Huzhou sales observation standard L-type stainless steel settlement observation point in stock and now available for shipment
Huzhou sales observation standard L-type stainless steel settlement observation point in stock and now available for shipment

Huzhou sales observation standard L-type stainless steel settlement observation point in stock and now available for shipment

Category:

metallurgy/Stainless steel material/Stainless steel bars

Model:

Brand:

Cangzhou Shuntian

grade:

Observation standard

cross-sectional shape:

round bar

surface treatment:

glossy surface

Processing Technology:

Forging

tensile strength:

370MPa~480MPa

Processing Service:

deep processing

execution standard:

National Standard

quality grade:

A-level

Processing & Customization:

yes

Is it imported:

No

weight:

one

Scope of application:

rail transit

delivery service:

Can be delivered to the factory

Type of goods sales:

spot

Item Number:

twenty thousand one hundred and twenty

warehouse address:

Cangzhou, Hebei

warehouse phone:

fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven

manufacturer:

Cangzhou Shuntian Steel Pipe Co., Ltd

Retail Price

5.00USD


重量

kg

  • Product Description
  • grade

    Observation standard

    cross-sectional shape

    round bar

    surface treatment

    glossy surface

    Processing Technology

    Forging

    tensile strength

    370MPa~480MPa

    Processing Service

    deep processing

    execution standard

    National Standard

    quality grade

    A-level

    Processing & Customization

    yes

    Is it imported

    No

    weight

    one

    Scope of application

    rail transit

    delivery service

    Can be delivered to the factory

    Type of goods sales

    spot

    Item Number

    twenty thousand one hundred and twenty

    warehouse address

    Cangzhou, Hebei

    warehouse phone

    fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven

    manufacturer

    Cangzhou Shuntian Steel Pipe Co., Ltd

    Description :

      Huzhou sales observation standard L-type stainless steel settlement observation point in stock and now available for shipment

      Summary:

      Based on the Nanjing Yangtze River ultra large diameter mud water shield tunnel project, corresponding tests were conducted by burying surface settlement observation points, inclinometers, soil pressure gauges, and pore water pressure gauges in the starting test section Study the disturbance mechanism, disturbance law, influence range and degree of soil in each stage of slurry balance shield tunneling The correlation between stress disturbance degree and distance was analyzed, and based on this, the significant stress disturbance area of the soil caused by shield tunneling (stress disturbance degree ≥ 5%) was calculated to be 16 meters outside the shield tunnel (approximately twice the tunnel diameter) Establish a mathematical model for the relationship between incision pressure, synchronous grouting pressure, and surface settlement, and further revise the Peck formula to better estimate the surface settlement caused by slurry shield tunneling Exploring measures to reduce soil disturbance based on shield tunneling parameters

      Settlement observation data should be promptly organized and properly stored as part of the technical archives of the project. (1) Based on the measurement of benchmark points, each observation point and its successive settlement amount are obtained (settlement observation results table). (2) The location map of observation points drawn based on the floor plan of buildings and structures, and the relationship curve chart between settlement, foundation load, and duration drawn based on settlement observation results (it is required that a curve chart be drawn for each observation point). (3) Calculate the average settlement, relative bending, and relative tilt values of buildings and structures. (4) The plan layout and structural diagram of benchmark points, and all original data for measuring settlement. (5) A settlement observation analysis report based on the above content (which should include a brief explanation of engineering geology and engineering design)

      The engineering status is marked by a certain floor (or elevation) for general civil buildings; Industrial buildings are marked with different load stages as status indicators. For each settlement observation, the settlement amount and cumulative settlement amount between adjacent observation points should be checked. If the settlement is too large or uneven, measures should be taken in a timely manner. The numbering of each observation point in the column for other observation points should be consistent with the numbering in the settlement observation diagram.

    AfterSalesService :

    Key words:
    • Huzhou Sales Observation Standard