successful recharge, the recharge information will be sent to the customer via duanxin.

      For incorrect recharge, if the recharge has been successful, you can operate the red flush setting to clear the recharge. The recharge of -6 in the picture is the red flush setting.

      Settlement reports can be generated based on custom time periods

      Rate modification function to meet the demand for adjusting gas source prices in different periods;

      Qingdao Hesheng Zhiyuan Automation System Co., Ltd

      189 Hui Xin 5483 Same number 1481

      Q:3438-5007-67

    AfterSalesService :

    Key words:
    • Remote meter reading system terminal