Smart heating system, energy consumption management of thermal power plants, smart heating network mode of power plants
Smart heating system, energy consumption management of thermal power plants, smart heating network mode of power plants

Smart heating system, energy consumption management of thermal power plants, smart heating network mode of power plants

Category:

Instrumentation/Flow meter/flowmeter

Model:

STR/WEB/V2.0

Brand:

Qingdao Zhiyuan Instrument

model:

STR/WEB/V2.0

principle:

Differential pressure flowmeter

purpose:

Micro flow flowmeter

Nominal Diameter:

DN15-2000

work pressure:

1.6MPa

Applicable Medium:

Gas, liquid, steam

Operating Temperature:

three hundred

measurement range:

five hundred and seventy-six

accuracy class:

one

measurement accuracy:

one

Installation type:

flange connection

flow range:

seven thousand seven hundred and forty-three

Processing & Customization:

yes

weight:

sixteen

Place of Origin:

Qingdao, China

manufacturer:

Qingdao Zhiyuan Instrument

Retail Price

3,679.00USD


重量

kg

  • Product Description
  • model

    STR/WEB/V2.0

    principle

    Differential pressure flowmeter

    purpose

    Micro flow flowmeter

    Nominal Diameter

    DN15-2000

    work pressure

    1.6MPa

    Applicable Medium

    Gas, liquid, steam

    Operating Temperature

    three hundred

    measurement range

    five hundred and seventy-six

    accuracy class

    one

    measurement accuracy

    one

    Installation type

    flange connection

    flow range

    seven thousand seven hundred and forty-three

    Processing & Customization

    yes

    weight

    sixteen

    Place of Origin

    Qingdao, China

    manufacturer

    Qingdao Zhiyuan Instrument

    Description :

    Qingdao Hesheng Zhiyuan Automation System Co., LtdSmart heating system, energy consumption management of thermal power plants, smart heating network mode of power plantstrain:

      1. On site training: During the implementation of the project, the client must assign technical personnel to participate in the construction and operation debugging of the project. Our company's engineering and technical personnel will provide on-site guidance and practical training for your company's personnel during implementation, ensuring that the progress of the project is synchronized with personnel training. Before the system trial run, we will provide system training to the customer. Through training, the customer's operational staff will understand the basic principles and learn system operation and maintenance, including a basic understanding of the software and hardware systems of this project. The training content is as follows: a. Basic knowledge and system configuration of the system, b. Courses on system installation, inspection, troubleshooting, online coordination and maintenance, and application training of human-machine interface. 2. Factory training: Our company conducts regular training for technical personnel of users who use our products every year. At that time, we will provide in-depth explanations of the company's software, hardware, and heating network technology, and conduct on-site practice according to the conditions. At the same time, we will answer any questions that users may have in various systems.

      3Smart heating systemThe traditional meter reading method adopts a pure manual reading mode in the process of reading the meter, and the final measurement cost result is also manual in the later stage. The GPRS wireless data remote meter reading system is designed and developed by our company to solve the above problems. It ensures the safe operation of the heating network system, facilitates the reasonable allocation of energy, is economical and practical, and can detect problems in a timely manner to reduce losses. The phenomenon of "confusion of steam (water)" has taken the management of the heating network to a higher level, achieving the goal of seeking benefits from management

      Qingdao Hesheng Zhiyuan Automation System Co., LtdSmart heating system, energy consumption management of thermal power plants, smart heating network mode of power plantsDesign principle:

      1. The operator workstation in the center adopts a B/S structure, supporting remote access to intelligent and other intelligent terminals (with internet access). Using the above technologies, modular and structured application software suitable for the actual needs of this project is developed, making the system more adaptable to the increase in functionality and scale expansion; The software adopts a mature standardized Chinese system, with a user-friendly interface and easy operation. The displayed images and printed files are clear and eye-catching.

      2. The system has high reliability, strong resistance, high availability, and good maintainability.

      3. The introduction of smart heating network products is highly reliable and will not affect the normal operation of on-site measuring equipment due to local faults.

      4. The measurement system software includes four major parts: computer operating system software, database software, tool software, and application software. The application software is based on the JA framework and adopts a modular (functional module) structure, with high development efficiency, easy maintenance, and strong flexibility, allowing end users to truly open up without writing statement instruction programs.

    Smart heating system, energy consumption management of thermal power plants, smart heating network mode of power plantsPrepaid function

      Prepaid function, divided into automatic mode and manual mode. Automatic mode: The valve with a remaining capacity is open, and the valve with a remaining capacity of 0 is closed; Manual mode: The valve opening can be adjusted with or without a margin, but when there is no margin, the valve can be manually opened, and the negative value of the margin will be automatically deducted after resetting.

      Recharge requires 2 people to complete. After the personnel submit the recharge request and confirm its accuracy, they will review and approve it on their own. If there are any errors, the recharge will be rejected; If the personnel confirm that their recharge is correct and approved, then the recharge is successful; If the confirmation is incorrect, the recharge will be rejected. After successful recharge, the recharge information will be sent to the customer via duanxin.

      For incorrect recharge, if the recharge has been successful, you can operate the red flush setting to clear the recharge. The recharge of -6 in the picture is the red flush setting.

      Settlement reports can be generated based on custom time periods

      Rate modification function to meet the demand for adjusting gas source prices in different periods;

    Smart heating system, energy consumption management of thermal power plants, smart heating network mode of power plantsMore and more attention is being paid to heating enterprises. By using remote monitoring to track the entire heating network pipeline and instruments, not only can the heating status of the entire heating network pipeline be grasped, but also the instrument fault report information can be quickly and accurately reflected, making it convenient for maintenance personnel to check and repair in a timely manner. This not only saves a lot of manpower and material resources, but also improves the modern management level of the heating network. If the remote network is complete, the meter reading personnel can also serve as personnel. If any problems are found in the room, they can go to check at any time to reduce the possibility of gas theft and create a deterrent effect on users, so that they do not want to steal gas, thereby reducing the losses of the gas supply enterprise.

      Qingdao Hesheng Zhiyuan Automation System Co., Ltd

      189 Hui Xin 5483 Same number 1481

      Q:3438-5007-67

    AfterSalesService :

    Key words:
    • Smart heating system