Anhui Mingguang Observation Standard Settlement Observation Nail Manufacturer Cangzhou Shuntian welcomes you to customize the observation standard
Category:
metallurgy/Stainless steel material/Stainless steel bars
Model:
Brand:
Cangzhou Shuntian
grade:
Observation standard
cross-sectional shape:
round bar
surface treatment:
glossy surface
Processing Technology:
Forging
tensile strength:
370MPa~480MPa
Processing Service:
deep processing
execution standard:
National Standard
quality grade:
A-level
Processing & Customization:
yes
Is it imported:
No
weight:
one
Scope of application:
rail transit
delivery service:
Can be delivered to the factory
Type of goods sales:
spot
Item Number:
twenty thousand one hundred and twenty
warehouse address:
Cangzhou, Hebei
warehouse phone:
fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven
manufacturer:
Cangzhou Shuntian Steel Pipe Co., Ltd
Retail Price
8.00USD
重量
kg
- Product Description
-
grade Observation standard
cross-sectional shape round bar
surface treatment glossy surface
Processing Technology Forging
tensile strength 370MPa~480MPa
Processing Service deep processing
execution standard National Standard
quality grade A-level
Processing & Customization yes
Is it imported No
weight one
Scope of application rail transit
delivery service Can be delivered to the factory
Type of goods sales spot
Item Number twenty thousand one hundred and twenty
warehouse address Cangzhou, Hebei
warehouse phone fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven
manufacturer Cangzhou Shuntian Steel Pipe Co., Ltd
Description :






When there is uneven settlement or severe cracking, continuous observation should be carried out immediately every day or several days. If the settlement is still unstable after the completion of the building, observation should continue during the use phase. Judgment of settlement stability: In general observation projects, if the settlement rate is less than 0.01-0.04mm/day, it can be considered that the settlement stability stage has been entered.
After the news came out, this locally popular community immediately exploded: "Those two buildings sank, may our building also have problems?" "The same construction company contracted this house, and I feel nervous living in it...
The original soil of the project where the community is located is collapsible loess. After years of ground load and rainstorm weather interference, the foundation began to subside, and the entire building also subsided unevenly.
In fact, many homeowners had noticed before the incident that their houses were more or less unable to close their doors, their bathwater was leaking out, and the elevator was already full with four or five people on board. However, due to a lack of understanding of issues related to foundation settlement, many people have not paid attention.
Half a month later, the project began construction on the issue of foundation settlement. It's too noisy to sleep, "some residents reported. Originally, a construction team was pouring and reinforcing the foundation, but due to the loud noise, it caused dissatisfaction among residents.
AfterSalesService :
Key words:- Anhui Mingguang Observation Standard
More Products