Steam prepayment control platform, energy charging of thermal companies, application of steam prepayment system
Steam prepayment control platform, energy charging of thermal companies, application of steam prepayment system

Steam prepayment control platform, energy charging of thermal companies, application of steam prepayment system

Category:

Instrumentation/Flow meter/flowmeter

Model:

STR/WEB/V2.0

Brand:

Qingdao Zhiyuan Instrument

model:

STR/WEB/V2.0

principle:

Fluid oscillating flowmeter

purpose:

Multiphase flowmeter

Nominal Diameter:

DN15-2000

work pressure:

1.6MPa

Applicable Medium:

Gas, liquid, steam

Operating Temperature:

three hundred

measurement range:

nine thousand six hundred and fifty-three

accuracy class:

one

measurement accuracy:

one

Installation type:

flange connection

flow range:

six thousand eight hundred and twenty

Processing & Customization:

yes

weight:

fourteen

Place of Origin:

Qingdao, China

manufacturer:

Qingdao Zhiyuan Instrument

Retail Price

6,036.00USD


重量

kg

  • Product Description
  • model

    STR/WEB/V2.0

    principle

    Fluid oscillating flowmeter

    purpose

    Multiphase flowmeter

    Nominal Diameter

    DN15-2000

    work pressure

    1.6MPa

    Applicable Medium

    Gas, liquid, steam

    Operating Temperature

    three hundred

    measurement range

    nine thousand six hundred and fifty-three

    accuracy class

    one

    measurement accuracy

    one

    Installation type

    flange connection

    flow range

    six thousand eight hundred and twenty

    Processing & Customization

    yes

    weight

    fourteen

    Place of Origin

    Qingdao, China

    manufacturer

    Qingdao Zhiyuan Instrument

    Description :

    At present, most heating companies supply steam first and then settle monthly when selling steam, but this may result in some user units defaulting on steam payments, causing inconvenience to heating companies. The steam IC card prepayment control system developed by Qingdao Hesheng Company can effectively eliminate the above-mentioned problems. The steam users of this system must pay in advance and recharge before opening the valve to use steam. They must also renew and recharge before the balance is exhausted. When the balance is insufficient, local and remote notifications will be sent to remind users to pay in a timely manner. If the balance is not renewed in time, the system will automatically close the valve and stop steam when the balance is zero, eliminating the phenomenon of overdue payment by the steam users. combineSteam prepayment control platformReal time customer gas usage status, the system control box has unboxing and disconnection reports. Once a customer opens the metering box or system control box without authorization, the data will be immediately transmitted to the control center to remind the staff of the time, and the electric valve will be remotely controlled to close and stop the steam supply, which will have a deterrent effect on malicious behavior by users.

    Qingdao Hesheng Zhiyuan Automation System Co., Ltd. Steam Prepaid Control PlatformMeasurement software follows standards:

      Specification for Computer Software Quality Assurance Plan GB/T12505

      General Technical Specifications for Microcontrollers GB/T9813-2000

      GB 4728.1-85 "Symbols for Electrical Diagrams"

      Standard for Intelligent Flow Display Instrument JJG1003-2016

      Vortex Flow Meter JB/T9249-2015

      Verification Regulations for Vortex Flowmeters JJG1029-2007

      Verification Regulations for Differential Pressure Flowmeters JJG640-2016

      Differential Pressure Flow Meter GB/T2624-2006

      With the trend of informationization and intelligence development in the heating network, the existing heating network collection system is no longer suitable for new intelligent management requirements. It is necessary to upgrade and add functions to the existing hardware and software systems to build a smart heating network management system.Steam prepayment control platformAt present, there are many technologies used for meter reading in China, such as manual meter reading, RS485 bus, infrared and wireless data remote transmission, etc. Among them, GPRS wireless data remote transmission and RS485 bus meter reading technologies are relatively mature and widely adopted. The values of various measuring devices are mostly manually read by operators on a shift by shift basis. This simple and repetitive work inevitably brings some problems, such as unsynchronized meter reading, large human errors, and high labor intensity. Manual meter reading has become an obstacle to the automation and informatization of data management in power plants. Therefore, the application of RS485 wired data remote meter reading system is necessary. The system security permission setting function provides complete security authentication, and users cannot enter the system. Legal users can perform corresponding operations according to their permissions

      Qingdao Zhiyuan InstrumentSteam prepayment control platformService commitment:

      From the date of delivery of the heating network system, it enters the after-sales service period. The after-sales service period includes a free warranty period and a quality maintenance period.

      Free warranty period: Within 12 months from the date of normal use of the product or system, it is a free warranty period. During the free warranty period, any quality issues within the warranty scope will be repaired and replaced by Party B free of charge.

      Quality maintenance period: After the quality assurance period, we will continue to provide lifetime preferential services. The maintenance services carried out during the quality maintenance period will be charged material and labor costs based on the spare parts product price (not higher than the contract price) and maintenance situation set by the company.

      The specific service items during the after-sales service period are as follows: receiving letters from users, providing responses or handling suggestions within 24 hours, and ensuring user satisfaction. And store the corresponding information in the user maintenance record sheet.

    Steam prepayment control platform, energy charging of thermal companies, application of steam prepayment systemAutomatic fault reporting function: The monitoring point automatically reports the fault information to the monitoring center and prints the report information automatically. The faults detected automatically include communication failures of flow meters, 220V AC power outages, IC card failures, etc. In the late 1980s and early 1990s, pilot work on automated meter reading systems began. Various power supply enterprises across the country have basically established wireless power load control systems. Although their main construction purpose is to control loads, they are gradually being used for reading electricity meters for large users

      Qingdao Hesheng Zhiyuan Automation System Co., Ltd

      189 Hui Xin 5483 Same number 1481

      Q:3438-5007-67

    AfterSalesService :

    Key words:
    • Steam prepayment control platform