Quanzhou Observation Standard 304 Stainless Steel Observation Elevation Iron Bearing Platform Six piece Set Settlement Observation Point
Quanzhou Observation Standard 304 Stainless Steel Observation Elevation Iron Bearing Platform Six piece Set Settlement Observation Point

Quanzhou Observation Standard 304 Stainless Steel Observation Elevation Iron Bearing Platform Six piece Set Settlement Observation Point

Category:

metallurgy/Stainless steel material/Stainless steel bars

Model:

Brand:

Cangzhou Shuntian

grade:

Observation standard

cross-sectional shape:

round bar

surface treatment:

glossy surface

Processing Technology:

Forging

tensile strength:

370MPa~480MPa

Processing Service:

deep processing

execution standard:

National Standard

quality grade:

A-level

Processing & Customization:

yes

Is it imported:

No

weight:

one

Scope of application:

rail transit

delivery service:

Can be delivered to the factory

Type of goods sales:

spot

Item Number:

twenty thousand one hundred and twenty

warehouse address:

Cangzhou, Hebei

warehouse phone:

fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven

manufacturer:

Cangzhou Shuntian Steel Pipe Co., Ltd

Retail Price

12.00USD


重量

kg

  • Product Description
  • grade

    Observation standard

    cross-sectional shape

    round bar

    surface treatment

    glossy surface

    Processing Technology

    Forging

    tensile strength

    370MPa~480MPa

    Processing Service

    deep processing

    execution standard

    National Standard

    quality grade

    A-level

    Processing & Customization

    yes

    Is it imported

    No

    weight

    one

    Scope of application

    rail transit

    delivery service

    Can be delivered to the factory

    Type of goods sales

    spot

    Item Number

    twenty thousand one hundred and twenty

    warehouse address

    Cangzhou, Hebei

    warehouse phone

    fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven

    manufacturer

    Cangzhou Shuntian Steel Pipe Co., Ltd

    Description :

      Quanzhou Observation Standard 304 Stainless Steel Observation Elevation Iron Bearing Platform Six piece Set Settlement Observation Point

      In order to ensure that the tunnel project can be completed with the required accuracy, which requires high standards for every aspect of the entire project, yesterday I brought you the key points of tunnel measurement. Today, I will introduce several methods of horizontal control measurement and provide detailed measurement steps.

      1: Plane control measurement: In tunnel engineering, it is mainly used to determine the plane position of each control point at the entrance, in order to guide the design in reverse underground, guide tunnel excavation, and achieve the required accuracy for penetration.. (Note: The planar control network includes planar control points)

      Detailed explanation on plane control measurement in tunnel engineering

      1: Alignment method: This method is suitable for short length straight tunnels. We set the entrance points of the straight tunnel as two points, and then mark the centerline direction of the straight tunnel on the ground to obtain the two points located in the straight direction at the measurement location. Using a theodolite, we extend the straight line in the direction of the approximate azimuth using a forward and backward mirror, and measure and calculate the lengths using the theodolite line of sight method. (Note: The relative error of distance measurement cannot exceed 1:5000)

      2: Triangle network method: This method is suitable for mountainous areas with long tunnels and complex terrain. It requires measuring all angles and multiple side lengths of the triangle network, or all side lengths, to make it a corner network. The point accuracy of the triangle network is high, which is conducive to controlling the lateral error of the tunnel.

      Detailed explanation on plane control measurement in tunnel engineering

      2: Wire measurement method: Connect two tunnel entrances and set up a wire. The turning angle of the wire needs to be observed using a U2 level theodolite, and the distance needs to be measured using a photoelectric rangefinder. By reverse calculating the coordinates of two points at the entrance, the distance and azimuth in the direction of the line connecting the two points can be obtained. Based on this data, the excavation direction can be calculated. (Note: The relative error cannot exceed 1:10000)

    AfterSalesService :

    Key words:
    • Quanzhou Observation Standard