Smart heating operation and maintenance, pre charging system for heating network, energy consumption management company for heating stations
Smart heating operation and maintenance, pre charging system for heating network, energy consumption management company for heating stations

Smart heating operation and maintenance, pre charging system for heating network, energy consumption management company for heating stations

Category:

Instrumentation/Flow meter/flowmeter

Model:

STR/WEB/V2.0

Brand:

Qingdao Zhiyuan Instrument

model:

STR/WEB/V2.0

principle:

Differential pressure flowmeter

purpose:

Corrosion resistant flowmeter

Nominal Diameter:

DN15-2000

work pressure:

1.6MPa

Applicable Medium:

Gas, liquid, steam

Operating Temperature:

three hundred

measurement range:

two thousand six hundred and twenty-six

accuracy class:

one

measurement accuracy:

one

Installation type:

flange connection

flow range:

six thousand five hundred and thirteen

Processing & Customization:

yes

weight:

ninety-one

Place of Origin:

Qingdao, China

manufacturer:

Qingdao Zhiyuan Instrument

Retail Price

4,931.00USD


重量

kg

  • Product Description
  • model

    STR/WEB/V2.0

    principle

    Differential pressure flowmeter

    purpose

    Corrosion resistant flowmeter

    Nominal Diameter

    DN15-2000

    work pressure

    1.6MPa

    Applicable Medium

    Gas, liquid, steam

    Operating Temperature

    three hundred

    measurement range

    two thousand six hundred and twenty-six

    accuracy class

    one

    measurement accuracy

    one

    Installation type

    flange connection

    flow range

    six thousand five hundred and thirteen

    Processing & Customization

    yes

    weight

    ninety-one

    Place of Origin

    Qingdao, China

    manufacturer

    Qingdao Zhiyuan Instrument

    Description :

    The STR/WEB/V2.0 smart heating network centralized heating has the advantages of heat, energy saving, and low pollution, and is also a major energy-saving and environmental protection measure under the construction of green mountains and clear waters. With the increasing scope of heating, longer pipelines, and more heat users, higher requirements have been put forward for the heating management system. In response to the constantly evolving market demand, Qingdao Hesheng Company has analyzed and researched key pain points, continuously optimized and improved, and provided higher-level and more adaptable smart heating network solutions, contributing to the safety and economic operation of the heating network. Intelligent heating operation and maintenance open database design: supports user-defined monitoring station expansion and monitoring sensor expansion. To meet the needs of the continuous development of enterprises, its main functions are as follows: file management function (1) operator file: establish login username and password, and grant corresponding operation permissions. (2) Terminal profile: Information parameters for registering a terminal. (3) Meter file: Register the information of all meters, and in the management room, use the network browsing function to have a clear view of the entire system. It can achieve 24-hour operation of the heating network. All physical quantity data in the system is displayed on the screen, and users are informed of the parameters of steam and pipeline operation. In the event of a fault, it can*

      As a new generation of energy supply model,Smart heating operation and maintenance, pre charging system for heating network, energy consumption management company for heating stationsIt is a powerful supplement to centralized energy supply systems. With the development of economy and technology, especially the active application of renewable energy, users' energy demands have begun to diversify; With the development and maturity of different energy technologies, there are increasingly more technologies to choose from. Distributed energy systems, as an open energy system, are showing a trend towards multifunctionality, including multiple energy inputs and meeting multiple energy needs of users simultaneously. People's concepts are constantly changing, and new requirements are constantly being put forward for the energy system (reliability, economy, environmental protection, sustainable development, etc.). The new energy consumption management of Qingdao Zhiyuan Instrument Heating Station can better meet these requirements and achieve multiple functional goals by selecting appropriate technologies, optimizing and integrating the system. The wired data collection system is based on the RS485 bus. The RS485 wired data remote meter reading system is a system that uses modern communication and computer network technology to automatically collect remote data. Query and statistics: It can query and display data for each instrument at any time period within a certain period of time, making it easy to assess and query each shift. The GPRS wireless data remote meter reading system was designed and developed by our company to solve the above problems. It ensures the safe operation of the heating network system, facilitates the rational allocation of energy, is economical and practical, and can timely detect problems, reduce losses. The phenomenon of "confused steam (water)" has taken the management of the heating network to a higher level, achieving the goal of seeking benefits from management

      Qingdao Zhiyuan InstrumentSmart heating operation and maintenanceService commitment:

      From the date of delivery of the heating network system, it enters the after-sales service period. The after-sales service period includes a free warranty period and a quality maintenance period.

      Free warranty period: Within 12 months from the date of normal use of the product or system, it is a free warranty period. During the free warranty period, any quality issues within the warranty scope will be repaired and replaced by Party B free of charge.

      Quality maintenance period: After the quality period, we will continue to provide lifetime preferential services. The maintenance services carried out during the quality maintenance period will be charged material and labor costs based on the spare parts product price (not higher than the contract price) and maintenance situation set by the company.

      The specific service items during the after-sales service period are as follows: receiving letters from users, providing responses or handling suggestions within 24 hours, and ensuring user satisfaction. And store the corresponding information in the user maintenance record sheet.

    Smart heating operation and maintenance, pre charging system for heating network, energy consumption management company for heating stationsThe continuous acceleration of urbanization has led to a growing user base for projects that benefit people's livelihoods, such as water, electricity, and gas. At the same time, how to charge for these projects has become an urgent problem to be solved. After the emergence of intelligent meter reading systems, the problem of hot water and steam billing has been solved. The open database design supports user-defined monitoring station expansion and monitoring sensor expansion. Adapt to the continuous development needs of enterprises

      Distributed energy management system is relative to traditional centralized energy supply systems. Traditional centralized energy supply systems use large capacity equipment, centralized production, and then transmit various types of energy to numerous users over a large area through door transmission facilities (such as large power grids, large heat grids, etc.); Distributed energy systems, on the other hand, are small and medium-sized energy conversion and utilization systems that directly face users, produce and supply energy on-site according to their needs, have multiple functions, and can meet multiple objectives.Smart heating operation and maintenanceAt present, the values of various measuring devices are mostly manually reported by operators on a shift by shift basis. This simple and repetitive work inevitably brings some problems, such as unsynchronized meter reading, large human error, and high labor intensity. Manual meter reading has become an obstacle to the automation and informatization of data management in power plants. Therefore, the application of RS485 wired data remote meter reading system is necessary. The permissions of the sub centers are limited to data monitoring and are not allowed to operate downwards. For the security of the system, the data of each sub center in the main center is fully synchronized and displayed in real time

      Qingdao Hesheng Zhiyuan Automation System Co., Ltd

      189 Hui Xin 5483 Same number 1481

      Q:3438-5007-67

    AfterSalesService :

    Key words:
    • Smart heating operation and maintenance