Quotation for settlement observation points from Wuzhou settlement observation standard supplier
Quotation for settlement observation points from Wuzhou settlement observation standard supplier

Quotation for settlement observation points from Wuzhou settlement observation standard supplier

Category:

metallurgy/Stainless steel material/Stainless steel bars

Model:

Brand:

Cangzhou Shuntian

grade:

Observation standard

cross-sectional shape:

round bar

surface treatment:

glossy surface

Processing Technology:

Forging

tensile strength:

370MPa~480MPa

Processing Service:

deep processing

execution standard:

National Standard

quality grade:

A-level

Processing & Customization:

yes

Is it imported:

No

weight:

one

Scope of application:

rail transit

delivery service:

Can be delivered to the factory

Type of goods sales:

spot

Item Number:

twenty thousand one hundred and twenty

warehouse address:

Cangzhou, Hebei

warehouse phone:

fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven

manufacturer:

Cangzhou Shuntian Steel Pipe Co., Ltd

Retail Price

12.00USD


重量

kg

  • Product Description
  • grade

    Observation standard

    cross-sectional shape

    round bar

    surface treatment

    glossy surface

    Processing Technology

    Forging

    tensile strength

    370MPa~480MPa

    Processing Service

    deep processing

    execution standard

    National Standard

    quality grade

    A-level

    Processing & Customization

    yes

    Is it imported

    No

    weight

    one

    Scope of application

    rail transit

    delivery service

    Can be delivered to the factory

    Type of goods sales

    spot

    Item Number

    twenty thousand one hundred and twenty

    warehouse address

    Cangzhou, Hebei

    warehouse phone

    fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven

    manufacturer

    Cangzhou Shuntian Steel Pipe Co., Ltd

    Description :

      The two most commonly used logos currently are L-shaped logos and concealed logos. The installation and observation of L-shaped signs are relatively simple. If the construction environment is relatively stable, it is recommended to recommend L-shaped signs, which are also convenient for later observation. However, they are prone to deformation and inaccurate measurement after being smashed; Concealed signs require the installation of measuring heads every time they are observed, but the advantage is that they are not easily damaged. The specific two types of symbol diagrams and introductions can refer to the embedded parts of the turning point and settlement observation point.Based on work experience, during the construction phase, the frequency of observation should be higher. Generally, the observation period is determined by 3 days, 7 days, or 15 days, or by increasing the number of layers and loads. The specific observation period should depend on the foundation and loading during the construction process. When temporarily suspending work, observation should be conducted once during the suspension and once again during the resumption of work to check the changes in building settlement during the suspension period. This serves as a basis for determining whether the method and frequency of settlement observation should be adjusted after resuming work. After completion, the frequency of observation can be reduced, depending on the type of foundation soil and the magnitude of settlement rate. Generally, there are different periods such as one month, two months, three months, six months, and one year. Whether the settlement has entered a stable stage should be determined by the relationship curve between settlement amount and time. For key observation and scientific research projects, if the settlement in each of the three observation cycles does not exceed twice the measurement error, it can be considered as entering the stable stage. For settlement observation in general engineering, if the settlement rate is less than 0.01-0.04mm/d, it can be considered as entering the stable stage, and the specific value should be determined according to the compressibility of the foundation soil in each region. According to the prepared settlement measurement plan and the determined observation period, observation should be carried out in a timely manner after the observation point is stable. Generally, high-rise buildings have one or several underground structures, and observation should start from the foundation. Settlement observation points (temporary) should be buried at the designed positions on the longitudinal and transverse axes of the foundation (foundation edge). Observation can only be carried out after the temporary observation points are stable. The elevation values of the settlement observation points observed are the basis for comparison in future observations, and their accuracy requirements are very high. N2 level precision leveling instruments are generally used for measurement, and each observation point elevation should be observed twice during the same period. Comparing the observation results, if the height difference between the same observation points does not exceed ± 0.5mm, we can consider the observed data to be reliable. As the structure rises one level, temporary observation points are moved up one level and observed until+0.00, and then observation points are buried according to regulations (for ease of observation, observation points can be set at+500mm). Then, every layer of construction is retested until completion.

    AfterSalesService :

    Key words:
    • Wuzhou subsidence observation mark