Prepaid management in industrial parks, vortex flowmeter metering and charging, hot water prepayment system method
Category:
Instrumentation/Flow meter/flowmeter
Model:
STR/WEB/V2.0
Brand:
Qingdao Zhiyuan Instrument
model:
STR/WEB/V2.0
principle:
Impeller flowmeter
purpose:
steam flow meter
Nominal Diameter:
DN15-2000
work pressure:
1.6MPa
Applicable Medium:
Gas, liquid, steam
Operating Temperature:
three hundred
measurement range:
nine thousand one hundred and sixty-eight
accuracy class:
one
measurement accuracy:
one
Installation type:
flange connection
flow range:
three thousand and fifty-four
Processing & Customization:
yes
weight:
twenty-two
Place of Origin:
Qingdao, China
manufacturer:
Qingdao Zhiyuan Instrument
Retail Price
2,270.00USD
重量
kg
- Product Description
-
model STR/WEB/V2.0
principle Impeller flowmeter
purpose steam flow meter
Nominal Diameter DN15-2000
work pressure 1.6MPa
Applicable Medium Gas, liquid, steam
Operating Temperature three hundred
measurement range nine thousand one hundred and sixty-eight
accuracy class one
measurement accuracy one
Installation type flange connection
flow range three thousand and fifty-four
Processing & Customization yes
weight twenty-two
Place of Origin Qingdao, China
manufacturer Qingdao Zhiyuan Instrument
Description :


Qingdao Hesheng Zhiyuan Automation System Co., LtdPrepaid management of industrial parksEquipped with RS232/RS485 standard communication interface and MODBUS RTU, MODBUS ASC Ⅱ industrial standard communication protocol, it can communicate with intelligent flow meters, read various measurement parameters and working parameters in intelligent flow meters.
1. The device has automatic dialing and disconnection redialing functions. When the network condition is unstable, it has the ability to automatically restore communication, ensuring stable system operation without human intervention; When the signal in the area is weak, the module can communicate normally by changing the signal reception and transmission strength of the module.
2. Online query function can be achieved through the Internet, and users only need to provide their username and password. The real-time online query function can be completed.
3. Equipped with data cable and 12VDC power supply.Prepaid management in industrial parks, vortex flowmeter metering and charging, hot water prepayment system methodThe operation of the equipment and the modification of parameters must be carried out with a device card inserted, which is more reliable than password protection. It provides necessary means for scientific scheduling and management of enterprises such as water supply, steam supply, heating, tap water, gas, etc; And the application of this meter reading system will reduce the difficulty of meter reading work, improve work efficiency, and continuously reduce the cost of meter reading and charging
Due to the relatively dispersed geographical distribution of various automobile enterprises and outdated means of measuring data collection and transmission, manual reading is adopted, with a reading frequency of once a day. This mode results in poor real-time performance of steam metering data, with only one data per day, which is not conducive to data analysis; After instrument malfunctions or unexpected power outages are not detected in a timely manner, they can only be discovered during inspections or meter readings, and the exact time of the malfunction cannot be determined, resulting in delayed maintenance and management. Some companies, for their own interests, manipulate on-site instruments or display devices, which is not conducive to timely problem detection and analysis. This leads to significant discrepancies between the export summary table of the thermal power company and the sub meters of various gas consuming enterprises, resulting in occasional metering and other situations at the end of the month settlement. Qingdao HeshengPrepaid management in industrial parks, vortex flowmeter metering and charging, hot water prepayment system methodReal time dynamic monitoring and management of gas users can be achieved. Provide a more timely data foundation and support platform for steam metering management work.
Qingdao Hesheng Zhiyuan Automation System Co., LtdPrepaid management in industrial parks, vortex flowmeter metering and charging, hot water prepayment system methodTechnical specifications for measuring instrument stations: The measuring station is installed in the factory of the steam unit, with one set per unit, including intelligent flow integrator, 4G module, antenna, data cable, unboxing equipment, DC backup power supply (UPS), wall mounted instrument box, and power distribution system. All devices should have replaceability and universality. The above devices need to be integrated into one chassis, and the connections between devices have been integrated and debugged as a whole before leaving the factory; Protection level IP65. Adopt protective measures such as pressure-sensitive and TVS to deal with and solve potential accidents such as voltage fluctuations, vibrations, electromagnetics, and lightning strikes in the power grid.
Prepaid management in industrial parks, vortex flowmeter metering and charging, hot water prepayment system methodOperation and maintenance management: 1. Establish equipment ledger, record and provide equipment information, reflect the basic parameters, operation and maintenance history of equipment, provide necessary information for daily maintenance and management of equipment, and analyze and manage equipment life and inspection cycle based on the online operation status and equipment ledger of equipment. 2. The equipment ledger should include: basic equipment information, equipment technical specifications, equipment defect records, measurement equipment inspection records, equipment changes, equipment spare parts, equipment ledger queries, and other functions. 3. The seamless integration of equipment ledger and real-time system enables the static and dynamic information of online devices. 4. Defect management includes: defect registration through the inspection system, defect information flow (upgrading, downgrading, forwarding, extension, etc.), defect information statistics, etc; The processed defects are automatically archived in the corresponding equipment ledger, and the phenomena, causes, and defect elimination measures of the faults during the defect handling process can be archived in the equipment fault library. 5. The responsible department and person for defect review and handling can be defined in the system, and the reported defect information will be automatically transmitted to the department for personnel to verify the defects. For confirmed defects, a defect elimination process can be generated for processing.
6. Smart heating network metering system IC card prepaid system composition: prepaid control box; Explosion proof (explosion-proof) electric control valve; Card reader/writer (including recharge software); Items 1, 2, and 3 are installed at the on-site measurement point, while item 3 is installed on the office computer of the management personnel. Active testing function: that is, data from monitoring points can be actively extracted at any time from the server in the dispatch center
Qingdao Hesheng Zhiyuan Automation System Co., Ltd
189 Hui Xin 5483 Same number 1481
Q:3438-5007-67
AfterSalesService :
Key words:- Prepaid management of industrial parks
More Products