Mianyang Observation Standard Price Settlement Observation Standard Specification Full Settlement Observation Point Agent
Mianyang Observation Standard Price Settlement Observation Standard Specification Full Settlement Observation Point Agent

Mianyang Observation Standard Price Settlement Observation Standard Specification Full Settlement Observation Point Agent

Category:

metallurgy/Stainless steel material/Stainless steel bars

Model:

Brand:

Cangzhou Shuntian

grade:

Observation standard

cross-sectional shape:

round bar

surface treatment:

glossy surface

Processing Technology:

Forging

tensile strength:

370MPa~480MPa

Processing Service:

deep processing

execution standard:

National Standard

quality grade:

A-level

Processing & Customization:

yes

Is it imported:

No

weight:

one

Scope of application:

rail transit

delivery service:

Can be delivered to the factory

Type of goods sales:

spot

Item Number:

twenty thousand one hundred and twenty

warehouse address:

Cangzhou, Hebei

warehouse phone:

fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven

manufacturer:

Cangzhou Shuntian Steel Pipe Co., Ltd

Retail Price

6.00USD


重量

kg

  • Product Description
  • grade

    Observation standard

    cross-sectional shape

    round bar

    surface treatment

    glossy surface

    Processing Technology

    Forging

    tensile strength

    370MPa~480MPa

    Processing Service

    deep processing

    execution standard

    National Standard

    quality grade

    A-level

    Processing & Customization

    yes

    Is it imported

    No

    weight

    one

    Scope of application

    rail transit

    delivery service

    Can be delivered to the factory

    Type of goods sales

    spot

    Item Number

    twenty thousand one hundred and twenty

    warehouse address

    Cangzhou, Hebei

    warehouse phone

    fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven

    manufacturer

    Cangzhou Shuntian Steel Pipe Co., Ltd

    Description :

      The settlement point is reserved by the construction unit according to the requirements of the design drawings when the construction reaches positive or negative zero. Generally, after the steel reinforcement is tied, the box is put in first, and then the formwork is assembled and poured. Usually on the exterior walls of buildings. The height is generally between 1 meter and 2 meters. During the construction period, settlement is generally measured every three months. After completion acceptance, measurements shall be taken once every year. Settlement observation must be measured by qualified units. It mainly depends on whether the results of each measurement are within the allowable range, so as to determine whether the building is safe. The settlement observation points for product application should be securely set up and properly protected to prevent damage during construction.

      Settlement observation points should generally be located at the following positions: 1. At the four corners, large corners, and 10-15 meters along the exterior wall of the building, or every 2-3 column bases; 2. On both sides of the intersection of high and low rise buildings, old and new buildings, and vertical and horizontal walls; 3. On both sides of building cracks and settlement joints, at locations where there is a significant difference in foundation burial depth, at the boundary between artificial and natural foundations, at the boundary between different structures, and at the boundary between filling and excavation; 4. Set points on each or part of the column foundation of the frame structure building or along the longitudinal and transverse axes; 5. At the four corners and middle positions of raft foundation, box foundation bottom plate or structural parts close to the foundation; 6. For buildings with a width greater than or equal to 15m and complex geology or expansive soil areas, interior wall points shall be set in the middle of the load-bearing interior partition wall, and ground points shall be set in the center and surrounding areas of the indoor floor; 7. Adjacent stacking of heavy objects, vibration foundations, heavy equipment and power equipment foundations, etc. The observation period for general buildings can start after the foundation is completed or the basement is built, while for large and high-rise buildings, observation can start after the foundation cushion or foundation bottom is completed. The number of observations and interval time should depend on the foundation and loading conditions. Civil buildings can be observed once every 1-5 floors of height increase; Industrial buildings can be observed separately according to different construction stages, such as backfilling foundation pits, installing columns and roof trusses, masonry walls, equipment installation, etc. If the building is uniformly raised, it should be observed at least once when the load is increased by 25%, 50%, 75%, and 100%. If the construction process is temporarily suspended, observation should be conducted once during the suspension and once again during the resumption of work. If there is a sudden increase or decrease in ground load near the foundation, a large amount of water collection around the foundation, or prolonged continuous rainfall, the number of observations should be increased in a timely manner. When a building suddenly experiences significant settlement, uneven settlement, or severe cracks, continuous observations should be conducted immediately on a daily or daily basis. If the settlement is still unstable after the completion of the building, observation should continue during the use phase. Judgment of settlement stability: In general observation projects, if the settlement rate is less than 0.01-0.04mm/day, it can be considered that the settlement stability stage has been entered. Mianyang Observation Standard Price Settlement Observation Standard Specification Full Settlement Observation Point Agent

    AfterSalesService :

    Key words:
    • Mianyang Observation Standard